manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Zip Tie Domes
  6. •
  7. Outdoor Furnishing
  8. •
  9. Zip Tie Domes 1 Extension Tunnel Dome User manual

Zip Tie Domes 1 Extension Tunnel Dome User manual

Popular Outdoor Furnishing manuals by other brands

felton industries FELEPG5T6 Assembly instruction

felton industries

felton industries FELEPG5T6 Assembly instruction

Dreamo OTF-503S quick start guide

Dreamo

Dreamo OTF-503S quick start guide

Garden Furniture Direct Borrowdale Assembly instructions

Garden Furniture Direct

Garden Furniture Direct Borrowdale Assembly instructions

Rowlinson Clarendon Assembly instructions

Rowlinson

Rowlinson Clarendon Assembly instructions

Garden Treasures 8201268 Assembly instructions

Garden Treasures

Garden Treasures 8201268 Assembly instructions

Safavieh Outdoor Marson PAT7062 quick start guide

Safavieh Outdoor

Safavieh Outdoor Marson PAT7062 quick start guide

SSC-LUXon 990070716 Assembly & operating instructions

SSC-LUXon

SSC-LUXon 990070716 Assembly & operating instructions

supremo LEISURE 2-Seat Stool 110*40cm Assembly instruction

supremo LEISURE

supremo LEISURE 2-Seat Stool 110*40cm Assembly instruction

Hatteras Hammocks DCA1-K-HH instructions

Hatteras Hammocks

Hatteras Hammocks DCA1-K-HH instructions

Lemeks Palmako PA120-5959 Assembly, installation and maintenance manual

Lemeks

Lemeks Palmako PA120-5959 Assembly, installation and maintenance manual

OLT 24 Assembly manual

OLT

OLT 24 Assembly manual

forest-style HACIENDA 2354 Building instructions

forest-style

forest-style HACIENDA 2354 Building instructions

Courtyard Creations RUS0188-WM Assembly instructions

Courtyard Creations

Courtyard Creations RUS0188-WM Assembly instructions

kingsley-bate MC-55 Assembly instructions

kingsley-bate

kingsley-bate MC-55 Assembly instructions

Weltevree Carrier product manual

Weltevree

Weltevree Carrier product manual

Grange Fencing Elite Arch Assembly instructions

Grange Fencing

Grange Fencing Elite Arch Assembly instructions

Grosfillex AUVENT YR14 Assembly instructions

Grosfillex

Grosfillex AUVENT YR14 Assembly instructions

X-METAL EAGLE 33511 Assembly instructions

X-METAL

X-METAL EAGLE 33511 Assembly instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Zip Tie Domes
1 Extension
Tunnel Dome
Assembly Manual
(c) 2022 Zip Tie Domes
1857 B indley Hollow Rd
Buffalo Valley, TN 38548
(931) 858-6892
Zip Tie Domes – 1 Extension Tunnel Dome Assembly Manual
Side View
End View
Top View
Zip Tie Domes – 1 Extension Tunnel Dome Assembly Manual
Tools Needed: 8’ Stepladde , Wi e Cutte s.
SAFETY NOTICE: Do not limb on the dome. It is not designed for limbing.
The dimensions of this dome a e:
Height: 8’ 8-3/8”
Width: 17’ 4-3/4”
Length: 25’ 10-3/8”
Floo space: 377 squa e feet
Step 1. Find a level a ea wide enough to assemble the dome.
Step 2. Unpack the dome mate ials whe e the dome will be const ucted. Use wi e
cutte s o manually unwind the wi e fo eleasing the st uts f om the est aining wi es.
This package will include:
42 Blue “A” St uts 5’ in length.
26 Black “B” St uts 4’ 9-7/8” in length
30 Red “C” St uts 4’ 2-5/8” in length
8 Yellow “D” St uts 4’ 10-1/2” in length
2 Suppo t St uts 8’ 6” in length (when assembled).
32 Blue 6-way Hubs,
Standa d Hub Dual Cove ing Hub
3 Pu ple Suppo t Hubs
Standa d Hub Dual Cove ing Hub
6 Red 5-way Hubs,
Standa d Hub Dual Cove ing Hub
41 Cente Rings,
and 212 Zip Ties.
The Zip Ties a e available as
120 lb UV esistant Nylon
ties fo building smalle
domes, o 350 lb Stainless
Steel ties fo building la ge
st uctu es.
Nylon Zip Ties Stainless Steel Zip Ties
How to Atta h the Hubs to the Struts
Put the end of the st ut into the opening on
the side of the hub.
Inse t a zip tie into the end of the st ut.
Place a cente ing on the end of the st ut.
Loop the zip tie th ough the cente ing.
Tighten the zip tie to secu e the cente ing
to the st ut.
Step 3. Tunnel Dome Constru tion. Building the Foundation.
A1. Take 2 blue st uts and lay them in a
slight “V” at one end of the dome footp int.
A2. Take two black st uts and put a black
st ut on the ends of the blue st uts in the
shape of a ci cle.
A3. Take two yellow st uts and put a
yellow st ut on the ends of the black st uts,
in the shape of the tunnel dome.
A4. Take two blue st uts and put a blue
st ut on the ends of the yellow st uts, along
the length of the tunnel dome.
A5. Take two yellow st uts and put a
yellow st ut on the end of each of the blue
st uts.
A6. Take two black st uts, and place them
at the ends of the yellow st uts, in the fo m
of a ci cle.
A7. Complete the end of the tunnel dome
foundation with two blue st uts.
A8. Take 14 blue hubs and 14 cente ings.
Put a blue hubs and cente ing between
eve y st ut, and connect them togethe to
c eate the tunnel dome foundation.
The st uts should be inse ted on opposite
sides of the hub, o 180 deg ees apa t, and
attached to the cente ing with zip ties.
Building the First Tier:
All st uts and hubs will be placed on the outside of the foundation ing.
B1. Take 8 Red St uts and 4 Red Hubs.
Lay the st uts and hubs in the shape of a 4
ed t iangles ove the 4 black st uts nea the
ends of the tunnel dome foundation.
B2. Take 4 blue st uts, and put a blue “V”
whe e two blue st uts meet at the ve y ends
of the tunnel dome.
B3. Take 4 blue st uts and two pu ple
suppo t hubs. Put a blue t iangle with a
pu ple suppo t hub ove the 2 blue st uts on
the sides of the tunnel dome.
The Standa d pu ple suppo t hub will have
cu ved slots along the edge of the hub.