Air Design SILVERADO 2014 + User manual

DATE: 26.05.2017 PG.
INSTALLATION MANUAL
1
GM - SILVERADO 2014 +
www.airdesignusa.com
1 pc
ITEM DESCRIPTION
AVHB TAPE
BPUSH PIN WURTH 46
C
DBUTTON HEAD ALLEN
STAINLESS SCREW M4 X 16
EWASHER 3/16
F
GGREASE PENCIL
AUTOMOTIVE ADHESION
PROMOTER
4 pcs
7 pcs
I
1 pc
4 pcs
4 pcs
ECO DOME
1 pc
1 set
Included in
the parts
DRL LED OSRAM PX-5
STAINLESS LOCK NUT M4
POLYURETHANE ADHESIVE
H
J
DRAWING AMOUNT
1 pc
PART # : 1107CNEUGM24A03
FRONT BUMPER GUARD SILVERADO 2014 +
TOOLS
CHECK LIST
*
*
*
*
We recommend 2 persons for installation
READ CAREFULLY BEFORE
INSTALLATION
*Already installed in the part
1”
1/4”
1/2”
DRIVE SLOWLY
25 mph max
DO NOT
WASH CAR
24 hrs
387
K
L
M
1 pc
1 pc
1 pc
FUSE TAPS
FUSE
INSULATED FEMALE CONNECTOR

In case the vehicle counts with
proximity sensors relocate them following
the instructions, otherwise continue with
the rest of the manual.
UNINSTALL SENSOR
IF THE VEHICLE HAS SENSORS FOLLOW STEPS 2 - 7
IF IT DOES NOT HAVE SENSORS GO TO STEP 8 .
DRL ELECTRICAL INSTALLATION DIAGRAM
HEAD LIGHTS
RED
ORANGE
GREEN
GREEN + YELLOW
CONTROL
BOX
BLACK
FUSE
FUSE BOX
- ORANGE: CABLE CONNECTED TO IGNITION
(+) POSITIVE(+) FEED ON FUSE BOX OR WIRE
- BLACK: BATTERY NEGATIVE(-)
- RED: BATTERY POSITIVE(+)
- GREEN: HEAD LIGHTS (+)
LOCATE FUSE SLOT WITH
(+) POSITIVE FEED WHEN
IGNITION IS ON.
TAP A CIRCUIT
FUSE
FUSE TAP
FEMALE
CONNECTOR
ORANGE
CABLE
APPLYPRESSURE
TO FEMALE
CONNECTOR
4
To connect green wire remove
right mud guard to access the
head light harness.
To reinstall mud guard use 4
push pins included.
HEAD LIGHT
DRIVER´S SIDE
PLUG
YELLOW
GREEN
CONTROL
BOX
If the DRL’s did not
turn on inmediatly
when the ignition is
on, please wait for a
few minutes until the
computer resets and
then the lights will
light up.
DATE: 26.05.2017 PG.
INSTALLATION MANUAL
2
GM - SILVERADO 2014 +
México 01 800 623 79 52 / USA 844 280 2775

DRILL FILING
DRILL
DATE: 26.05.2017 PG.
INSTALLATION MANUAL
3
GM - SILVERADO 2014 +
www.airdesignusa.com
1”
INNER VIEW
INNER VIEW INNER VIEW
INSTALL
SECURE 8
1/2”
1”
1”

REMOVE
MOUNT ON BUMPER
FIRST CLEAN ALL OVER THE APPLICATION AREA WITH ACETONE
DATE: 26.05.2017 PG.
INSTALLATION MANUAL
4
GM - SILVERADO 2014 +
México 01 800 623 79 52 / USA 844 280 2775
9
HASH MARKS
DRAW CENTER HASH MARK WITH GREASE PENCIL ON
FRONT BUMPER AND SHEET METAL, THIS WILL ENSURE
FRONT BUMPER WILL BE CENTERED TO GREASE PENCIL
OUTLINE.

LINER
LINER
Hold the liner out
PEEL OFF
WARM SURFACES WITH HEAT GUN IF SURFACE
TEMPERATURE IS TOO COLD.
“CLICK”
“CLICK”
APPLY ADHESIVE
DATE: 26.05.2017 PG.
INSTALLATION MANUAL
5
GM - SILVERADO 2014 +
www.airdesignusa.com
INNER VIEW
1/4”
USE ACETONE TO THROWLY
CLEAN ADHESIVE CHANNEL

PASS DRL CABLE
PASS DRL
CABLES
THROUGH
IF THE VEHICLE HAS SENSORS CONNECT THEM
PLACE
DATE: 26.05.2017 PG.
INSTALLATION MANUAL
6
GM - SILVERADO 2014 +
México 01 800 623 79 52 / USA 844 280 2775
8
9
A full surface contact between tape and
substrate is decisive for good adhesion
performance. Contact is achieved by applying
pressure. In practice a pressure between
40 and 50 N/cm² is usually needed and an
application temperature between 25 and 45
°C or 77 and 113 °F is also necessary. During
application, add-on parts and tapes must have
the similar temperature.
CONNECT

PLACE PUSH PINS
INSTALLED PART
CONNECT CABLES TO BATTERY
SECURE CABLES
CLEAN OFF GREASE PENCIL MARK
DRILL
DATE: 26.05.2017 PG.
INSTALLATION MANUAL
7
GM - SILVERADO 2014 +
www.airdesignusa.com
1/4”

PG.
INSTALLATION MANUAL
1
GM - SILVERADO 2014
www.airdesignusa.com
DATE: 08.01.2016
TOOLS
PART # : 1124NNEJGM24D04
DOOR ROCKER PANEL SET SILVERADO 2014 CREW CABCREW
CHECK LIST
*
ITEM DESCRIPTION
AVHB TAPE Included in
the parts
BGREASE PENCIL
C1 pc
ADHESION PROMOTER
DECO DOME
AMOUNTDRAWING
1 pc
*Already installed in the part
1 pc
We recommend 2 persons for installation
READ CAREFULLY BEFORE
INSTALLATION
DRIVE SLOWLY
25 mph max
DO NOT
WASH CAR
24 hrs

REAR
FRONT
1/8’’ 1/8’’
WASH WITH WATER, DETERGENT AND
SOFT CLOTH OR SPONGE FRONT & REAR ROCKER PANEL
Keep the indicated separation between
the panels and the edge of the doors as
shown in the picture.
FACTORY DOOR MOLDING HAVE
TO BE REMOVED BEFORE
INSTALLING DOOR ROCKER PANEL
PG.
INSTALLATION MANUAL
2
GM - SILVERADO 2014
DATE: 08.01.2016 México 01 800 623 79 52 / USA 844 280 2775

LINER
PEEL OFF
LINER
Hold the liner out
A full surface contact between tape
and substrate is decisive for good
adhesion performance. Contact is
achieved by applying pressure. In
practice a pressure between 40 and
50 N/cm² is usually needed and an
application temperature between 25
and 45 °C or 77 and 113 °F is also
necessary. During application, add-
on parts and tapes must have the
similar temperature.
PLACE
FIRST CLEAN ALL OVER THE APPLICATION AREA WITH ACETONE
WARM SURFACES WITH HEAT GUN IF SURFACE
TEMPERATURE IS TOO COLD.
DRAW CENTER HASH MARK WITH GREASE PENCIL
ON ROCKER PANEL AND SHEET METAL, THIS WILL
ENSURE ROCKER PANEL WILL BE CENTERED TO
GREASE PENCIL OUTLINE.
HASH MARKS
PG.
INSTALLATION MANUAL
3
GM - SILVERADO 2014
www.airdesignusa.com
DATE: 08.01.2016

APPLY PRESSURE
PG.
INSTALLATION MANUAL
4
GM - SILVERADO 2014
DATE: 08.01.2016 México 01 800 623 79 52 / USA 844 280 2775
8
9
2
40-50 N/cm
INSTALLED PARTS
CLEAN OFF GREASE PENCIL MARK

WARNING!! Rust Prevention Oils and other Petrol Based Anti Rust Treatments for Vehicles
may aect 3M´s Double Adhesive Tape and Polyurethane Adhesive performance!
WARNING!! Do not install Fender Flare or other Body Parts directly Over Wrapped
areas. Before installation of the parts , you must leave at least a 1/4” (6mm) perimetral
clearance “Free from Vinil” surrounding the part, before Part installation.
WARNING!! Do not install Fender Flare Over Vinil or Over Plastic Stripes on the Hood: 3M Adhesive
Tape and PUR Adhesive must always be in contact with the Sheet Metal of the vehicle.
PG.
INSTALLATION MANUAL
1
GM - SILVERADO 2014 +
www.airdesignusa.com
DATE: 30.05.2017
PART # : 1109NNTJGM24D09
SUPER-BOLT FENDER FLARES SET SILVERADO 2014+ SHORT & STANDARD BOX
We recommend 2 persons for installation
READ CAREFULLY BEFORE
INSTALLATION
DRIVE SLOWLY
25 mph max
DO NOT
WASH CAR
24 hrs

PG.
INSTALLATION MANUAL
2
GM - SILVERADO 2014 +
DATE: 30.05.2017 México 01 800 623 79 52 / USA 844 280 2775
HEX NICKEL SCREW
5/32” X 1 1/4”
ITEM DESCRIPTION
ASUPER BOLTS’ RUBBER STUDS 18 pcs
B
C
STAINLESS SUPER BOLT M6 X14
AMOUNT
40 pcs
D
E
GREASE PENCIL
1 pc
1 pc
AUTOMOTIVE ADHESION PROMOTER
TESA # 60153
APPLICATION SPONGE
STAINLESS LOCKNUT M6 20 pcs
PVC PROFILE
PUSH PIN WURTH 50
F
33 ft
G
H
PUSH PINS WURTH 46
I
J
U-CLIP
2 pcs
6 pcs
8 pcs
K
2 pcs
L
1 pc
6 pcs
RUBBER SPACER 1/4”
1 pc
ECO DOME
1 pc
M
N
THREADLOCKER 222
DRAWING
1 pc
SUPER BOLT PRESSING TOOL
O
CHECK LIST
TOOLS
*
*
*
*
*Already installed in the part
10 mm
¼”
1/4”
1/2”
T -10
7/32”

WASH WITH WATER, DETERGENT AND
SOFT CLOTH OR SPONGE
T -10
REMOVE MUD GUARDS
SECURE THE PART
REMOVE SCREWS
PG.
INSTALLATION MANUAL
3
GM - SILVERADO 2014 +
www.airdesignusa.com
DATE: 30.05.2017
FRONT RIGTH & LEFT FLARE
1/2”
1/4”
T -10
1/2”

UNSCREW & REMOVE
1/4” 1/2”
8
HASH MARKS
DRAW CENTER HASH MARK WITH
GREASE PENCIL AT CENTER, BOTH
SIDES, ON EACH SUPER BOLT AND
SHEET METAL. THIS WILL ENSURE
WHEEL FLARE WILL BE CENTERED TO
GREASE PENCIL OUTLINE.
T -10
MARK SILHOUETTE AND SUPER BOLTS POSITIONS
PG.
INSTALLATION MANUAL
4
GM - SILVERADO 2014 +
DATE: 30.05.2017 México 01 800 623 79 52 / USA 844 280 2775
FIRST CLEAN ALL OVER THE APPLICATION AREA WITH ACETONE

INNER VIEW
APPLICATION
AREA
9
WARM SURFACES WITH HEAT GUN IF SURFACE
TEMPERATURE IS TOO COLD.
SECURE THE PART
1/4”
T -10
1/2”
PG.
INSTALLATION MANUAL
5
GM - SILVERADO 2014 +
www.airdesignusa.com
DATE: 30.05.2017
ALIGN WHEEL FLARE TOP EDGE
WITH THE GREASE PENCIL HASH
MARKS AND PLACE.
We recommend 2 persons for installation

UNSCREW
1/4”
T -10
1/2”
APPLY PRESSURE ON EACH SUPER BOLT
REMOVE SUPER BOLTS (B)
ONLY THE ONES WITH RUBBER STUD
¼”
REMOVE
PG.
INSTALLATION MANUAL
6
GM - SILVERADO 2014 +
DATE: 30.05.2017 México 01 800 623 79 52 / USA 844 280 2775

SUPER BOLT INSTALLATION
PRESS SUPER BOLTS’ STUDS (A)
PRESSURE POINTS
A full surface contact between tape and substrate is decisive for good adhesion performance.
Contact is achieved by applying pressure. In practice a pressure between 40 and 50 N/cm² is usually needed and an
application temperature between 25 and 45 °C or 77 and 113 °F is also necessary.
During application, add-on parts and tapes must have the similar temperature.
40-50 N/cm
2
SUPER BOLT STUDS
ATTENTION
FOR GOOD ADHESION IT IS NECESSARY TO APPLY
AS MUCH PRESSURE AS POSSIBLE ALL OVER THE
EDGE AND CENTER OF THE SUPER BOLTS STUDS.
PG.
INSTALLATION MANUAL
7
GM - SILVERADO 2014 +
www.airdesignusa.com
DATE: 30.05.2017

REMOVE LINER
START END
VHB
TAPE
PVC TRIM
FENDER
FLARE
VEHICLE
FIXATION SYSTEM
INNER VIEW
PLACE
PLACE PVC TRIM
9
ATTENTION
APPLY LOCTITE THREADLOCKER TO SUPER BOLT’S THREAD
PG.
INSTALLATION MANUAL
8
GM - SILVERADO 2014 +
DATE: 30.05.2017 México 01 800 623 79 52 / USA 844 280 2775

HAND TIGHT
PLACE SUPER BOLTS
CLEAN OFF GREASE PENCIL MARK
1/4”
T -10
1/2”
SECURE THE PART
¼”
DRILL
PG.
INSTALLATION MANUAL
9
GM - SILVERADO 2014 +
www.airdesignusa.com
DATE: 30.05.2017
PLACE PUSH PINS
7/32”
Table of contents
Other Air Design Automobile Accessories manuals
Popular Automobile Accessories manuals by other brands

PUREGEAR
PUREGEAR AutoGrip user manual

Thule
Thule Parkway 956 instructions

Over Armour Offroad
Over Armour Offroad BC-3400-WD03 Instructions for Installation and Care

Gamber Johnson
Gamber Johnson TabCruzer user manual

InPOWER
InPOWER ITM126 quick start guide

Modifry Products
Modifry Products S2000 Windscreen Camera Mount quick start guide