VP ShiniCube 1600TL User manual

User Manual
Operator
1600TL 2200TL 2800TL 3300TL
Installer
Maintainer
EN
PV Grid-Tied Inverter


For readers
This manual is applicable for technicians of inverter installation, operation and mainte-
nance. The reader shall be familiar with electrical knowledge.
About this manual
Please carefully read through this manual before using the product. This manual shall be
well kept in a place easy for using. Persons to operate the product as per this manual must
be a qualified electrical engineer certified by the local electrical authority.
Copyright
The copyright of this manual belongs to Wuxi Victory Power New Energy Technology Co.,
Ltd. No part or the entire of this manual can be reproduced in public without a written
permission.
Because of the continuous product upgrading, this manual will be updated correspondingly,
and thus there will be some unconformity between the manual description and the product,
and the user can acquire the most updated version from or Victory
Power will not be responsible for informing the user of manual updating.
www.victorypower.com
About Victory Power
Thank you for use the photovoltaic grid-tied inverter from the research, development and
manufacture of Victory Power.
Victory Power, a high-tech enterprise in the new energy industry, is mainly engaged in the
supply of perfect power source inverting products and technical services for solar
photovoltaic power generation, wind power generation and renewable energy power
generation system, and the products and services are mainly used in the renewable energy
grid-tied power generation system, off-grid village power supply system and private power
supply system.
Instruction Manual
Applicable models
This manual provides the instruction for the installation, operation and maintenance of
photovoltaic grid-tied inverters ShiniCube1600TL-ShiniCube3300TL.The following
models of inverter are related:
ShiniCube2200TL ShiniCube3300TL
ShiniCube2800TL
ShiniCube1600TL
Introduction
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN

Revision
VP-UMSC1.0.0EN 2011.09.19 Rev. 1
Revised version No. Date Description
Introduction ShiniCube1600TL-3300TL User Manual
Victory Power New EnergyVictory Power New Energy VP-UMSC1.0.0ENVP-UMSC1.0.0EN

Symbols in this manual
Important safety instruction
Danger
Warning
Notice
Caution
Tip
Instruction
It means a moderately potential danger which may cause a
serious personal injury or death directly if this warning is
neglected.
It means a lightly potential danger which may cause a light or
moderate personal injury or serious property loss if this
warning is neglected.
It means a potential risk which may cause device malfunction
or property loss if this warning is neglected.
It means a helpful reference or notice.
It means a highly potential danger which may cause a serious
personal injury or death directly if this warning is neglected.
It means an additional notice emphasizing or complementing
the content, or providing a tip for optimizing the product ope-
ration, and further help you solve some problem or save some
time.
To ensure the personal and property safety in using the photovoltaic inverter and the
high efficiency of the product, related safe operation notices are provided in the manual,
and corresponding symbols are used for emphasizing the importance. These important
notices must be fully understood and followed. Symbols used in this manual are listed
below to help you carefully read and use this manual.
Important safety instruction
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN

The inverter is attached with some labels related to operation safety. Please don't install
the device before carefully read through and fully understand these labels.
Danger of high voltage and electric shock!
Danger of high temperature and burn injury!
Earth line!
The wasted product must be sent to the authorized collecting center.
Please carefully read through and fully understand the instruction manual
before using the product.
Certified by Australia AS4777.
Acceptable in the test of insulation and voltage resistance.
Acceptable in the functional test.
Acceptable in the quality inspection.
Symbols on the inverter
It means there is still residual voltage in the inverter! The capacitor is still
electrified after the AC/DC side of the inverter is cut off, so the inverter can-
not be maintained within 10min till the capacitor is completely discharged.
Important safety instruction ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN

1 Safety instruction 1..................................................... .........
2 Product description 4............................................................
3 Installation 8......................................................................
11 1.................................................................Before installation
21...............................................................Product applicability 4
22....................................................................Circuit structure 4
23..............................................................Product introduction 5
231 5.. ................................................Electrical connecting part
232 6.. ..................................................Dimensions and weight
233.. ......................................................LCD Displaying panel 6
234.. ...............................................................Product label 7
31 8.................................................................Safety instruction
32 8............................................................Installation procedures
33 9...................................................Preparation before installation
34 10..............................................Selection for a installation position
35 12...............................................................Inverter installation
351.. ......................................................Installation on a wall 12
352 13.. .................................................Installation on a support
353 14.. ...................................................Optional anti-theft lock
331 9.. .....................................................Unpacking and check
332 10.. .....................................................Preparation for tools
12 2..................................................................During installation
13............................................................................Operation 2
14................................................................................Repair 3
15..................................................................................EMC 3
Contents
Contents
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN

4 Trial operation 29..................................................................
5 Human-machine interaction 30...................................................
362 16.. ................................Structure of the communication system
363 19.. ................................Wiring terminals and cable specification
364 21.. ...........................................Steps for electrical connection
365 28.. .....................................................Earthing requirement
41 29............................................................Check before operation
42...............................................................Electrify the inverter 29
51.......................................................................LCD interface 30
52 31..............................................................Internal data storage
53 32..............................Introduction to the function of monitor software
531.. .............................................................Main interface 32
532 32.. ......................................................Device management
533.. ................................................................Data review 32
534 33.. .........................................................Parameter setting
541 34.. .........................................................Standing-by state
542 34.. ...................................................Power generating state
543 35.. ...........................................................Protection state
544.. ..................................................................Fault state 35
54.............................................................Inverter working mode 33
411 29.. .........................Check for reliability of mechanical installation
412 29.. ..............................................Check for connecting cables
413.. .............................................................Electrical check 29
36 15..............................................................Electrical connection
361 16.. .................................Electric and electrical system structure
Contents ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN

6 Troubleshooting and maintenance 38...........................................
7 Uninstallation 42...................................................................
8 Technical parameters 43..........................................................
9 Quality assurance 45..............................................................
10 Contact Victory Power 47........................................................
61....................................................................Troubleshooting 38
10 1............................................................About Victory Power 47
10 2 47.........................................................Contact Victory Power
62.................................................................Daily maintenance 41
71.................................................................Uninstalling steps 42
72..............................................................................Packing 42
73...............................................................................Storing 42
74 42.....................................Solution at the termination of service period
91..................................................................Quality assurance 45
92...............................................................................Rights 45
93...................................................................Exception clause 45
94 46............................................................Quality assurance card
545.. .................................................................Fault state 36
546.. ..............................................................Sleeping state 36
55....................................................LCD panel power saving mode 37
Contents
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN

1 Safety instruction
1 1 Before installation.
ShiniCube inverters are designed, manufactured and tested as per international safety
standards. However as an electrical and electric product, it must be installed, operated
and maintained strictly according to related safety notices.
Please contact the nearest authorized maintenance center or Victory Power if you need
to maintain or repair the product. Please never repair the product by yourself, or there
may be some personal injury or property loss.
Please don't start to install or debug the device before fully understand all the instruc-
tion in the manual and get familiar with all safety symbols in each paragraph.
Please contact Victory Power if you encounter some puzzle
in reading the following information.
Tip
Victory Power will take no responsibility for any personal injury or property loss caused
by any misoperation.
Misuse or misoperation may harm:
The inverter cannot be connected to the grid unless approved
by the electrical authority, and it must be installed according
to the local standard and related standard for an electrical
enterprise.
The personal safety of the operator or a third person;
The property safety of the inverter or any other property.
Please check if the inverter is damaged during transportation
when your receive the product. If you found any defect, please
contact Victory Power and the transportation agency immedia-
tely.
The inverter has electromagnetic radiation, so it is not
suitable for installing in the bedroom or living room, etc.
Please choose a suitable place for installation.
Warning
Warning
Notice
Notice
safety instruction ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
1/47

1.2 During installation
The inverter must be installed by a qualified electrical engineer
certified by the local authority, and the installation manual must
be read through before installation.
Please cover the photovoltaic battery board by lightproof
material or cut off the DC circuit breaker before electrical
connection. A dangerous voltage will be generated by the
photovoltaic array exposed in the sunshine.
There may be an electric shock or fire risk if touching any
contact or terminal in the grid or device;
Please pay attention to all instruction or safety notices for
grid connection.
Cables in the photovoltaic power generation system must be
firmly connected, well installed and with suitable specifica-
tion.
It must be installed according to the local standard and related
standard for an electrical enterprise.
The output voltage from the array cannot exceed the maximum
input voltage of the inverter. A higher input voltage may
irreversibly damage the inverter or cause some other loss, and
Victory Power will have right to take no responsibility for
quality assurance or any joint and several liability in this case.
1.3 Operation
The high voltage circuit in the inverter is dangerous for life safety!
This product must be installed in the place away from any child access.
Please take care against burning injury if touching a running inverter;
Only the display screen of the inverter can be touched during operation.
A damaged device or a system fault may cause an electric
shock or fire risk.
Please visually check if the device is damaged or containing
any other danger before operation;
Check if all external devices and circuits are safely
connected. Make sure the device is safety before operation.
Danger
Danger
Warning
Notice
Notice
Danger
Danger
Danger
Caution
safety instruction
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
2/47

1 5 EMC.
EMC (Electro Magnetic Compatibility) means the resistance of a device or system against
generating any electro magnetic interference to the environment without influencing the
normal operation in the electro magnetic environment.
Immunity to the own noise: immunity to the internal electrical noise;
Immunity to the external noise: immunity to the external electro magnetic noise;
Noise radiation level: influence of electro magnetic radiation to the environment.
ShiniCube is researched, developed and manufactured as per the related international
standard, and the electro magnetic radiation level is very low, but as an industrial product,
it is still important to control the electro magnetic radiation.
1.4 Repair
Cut off the electrical connection between the inverter and the grid
and then cut off the DC electrical connection before repairing.
No repair work can be performed within 10min until the
internal elements are fully discharged
The inverter cannot be restarted unless any fault influencing
the inverter safety performance is immediately removed.
Please contact the local authorized maintenance man or
Victory Power if you need to repair the inverter.
Please never dismantle any internal element of the inverter, or
we will take no responsibility for quality assurance or any joint
or several liability for the loss.
The electro magnetic radiation of the inverter is harmful for
health;
Please never stay within 20cm from a running inverter for
long.
Danger
Notice
Notice
Notice
safety instruction ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
3/47

2 Product description
By the ShiniCube grid-tied inverter, the DC voltage generated in the photovoltaic array can
be transformed into AC voltage supplied to the grid. The photovoltaic power generating
system consists of photovoltaic arrayes, inverters, meters and a power grid.
The research, development and manufacture of ShiniCube inverter are integrated with the
most updated techniques and public confirmed safety regulations. However, misoperation
may still cause personal injury or property loss.
Fig. 2-1: Photovoltaic grid-tied power generating system
PV Array Metering GridInverter
2.1 Product applicability
2.2 Circuit structure
Fig. 2-2 shows the internal functional diagram of ShiniCube inverter. After the photovoltaic
input enters the voltage boosting circuit via the filter circuit, the input DC voltage is boosted
and stabilized to the value for the full-bridge inverter circuit, and in this process, the MPP
tracer in the inverter will ensure the DC energy generated in the photovoltaic array can be
used by the inverter circuit at maximum.
This inverter cannot be used for any other or additional purpose. For any loss caused by
using in any undersigned application, the manufacturer and supplier will take no
responsibility. The user will bear the loss from any undersigned application by himself.
Instruction in this manual must be followed for the designed application.
The inverter must be reliably connected to the public power grid. This inverter is not
designed for any moving application.
CPU1 and CPU2 control relay 1 and relay 2 respectively, and thus the system reliability is
highly improved.
The DC voltage is transformed into AC voltage by the full-bridge inverter circuit. CPU1 and
CPU2 control the inverter operation and monitor the operation state, and in any abnormal
working condition the internal relay of the inverter can be cut off to protect the inverter,
external devices and personal safety.
Product description
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
4/47

Fig. 2-3: Schematic drawing for the electrical connecting part
Tab. 2-1: Description for the electrical connecting part of the inverter
Name Description
Solar Input
Zigbee
RS485
Grid Connect
DC Switch
Two pairs of terminals connecting the photovoltaic assembly
External optional Zigbee wireless module
Standard communication mode
Connected to the grid
Optional DC switch
Fig. 2-2: Schematic diagram for the main circuit
DC+
DC-
L
N
PE
Boost MPPT Inverting circuit
Communication port LCD
CPU1 CPU2
Relay 1 Relay 2
2.3 Product introduction
2.3.1 Electrical connecting part
Solar input Zigbee Grid connect
RS485
DC Switch
A DC switch is recommended in consideration of safety. In some
countries, there is imperative requirement for the connection of
photovoltaic assembly and inverter, so the user can select an
applicable ShiniCube inverter to satisfy the requirement.
Instruction
Product description ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
5/47

Fig. 2-4: Inverter dimensions
370mm
162mm
480mm
Tab. 2-2: Inverter weight
Model
Weight
ShiniCube1600TL ShiniCube2200TL ShiniCube2800TL ShiniCube3300TL
20Kg 20Kg 20Kg 20Kg
The inverter works automatically without any user's operating or interfering. The basic
working state including the generating capacity is displayed on the LCD displaying panel.
The inverter displayer is a sound controlled LCD, and it will be turned off and enter the
power saving mode if there is no operation within 2min and will be turned on again by
clicking the inverter shell slightly.
Fig. 2-5: Inverter LCD displaying panel
2.3.2 Dimensions and weight
Waterproof I/O terminals are located at the bottom of the
inverter, so care must be taken in handing and installing the
inverter to protect these terminals from damage.
2.3.3 LCD Displaying panel
Notice
Product description
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
6/47

The product label, attached to the right side of the inverter, contains the basic information
of the inverter. Please pay attention to the inverter model and technical parameters.
Fig. 2-6: ShiniCube inverter label
2.3.4 Product label
Product description ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
7/47

Fig. 3-1: Installation procedures for the inverter
End Trial run Check
Prepare Inverter install Electrical install
Start
3 Installation
3.1 Safety instruction
The DC voltage at the photovoltaic array side and the AC
voltage at the grid side are both higher than the safe voltage.
It is forbidden to touch any electrified terminal directly. Make
sure the DC side is not electrified before installation and
maintenance.
The inverter must be installed, operated or maintained as per the following standard and
instruction, and it cannot be connected to the grid for power generation unless approved
by the local power supply authority, and all operation must be performed by a qualified
electrical engineer.
All electrical installation must be performed according to the local standard for
electrical installation;
3.2 Installation procedures
See the following instruction for details.
Danger
The inverter is delivered without any user's self-maintenance assembly, so please contact
the local authorized installation and maintenance man if you need to maintain your inverter.
Take care of the hot surface of the inverter. E.g.; the heat radiator of the power semi-
conductor will be kept in a high temperature after the inverter is shut down;
A running inverter has a high voltage, so no internal operation can be made within 10
min at least after the AC and DC power supply of the inverter is cut off and it is made
sure by measuring the DC voltage by a multimeter that the capacity is fully discharged;
No internal part except the wiring terminals can be touched during installation;
Installation
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
8/47

The product is carefully tested and checked before transportation, but it is still possible
to be damaged during transportation, so please check the device again before installation.
If any damage is found, please contact the transportation agency or directly contact WuXi
Victory Power New Energy Technology Co., Ltd. Please provide us photos of damage, and
we will feed back the fastest and best service.
Fig. 3-2: Items in the package
Tab. 3-1: Package list
Description
Inverter
Installation back board
Package list
No.Remark
1
2
3
1 set
1 pcs
1 pcs Check the delivery according to the package list.
User manual
41 book Please read through carefully.
Warranty card
51 sheet Please well keep for filling and returning us if
there become any fault in the inverter.
Certification
61 sheet
Expansion tubes
76 pcs For the back board installation
Tapping screws
86 pcs For the back board installation
Tube type pre-insulated terminals
98 pcs For connecting communication cables
OT cold pressed terminals
10 8 pcs For connecting electrical cables
Allen wrench
11 1 pcs For dismantling the bottom cover from the
inverter
3.3 Preparation before installation
3.3.1 Unpacking and check
Qty
Please never dispose the original package of your own accord. Check if the delivery is
completed according to the package list. The delivery contains the following items:
Package List
Description
Inverter
Installationback board
Packagelist
No.No.Remark
1
2
3
1se t
1pc s
1pc s Checkthe delivery according to the package list.
Usermanual
41bo ok Pleasereadthrough carefully.Pleaseread through carefully.
Warrantycard
51sheet Pleasewell keep for filling and returning us if
therebecome any fault in the inverter.
Pleasewell keep for filling and returning us if
therebecome any fault in the inverter.
Certification
61sheet
Expansiontubes
76pc s Forthe back board installation
Tappingscrews
86pc s Forthe back board installation
Tubetype pre-insulated terminals
98pc s Forconnecting communication cables
OTcold pressed terminalsOTcold pressed terminals
10 8pc s Forconnecting electrical cables
Allenwrench
11 1pc s Fordismantling the bottom cover from the
inverter
Fordismantling the bottom cover from the
inverter
Qty
Inverter Installationback board
Usermanual Packagelist
Description
Inverter
InstallationbackboardInstallationbackboard
Packagelist
No.No.Remark
1
2
3
1set
1pcs
1pcsCheck th e deliv ery acc ordin g to the pa ckage l ist.Checkthedeliveryaccordingtothepackagelist.
Usermanual
41bookPleasereadthrough carefully.Pleasereadthroughcarefully.
Qualityassurancecard
51sheet1sheetPleasewellkeepforfillingandreturningusifthere
becomeanyfaultintheinverter.
Pleasewellkeepforfillingandreturningusifthere
becomeanyfaultintheinverter.
AcceptancecertificateAcceptancecertificate
61sheet1sheet
Expansiontubes
76pcsForthe back board installation
TappingscrewsTappingscrews
86pcsForthe back board installation
Tubetypepre-insulatedterminalsTubetypepre-insulatedterminals
98pcsForconnecting communication cablesForconnectingcommunication cables
OTcoldpressedterminals
10 8pcsForconnecting electrical cablesForconnectingelectricalcables
Allenwrench
11 1pcsFordismantling the bottom cover from the inverterFordismantlingthebottomcoverfromtheinverter
Qty
Packagelist
WuXiVictoryPowerNewEnergyTechnologyCo.,Ltd.
Warrantycard
Part
Certification
Allenwrench
UserManual
Operator
1600TL2200TL2800TL 3300TL
Installer
Maintainer
EN
PVGrid-TiedInverter
WarrantyCard
CustomerInformation
Name:Name:
ZipCode E-mail::ZipCode E-mail::
Tel Fax::Tel Fax::
Address:Address:
InstallationInformationInstallationInformation
PVmoduletype(parameters):PV module type (parameters):
NumberofStrings ModulesPerString::NumberofStrings ModulesPerString::
SystemCommissioningDate Installationsite::SystemCommissioningDate Installationsite::
::InstallationCompany InstallerName::InstallationCompany InstallerName
Inverterdetailedinformation
FaultTime ModelofProducts::FaultTime ModelofProducts::
::NumberofusedProducts NumberofFaultProducts::NumberofusedProducts NumberofFaultProducts
:SeriesNo.ofFaultProductsSeriesNo.ofFault Products:
:DateofBillofLading:DateofBillofLading
FaultMessages:FaultMessages:
BriefFaultDescriptionandPhotos(Canbeattached):BriefFaultDescriptionandPhoto s(Can b e attac hed):
CustomerSignature:CustomerSignature:Date:Date:
Fortheinformationonourwarrantytermsandconditions,pleasesee
ourwebsite:http://www.victorypower.com.
Fortheinformationonourwarrantytermsandconditions,pleasesee
ourwebsite:http://www.victorypower.com.
VictoryPowerNewEnergyVictoryPowerNewEnergy
Inverter Installationbackboard
Usermanual Packagelist
Description
Inverter
Installationbackboard
Packagelist
No.No.Remark
1
2
3
1set1set
1pcs
1pcsCheckthedeliveryaccordingtothepackagelist.Checkthedeliveryaccordingtothepackagelist.
Usermanual
41bookPleasereadthroughcarefully.
QualityassurancecardQualityassurancecard
51sheet1sheetPleasewellkeepforfillingandreturningusifthere
becomeanyfaultintheinverter.
Pleasewellkeepforfillingandreturningusifthere
becomeanyfaultintheinverter.
Acceptancecertificate
61sheet1sheet
Expansiontubes
76pcsForthebackboardinstallationForthebackboardinstallation
Tappingscrews
86pcsForthebackboardinstallationForthebackboardinstallation
Tubetypepre-insulatedterminalsTubetypepre-insulatedterminals
98pcsForconnectingcommunicationcablesForconnectingcommunicationcables
OTcoldpressedterminalsOTcoldpressedterminals
108pcsForconnectingelectricalcables
Allenwrench
111pcsFordismantlingthebottomcoverfromtheinvert erFordismantlingthebottomcoverfromtheinverter
Qty
Packagelist
WuXiVictoryPowerNewEnergyTechnologyCo.,Ltd.WuXiVictoryPowerNewEnergy Technology Co., Ltd.
Warrantycard
Part
Certification
Allenwrench
UserManualUserManual
Operator
1600TL2200TL2800TL3300TL
Installer
Maintainer
EN
PVGrid-TiedInverter
WarrantyCard
CustomerInformationCustomerInformation
Name:Name:
ZipCodeE-mail::ZipCode E-mail::
TelFax::Tel Fax::
Address:Address:
InstallationInformation
PVmoduletype(parameters):PVmoduletype(parameters):
NumberofStringsModulesPerString::NumberofStrings ModulesPerString::
SystemCommissioningDateInstallationsite::SystemCommissioningDateInstallationsite::
::InstallationCompanyInstallerName::InstallationCompany InstallerName
Inverterdetailedinformation
FaultTimeModelofProducts::FaultTime ModelofProducts::
::NumberofusedProductsNumberofFaultProducts::NumberofusedProducts NumberofFaultProducts
:SeriesNo.ofFaultProductsSeriesNo.ofFaultProducts:
:DateofBillofLading:DateofBillofLading
FaultMessages:FaultMessages:
BriefFaultDescriptionandPhotos(Canbeattached):BriefFaultDescriptionandPhotos(Canbeattached):
CustomerSignature:CustomerSignature:Date:Date:
Fortheinformationonourwarrantytermsandconditions,pleasesee
ourwebsite:http://www.victorypower.com.
Fortheinformationonourwarrantytermsandconditions,pleasesee
ourwebsite:http://www.victorypower.com.
VictoryPowerNewEnergyVictoryPowerNewEnergy
Inverter Installation back board
User manual Package list Warranty card
Part
Certification
Allen wrench
User Manual
Operator
1600TL 2200TL 2800TL 3300TL
Installer
Maintainer
EN
PVGrid-Tied Inverter
Warranty Card
CustomerInformation
Name:
ZipCode E-mail::
Tel Fax::
Address:
InstallationInformation
PVmodule type (parameters):
Numberof Strings ModulesPer String::
SystemCommissioning Date Installationsite::
::InstallationCompany InstallerName
Inverterdetailed information
FaultTime Modelof Products::
::Numberof used Products Numberof Fault Products
:SeriesNo. of Fault Products
:Date of Bill of Lading
FaultMessages:
BriefFault Description and Photos(Can be attached):
CustomerSignature:Date:
Forthe information on our warranty terms and conditions, please see
ourwebsite: http://www.victorypower.com.
VictoryPower New Energy
Installation ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
9/47

The following tools will be used for installing the inverter:
Fig. 3-3: Tools for installation
3.3.2 Preparation for tools
3.4 Selection for a installation position
Some parts (e.g.: heat radiator) of the inverter runs with a high
temperature, so it is not suitable for installing near inflamma-
bles or explosives.
Danger
Notice
When selecting an installation position, please avoid the
influence of noise and electro magnetic radiation to the
environment;
Notice
The inverter performance will be degraded if the environmental
temperature is 45 above. Make sure the inverter is installed
in a well ventilated place so that the power generation can be
maximized.
℃
The inverter cannot be installed near any place of high
external electro magnetic radiation (e.g.: a TV tower,
communication signal tower or HV cables).
ф6 percussion drill Press pinchers Screw driver and wrench Multimeter Hammer
Installation
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
10/47

The inverter with a protection level of IP65 can be installed in the open air;
Detailed requirement for the installation position:
The inverter cannot be installed under direction sunshine, or the internal temperature
of the inverter will be excessively high and thus the inverter performance will be
degraded for protecting the internal elements; or even the temperature protection
will be activated by the excessively high temperature;
The inverter shall be installed in a clean environment that the environmental temper-
ature is -25 C + 60
O―;
OC
The environmental relative humidity is not higher than 95% and without any
condensation;
For avoiding burning injury or electric shock, the inverter shall be installed beyond the
touch distance of a child. The temperature of some parts (e.g.: the heat radiator) is
quite high when the inverter is running;
Make sure the installation position will not shake;
The inverter shall be installed in a well ventilated place to ensure the normal heat
radiation;
The installation place shall be firm enough to support the inverter weight for long;
The inverter shall be installed on a vertical wall, or within 15° at most if backwards to
the wall.
Connecting terminals are located at the bottom.
Fig. 3-4: Selecting a position for installation
The inverter LCD shall be leveled with eyes and with enough space in the front for
inspection;
Installation ShiniCube1600TL-3300TL User Manual
Victory Power New Energy VP-UMSC1.0.0EN
11/47
This manual suits for next models
3
Table of contents
Popular Inverter manuals by other brands

Selectronic Australia
Selectronic Australia LD550-24 operating manual

Deye
Deye SUN-30K-G04 user manual

Covidien
Covidien VNUS RFG2 Operator's manual

American Power Systems
American Power Systems APS-500-DCH-28 Operation guide

Studer
Studer xtender xtm quick guide

Solaro Energy
Solaro Energy Solaro Aire SA-20WR-GAE installation instructions