ABB NGC Series User manual

Other ABB Measuring Instrument manuals

ABB XRC G5 User manual

ABB

ABB XRC G5 User manual

ABB FXE4000 Training manual

ABB

ABB FXE4000 Training manual

ABB Navigator 550 Sodium wet-section Use and care manual

ABB

ABB Navigator 550 Sodium wet-section Use and care manual

ABB 2155 User manual

ABB

ABB 2155 User manual

ABB Relion RES670 User manual

ABB

ABB Relion RES670 User manual

ABB Navigator 600 Phosphate User manual

ABB

ABB Navigator 600 Phosphate User manual

ABB LWT300 series User manual

ABB

ABB LWT300 series User manual

ABB NGC8200 User manual

ABB

ABB NGC8200 User manual

ABB FAM3200 Series Installation and operation manual

ABB

ABB FAM3200 Series Installation and operation manual

ABB ProcessMaster FEP611 User manual

ABB

ABB ProcessMaster FEP611 User manual

ABB SensyMaster FMT230 Installation and operation manual

ABB

ABB SensyMaster FMT230 Installation and operation manual

ABB ICOS GLA151 Series User manual

ABB

ABB ICOS GLA151 Series User manual

ABB LS4000 User manual

ABB

ABB LS4000 User manual

ABB C13 User manual

ABB

ABB C13 User manual

ABB FieldIT AquaMaster User manual

ABB

ABB FieldIT AquaMaster User manual

ABB WaterMaster User manual

ABB

ABB WaterMaster User manual

ABB Sensi+ User manual

ABB

ABB Sensi+ User manual

ABB EXCOUNT-II User manual

ABB

ABB EXCOUNT-II User manual

ABB MR Series Manual

ABB

ABB MR Series Manual

ABB Endura AZ20 series User manual

ABB

ABB Endura AZ20 series User manual

ABB Aztec 600 User manual

ABB

ABB Aztec 600 User manual

ABB CM-UFD.M21 Supplement

ABB

ABB CM-UFD.M21 Supplement

ABB Advance Optima Caldos 15-Ex User manual

ABB

ABB Advance Optima Caldos 15-Ex User manual

ABB Nitrate 8236 User manual

ABB

ABB Nitrate 8236 User manual

Popular Measuring Instrument manuals by other brands

Powerfix Profi 278296 Operation and safety notes

Powerfix Profi

Powerfix Profi 278296 Operation and safety notes

Test Equipment Depot GVT-427B user manual

Test Equipment Depot

Test Equipment Depot GVT-427B user manual

Fieldpiece ACH Operator's manual

Fieldpiece

Fieldpiece ACH Operator's manual

FLYSURFER VIRON3 user manual

FLYSURFER

FLYSURFER VIRON3 user manual

GMW TG uni 1 operating manual

GMW

GMW TG uni 1 operating manual

Downeaster Wind & Weather Medallion Series instruction manual

Downeaster

Downeaster Wind & Weather Medallion Series instruction manual

Hanna Instruments HI96725C instruction manual

Hanna Instruments

Hanna Instruments HI96725C instruction manual

Nokeval KMR260 quick guide

Nokeval

Nokeval KMR260 quick guide

HOKUYO AUTOMATIC UBG-05LN instruction manual

HOKUYO AUTOMATIC

HOKUYO AUTOMATIC UBG-05LN instruction manual

Fluke 96000 Series Operator's manual

Fluke

Fluke 96000 Series Operator's manual

Test Products International SP565 user manual

Test Products International

Test Products International SP565 user manual

General Sleep Zmachine Insight+ DT-200 Service manual

General Sleep

General Sleep Zmachine Insight+ DT-200 Service manual

Sensa Core Lacto Spark user manual

Sensa Core

Sensa Core Lacto Spark user manual

VOLTCRAFT UTS-1980 operating instructions

VOLTCRAFT

VOLTCRAFT UTS-1980 operating instructions

EBCHQ 94915 Operation manual

EBCHQ

EBCHQ 94915 Operation manual

Balluff BIP LD2-T017-01-EP-S4 Series user guide

Balluff

Balluff BIP LD2-T017-01-EP-S4 Series user guide

Pulsar IMP Lite Series instruction manual

Pulsar

Pulsar IMP Lite Series instruction manual

ETCR 6800 user manual

ETCR

ETCR 6800 user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

  NGCSERIESQUICKSTARTGUIDE|2106235-001(AA)
Comm1 and Comm 2 Pin-outs/Terminations
PIN RS232 RS485 RS422
COMM 1 (J8) COMM 1 (J8) COMM 1 (J8)
1 Power Out Power Out Power Out
2 Ground Ground Ground
3 Switched Power Out Switched Power Out Switched Power
Out
4 Operate Operate Operate
5 Not Used RRTS RTS
6 Request To Send Bus + Transmit Bus +
7 Transmit Data Bus - Transmit Bus -
8 Receive Data No Connection Receive Bus +
9 Clear To Send (CTS) No Connection Receive Bus -
COMM 2 (J10) COMM 2 (J10) COMM 2 (J10)
1 Power Out Power Out Power Out
2 Ground Ground Ground
3 Switched Power Out Switched Power Out Switched Power
Out
4 Operate Operate Operate
5 Not Used RRTS RTS
6 Request To Send Bus + Transmit Bus +
7 Transmit Data Bus - Transmit Bus -
8 Receive Data No Connection Receive Bus +
9 Clear To Send (CTS) No Connection Receive Bus -
TERMINATIONS Comm 1 (J9) Comm 2
(J11)
First or Intermediate Unit (RS-485) Pins 2–3 Pins 2–3
Last or Only Unit (RS-485) Pins 1–2 Pins 1–2
RS232 Pins 2–3 Pins 2–3
Figure 1: Tubing layout
# Name
1Carrier gas
2Cal gas
3Feed through
assembly
4
Sample
conditioning
module
5Sample probe
6Vent lines
Figure 2: NGC Terminal Board
ABB MEASUREMENT & ANALYTICS
NGC series
Quick start guide
Natural gas analyzers
Gas chromatograph products
Save this guide. Refer to the code above to access
User Manuals and other product information.
Safety and compliance information is included with
the device in the shipping packaging.
We reserve the right to make technical changes or
modify the contents of this document without prior
notice. Regarding purchase orders, agreements
shall prevail. ABB does not accept any responsibility
whatsoever for potential errors or possible lack of
information in this document.
  NGCSERIESQUICKSTARTGUIDE|2106235-001(AA)
NGC Quick Start
Connect sample streams
IMPORTANT NOTE: DO NOT use any type of plastic,
Teflon™ or Teflon™ lined braided steel tubing.
Use only good quality, clean, stainless steel
chromatographic-grade transport tubing for carrier,
calibration gas and sample lines. Use of poor quality
stainless steel tubing will generate unsatisfactory
results. H2S applications require Sulfinert tubing.
IMPORTANT NOTE: Use only ultra-high purity grade
carrier gas. Purge all lines prior to connecting to the
device.
IMPORTANT NOTE: Sample conditioning modules
transport tubing run can be up to 50 feet. Lengths
longer than 50 feet must adhere to the rules of
calculated lag time (see NGC User’s Manual).
If a sample conditioning module is not being used, the
sample transport tubing should be 1/16-inch tubing
and no longer than ten feet.
Common Settings
Set Carrier regulator to 90 PSIG,
Calibration blend should be set to 15-20 PSIG.
Sample Probe Regulators to 15-20 PSIG and ensure
valves are open.
Power supply information
For a 12-volt NGC set the power supply voltage to 14-
14.5 volts. For a 24-volt unit set the voltage to 25-26.5
volts.
Recommended wire size is 12AWG.
See the NGC User’s Manual for other applications such
as battery power.
Start up using USB
After the unit has been powered up for a minimum of 2
hours for temperature stabilization continue with the
following steps:
Verify carrier, sample, and cal pressures are set
correctly.
Connect USB cable (to connect using ethernet
please consult the user manual).
Verify that ActiveSync /Windows Mobile Device
Center connects to the NGC.
1. Start PCCU32.
2. Select Setup icon
3. Select ActiveSync from connection types
4. Close setup window.
5. Select Connect from Toolbar
6. Select Entry Setup
a. The Start-up Wizard will initialize to assist with
analyzer setup. If you choose not to use the Wizard
or it fails to start, continue with the next step.
7. Select Show Tree View (on left)
8. Select Totalflow from top of tree.
9. In Station Setup Tab, under the Value Column
select Totalflow.
10. Chane the default ID.
11. Select send.
12. Select Analyzer Operation in the tree view (on
the left) to open the Main Screen.
13. Select Stream Sequence tab, enable the streams
to be used.
14. Select Send.
15. Select Diagnostics (on the right) to verify
Diagnostic tests were successful.
b. Unused streams will fail stream tests since no
pressure is applied
16. Select Calibration (on the right)
Enter calibration blend information from certificate.
Verify blend total equals 100%.
17. Select Send.
18. Close Window.
19. Select Peak Find (on the right). Verify that
Manual is selected. (DO NOT USE AUTO)
20. Select Run Single Cycle.
Review the chromatogram
Verify that all peaks are gated and labeled.
Verify that the reference peaks have appropriate
retention times and there are no alarms.
21. Select CAL button (on the left side of the main
screen).
IMPORTANT NOTE: Calibration will take approximately
30 minutes.
After calibration is accepted:
22. Select stream 4 to run calibration gas one more
time.
After the stream starts
23. Select the HOLD button so it only runs one time.
a. This will update stream data.
Verify stream 4 results are acceptable
24. Select Run (on the left) to put the unit in service
analyzing process stream(s).
To save the configuration:
Select Save & Restore icon from the PCCU toolbar.
Select SAVE and follow instructions.
Congratulations, you’ve successfully started up an ABB
NGC analyzer!
TCP connection
Refer to the User’s manual for setup instructions.
Use this IP address: 169.254.0.11
Gas Chromatograph products
Contact us
ABB Inc., Measurement & Analytics
Quotes: totalflow.inquiry@us.abb.com
Orders: [email protected]bb.com
Training: totalflow.tra[email protected].com
Support: [email protected]
+1 800 442 3097 (opt. 2)
www.abb.com/upstream
2106235MNAA
Teflon™ is a registered trademark and a brand name
owned by Chemours.
Copyright© 2019 ABB all rights reserved