SHIPPING BOX CONTAINS:
Water bottle with flexible neck attachment
Peri-Pro III Processor base with cover -
NNoottee::Grill Inlet Cover comes installed on the
Film Inlet Grill
Inside the processor:
Film transport
Chemistry tanks ((BBllaacckkddeevveellooppeerr
ttaannkk;;rreeddffiixxeerrttaannkk;;wwhhiitteewwaatteerrttaannkk))
Accessory boxes (3) containing:
##9900885500- 3 ea. Pedo (#0) Film Carrier
2 ea. Bite-wing Film (#3) Carrier
##9900882255- 3 ea. Anterior Film (#1) Carrier
1 ea. Occlusal Film (#4) Carrier
##9900884400- Film receptacle with 3 dividers
Literature kit: Manual, Warranty card
UNPACK
11..Remove the water bottle and flexible neck
attachment from the cardboard packing
found at one end of the box.
22..Place one hand on each side and underneath
the processor. Lift the processor out of the
carton and place it on a flat surface. Remove
the end caps and plastic bag.
33..Remove the processor cover and set aside.
44..Remove the accessory boxes and retain for
future use. Remove the top packing foam.
55..Pull the cardboard insert out of the dryer rack
and set aside; lift the transport out (the trans-
port cannot be removed until the cardboard
insert is removed first).
66..Remove the shipping foam from the back wall
of the processor.
77..Remove the foam cleaning pads from the
chemistry tanks and set aside.
88..Do not remove the clips holding the water
drain tube to the perimeter of the base.
99..Set the base on a flat, level, stable counter.
IImmppoorrttaanntt::TThheessuurrffaacceemmuussttbbeessttaabblleessootthhaatt
cchheemmiissttrryyddo
oeessnnoottssppllaasshhoorrssppiillll..
INSTALLATION
INSTALL PROCESSOR
11..FFiillllTTaannkkss
TThheettaannkkssccaannbbeeiinnssttaalllleeddiinnoorrrreemmoovveeddffrroommtthheebbaasseeoonnllyywwhheenntthheeffiillmmttrraannssppoorrttiissoouuttoofftthhee
pprro
occeessssoorr..IIffyyoouuiinnssttaalllleeddtthheettrraannssppoorrttaafftteerruunnppaacckkiinngg,,rreemmoovveeiittnnooww..
FFoolllloowwtthheettaannkkiinnssttaallllaattiioonn
aannddcchheemmiissttrryyffiilllliinnggsseeqquueenncceebbeelloowwttoopprreevveennttccoonnttaammiinnaattiioonnooff
cchheemmiissttrryydduueettooaacccciiddeennttaallssppiilllliin
nggoorrssppllaasshhiinngg..FFiixxeerriinntthheeddeevveellooppeerrttaannkkwwiillllccaauussee
ccoonnttaammiinnaattiioonn..
PPeerrii--PPrroocchheemmiissttrryysshhoouullddbbeea
attoorrbbeellooww7755°°FF..
Locate the thermistor arm above and to the left of the developer
(black) tank. Carefully lift the arm up, using the finger hole, until it
locks in place. See Fig. 3.
Remove all three tanks and rinse. Note: The wash tank requires
some effort to remove the drain stem with the O-Ring from the drain
receptacle.
Install the wash tank on the right side of the base, making sure the
drain stem with the O-ring seats in the drain receptacle by pushing
down until the tank’s feet rest on the floor of the base. Fill the Peri-
Pro III water bottle to the Fill Line (40 oz.) with room temperature
water (70° - 80°F). Attach the flexible neck to the bottle and flex into
position. Empty entire contents into the water tank.
Install the fixer tank next to the water tank, and fill with contents of the fixer bottle. Pour care-
fully to prevent splashing.
Install the developer tank on the left. Fill with the contents of the developer bottle. Lower the
thermistor arm into the tank.
If chemistry or water is accidentally spilled beneath the chemistry tanks, remove the tanks and
immediately dry the tanks, both sides of the heater plate and the depression in the base and
the area around the heater pad. Reverse the procedure to remove.
4
FIG. 3