
3
2
2-2
If necessary, tighten screws using a crosshead
screwdriver until the faucet is firmly connected to
the sink.
2-3
Place Mounting Nut, Metal Washer and Rubber
Washer over Valve Shank. From underside sink,
insert valve body through mounting holes. The hot
valve, labeled with red tag should be positioned to
the left sideof the spout.
From underneath sink, tighten Mounting Nut
by Tool . Before final tightening, make sure
Valve Body Side Co]nnector facing Spout
Body.
2-4 2-5
From underneath sink, tighten Mounting Nut
by Hand. Before final tightening, make sure
Valve Body Side Connector facing Spout
Body.
3
Connect hot andcold water flexiblehoses to faucetsinlets.
Connect Spout hot water flexible hoses to the Left
Valve Side Connector. Tighten flexible hoses Nut.
Connect Spout cold water supply line to the right
Valve Side Connector.
3. Water Supply Line Connections
4. POP-UPAssembly Installation
As shown. Insert Flange with Washer through Sink
drain Hole. From underside, thread Drain Body into
Flange. Holding the drain body in position with Ball
Rod Opening facing back, tighten Metal Locknut
securely.Thread Drain Tailpiece into Drainbody.
2-6
HOT
HOT
COLD
HOT COLD
COLD
INSTALLATION PROCEDURES
1 2-1
You should clean all the dirts from valve outlets.
Turning off the water supply valves. This is usually
found near the water meter. If you are replacing an
existing faucet, remove the faucet from the sink and
clean the sinksurface thoroughly.
1. Turn Off Water Supply 2. Install Faucet
Be sure that O-Ring is placed to the bottom of the
spout body. lnsert Spout Shank through the center
hole of sink. From underneath sink, place Plastic
Washer and Metal Washer onto spout shank and
tighten with Mounting Nut by hand.Before final
tightening, be sure Pop-up Holefacing back.
90 90
Close
Hot
Close
Cold
Open Open
5. Valve Function
By rotating the handle closed to the spout, the Valve
will be activated allowing water to flow. The water
flow will increase by continuing to rotate handle. By
rotating the right handle to the left, the water
temperature will decrease to cold flow only. By
rotating handle left to the right, the water
temperature will increaseto hot only.
6. Faucet Start Up
After installation is complete, remove
aerator and rotate handle to the close
position. Turnon the Water Supply Valves,
and check all connections for leak. Turn
on your faucetand allow bothhot and cold
water to run at least one minute each.
Replace Aerator.
MAINTENANCE AND CARE