Billyoh NS-0060 User manual

Covers All 10ft Gable Sizes
V3.3-220120
2) Reacquaint
yourself with the
parts, QTy’s and
Sizes on the
PACKING LIST.
PACKING
LIST
1) Take 5
minutes
and have
a coffee.
3) Read the
instructions
thoroughly and
then re-read if
necessary.
BEFORE
YOU
START
10ft GABLE:
Covered Sizes:
10x10, 12x10,
16x10, 20x10
CODE:
INS-0060
TONGUE & GROOVE
WINDOWED / WINDOWLESS
10ft Expert Reverse Apex Shed Building Instructions
Please read the instructions carefully
and please retain for future reference
Please note that all images are for illustration purposes only.
For Queries and Help please contact Product Support: 01909 768840
Pre - Treated
Pressure Treated
IMPORTANT SAFETY NOTICES
GARDEN BUILDINGS: These products are intended for domestic & outdoor use only. These products have been designed as an
affordable solution to most popular light domestic uses. WARNING: Playhouses are not suitable for children under 36 months
as they are not stable on their feet. Children are unaware of the dangers of play, therefore, It is important to supervise your
child at all times whilst playing in a playhouse.
Important Safety Tips
• This building should be constructed by at least two adults.
• Do not use this product if it has been modified or damaged.
• Allow adequate time to complete construction. If you hit any snags, take a break, keep calm, & seek additional help if needed.
• Ensure that there is adequate space around the construction site to enable access to all sides of the building during
construction.
• Do not attempt to construct the building in strong winds or poor weather conditions.
• Make sure that any ladders used during construction are in a good condition & that all tools are in good working order.
• The building is not completely stable until construction is complete & the roof of this building is not intended to support
significant weight. Do not climb on the roof.
• Keep bags, nails & fixings out of the reach of children.
• Please retain the instructions for future reference
Due to the nature of wooden panel products please watch out for the following minor blemishes:
• Protruding nails = hammer in the nails so that they are flush with the wood’s surface.
• Splintered wood and sharp edges = smooth down with sandpaper.
• Loose or dead knots = use a non-toxic wood glue to secure.
• Wear protective gloves & robust clothes during construction.
• Ensure that any paint or preservative that you use is non-toxic.
• Perform periodical checks throughout the life of the building to ensure that the original condition is maintained.
• Construct your building within a month of delivery to reduce the chances of the panels / boards warping.
• Some boards have a rough side and a smoother side. Ensure that these are placed appropriately, i.e. floorboards are smooth
side up, roof boards are smooth side down
AFTER MARKET MODIFICATION
• We do not recommend modifying this product. However, customers do enjoy modifying their buildings with their own
specific needs in mind as our products allow for a wide range of uses.
• If you modify this product for your own personal requirements you are doing so at your own risk.
• Customers who modify their buildings should ensure they do so safely & so that they do not affect the integrity of the
structure.
• If you are considering modifying this building be aware that any modifications invalidate your warranty & may affect
your consumer rights.
• We do not recommend fitting optional building parts, such as a base, from another manufacturer to ensure safety standards
MAINTENANCE
If there is any cause for concern or any other problems are found on or after delivery, such as damaged parts do not build, please
visit our Support Centre - billyoh.co.uk/help for further advice & resolution & stop all use before assembly until issues are
resolved. Ensure any replacement parts are fitted in accordance to the product instructions.
Important
• Throughout the life of the building please conduct checks to ensure the original condition is maintained.
• It is advised that the building is checked over prior to use each & every time.
• Please check the structural integrity of the building.
• Ensure the hinges of the door(s) are still in good working order regularly.
• Check the whole of the building for splintering. If this occurs please sand down the problem area & re-treat.
• Check that the fixings of the building are fit for purpose over the product’s life.
• Please ensure that any cracks that should appear in the product are not situated on any joints.
• Cleaning of the building on a regular basis is advised to increase longevity.
Playhouses
• Important: throughout the life of the playhouse please conduct checks to ensure the original condition is maintained. Failure
to carry out maintenance on this building could cause the product to be hazardous.
• Important: product must be checked at the start of each season minimum, ensuring it is safe to use. It is advised therefore
that the playhouse is checked over prior to use each & every time.
PRODUCT WARRANTY
• Products are built to the highest quality standards & should provide the intended purpose for years to come, this of
course being subject to reasonable use, care & transportation.
• If in doubt about the product’s limitations please read & understand all of the instructions & guidance notes. If
necessary please contact the retailer that the item was purchased from.
• Please visit our website for warranty & guarantee information.
• Please note, the warranty does not extend to damage caused post-delivery
• Treat your building annually with a quality timber treatment to comply with the buildings warranty.
GENERAL RECOMMENDATIONS
Thank you for purchasing this building. We hope you will be delighted with your new building for many years to come. These
instructions have been written as a guide to assembling this building & will provide you with an overview of the process of
constructing this building. There are a number of considerations to be thought of before constructing the building & how to
maintain your building upon completion. This section is also aimed at ensuring you are aware of considerations such as:
location for construction, treatment of the building & construction information.
Glazing: The glazing is generally sealed in plastic together. It may even be in between two of the panels. Remove protective film
from glazing before use. The glazing is safer to use than glass & is an economic solution for garden building use, but must be
installed correctly, carefully & safely. Glazing that is fitted to the outside of buildings is an uncomplicated method that does not
require beading. The glazing on all the garden buildings does not make the windows watertight & we suggest using a silicon
sealant to improve water resistance around the edges of the glazing.
Doors: Generally the doors are sent loose for all buildings. Some buildings such as summerhouses may have the doors already
fixed to the door frame. If your building is not built on a flat, level surface you may experience difficulties when fitting your
doors. The doors are not waterproof & you may find a gap between the doors or around the edges. This is not a fault as the
doors will move, shrink & expand during different weather conditions. Occasionally during transit the door frame can become
misaligned. This is easily solved by hanging the door on a level surface before the panels are attached.
Summerhouses: Some summerhouse doors are held together at the base of the frame with a screw or nail for transportation
purposes. Remove this screw or nail before commencing construction.
Building location & construction: Locate your building in a suitable & well prepared area, which is flat & protects the building as
much as possible from extreme weather conditions such as high moisture elements. It is very important that a solid & level
foundation is prepared to ensure the building will be level & square. This will help ensure that all parts fit correctly. The building
is not fully structurally sound until construction is complete. You may experience moments, such as when building the wall
panels, where you feel the building is not safe & may be flexing too much. This is perfectly natural so do not worry & take your
time as full rigidity for the building will only occur on completion of the construction process. We recommend that you
construct your building within 1 month of delivery as the timber may begin to warp. The building should be constructed leaving
a 2ft perimeter around the building.
Keep panels & your building away from extreme temperatures & away from trees, fences & other high moisture containing
elements to reduce & help prevent warping. This building is water resistant, but not water tight. Please wait for weather to
change before notifying us if you notice changes in the structure.
Playhouses: There are two holes in the rear gable for ventilation purposes.
Treatment: Treating the product when assembled is essential to ensure the building will not deteriorate. We recommend you
apply the finishing product to a small area to ensure it provides the intended result before proceeding. Always use an EN71
compliant treatment. Important notice: The natural moisture content of wood will change according to season. We recommend
applying a quality timber treatment to minimise the effects. Re-apply treatment annually to prolong the building’s life.
Wood Characteristics: Wood is a natural material, which means that no two boards on your building will be identical & will
expand & contract due to moisture levels. This natural effect of expansion & contraction is inevitable & is compensated for by
the tongue & groove construction in tongue & groove buildings. The timber in overlap buildings may warp & twist over time,
which is a natural process. The timber may crack naturally over time, but will not affect the structural integrity of the building
provided it has been assembled as advised.
Customer Service: If there are any queries regarding the building construction or aftercare please contact BillyOh and we will do
our utmost to ensure customer satisfaction.
Additional Safety Rules & Guidelines:
• No one should use the equipment until properly assembled.
• Read the instructions thoroughly a couple of times before attempting each section of the build.
• Make sure you have adequate space, a safe working environment & a flat level base to work on.
• Take your time, do not panic.
• Construct your building within one month of delivery to stop parts warping / bowing.
Additional Safety Rules & Guidelines Specific for Playhouses only:
• If your child suffers from any physical condition that could affect his/her ability to use the building it is highly recommended
that you consult a doctor before allowing them to use the equipment.
• Playhouses are designed for children between 3-10 years of age, with a maximum individual user weight of 50kg.
• Adults should not use playhouse equipment.
Slide & Ladder Options on Playhouses:
Important: The slide should be positioned to avoid full direct sunlight at the hottest part of the day to avoid overheating &
causing injury. The slide should not be installed over concrete, asphalt, slabs or any hard surface. If your product comes with a
ladder or slide it is extremely important to continually check the fixings of the slide & the ladder to the building as injuries may
occur if these parts become loose or detached.
For help & support, call 01909 768840
PRODUCT MAINTENANCE CHECKLIST
Wooden Sheds / Playhouses / Summerhouses
Level Base: A firm level base & protection from
moisture penetration is key to maintaining the building.
Seal The Windows: Use a silicone sealant on the inside
& outside of the windows as soon as possible after
assembly is a strong way of sealing the windows.
Annually Treat The Building: Treat your building after
construction with a good quality water resistant
treatment. Repeat this annually inside & out. (You do
not need to treat the building initially if you received a
pressure treated building)
The Building Must Not Be In Contact With Anything:
Overhanging hedges or trees must be cut back as a
branch may pierce roofing felt or glazing & would allow
water ingress.
Regularly Check / Replace Damaged Felt: Check the
felt regularly. Any damaged felt must be replaced.
Lubrication: Use a suitable oil to lubricate all moving
parts, such as hinges, for continued proper use.
CLADDING STYLE
Overlap: This style of
cladding is very traditional &
uses rough sawn timber. This
gives the panels their
unfinished look & helps the
building to blend in to its
natural surroundings. When
the wood has dried through
hotter weather knots may
become loose, which is
natural. Overlap is an
economic solution for lower
impact use.
Tongue & Groove: This style
of cladding allows the timber
to interlock giving greater
strength to the building. It
also creates a smoother finish
& continuous lines throughout
the panel. Due to the natural
movement of wood the lines
between tongue & groove
panels may not marry up.
PANEL ORIENTATION
It is essential to ensure that the panels
of your building are in the correct
orientation. Assembly in the wrong
orientation may lead to water ingress &
deterioration.
Boards overhang the edge of the floor:
In most cases the lower edge of the
panels overhangs the floor of the
building & the panel is fixed to floor with
screws through the frame on the inside
of the panel.
External Depth
External Width
External Eaves Height
External Ridge Height
BASE DIMENSIONS
Use the dimensions that are on
the technical details
documentation for your specific
building to workout the required
dimensions when laying your
solid base.
Do not forget about the roof
overhang when choosing your
building location. Keep in mind
where the roof will finish & how
you will maintain the building.
FOOTPRINT OF BUILDING
BUILDING DIMENSION TERMINOLOGY
TROUBLESHOOTING GUIDE
Pre-Assembly:
Q: What type of base should I use? A: You must lay a solid flat & level base. Failure to do so will result in
your building fitting together incorrectly. We highly recommend a properly laid & flat & level concrete or
flagstone base (see Building a Base section of this instruction document).
Q: I have glazing / fixing kit missing. What should I do? A: Firstly check that all of your building’s parts are
there by laying them all out on the ground. Check between the panels / larger parts as the glazing comes
banded together & is placed between the panels, along with the fixing kit, for safer transportation. If they
are still not found please visit our Support Centre - billyoh.co.uk/help
Q: Are tower playhouses freestanding? A: We recommend that tower playhouses are positioned on a flat /
level base raising the legs away from ground moisture. Please read the Protecting Playhouse Tower Legs
section of this document for more details.
Q: Are my window & plain panels interchangeable? A: On apex buildings the window & plain panels are
interchangeable where they are the same size or make up the same size panel as the opposing wall with
more than one part. Some pent building may also allow for panels to be interchangeable but ensure they
are the same size before securing.
During Assembly:
Q: How are the windows fixed to the building? A: This process depends on the individual building. Please
read the instructions to find out which method your particular building uses.
Q: Which way do the joists run? A: This process depends on the individual building. Please read the
instructions to find out which way the joists run.
Q: My building seems a little flimsy? A: Your building won’t reach full rigidity until fully assembled so do
not panic.
Q: Construction seems tricky? A: Take your time & read the instructions thoroughly. These buildings
should be constructed by two people. If in doubt seek professional help.
Q: The felt seems a little tight? A: To reduce waste, to help protect the environment & reduce costs for our
customers we only supply the required amount of felt for roofing material.
Q: My building isn’t going together properly, it is twisted. A: It sounds like you are building on an uneven
surface. You must build on a flat / level base for your building to fit together correctly.
Post-Assembly:
Q: Why is there a gap around the doors? A: During the year the wood of your building will shrink & expand,
which will create a gap around you building’s doors. This is natural.
Q: Why is there a gap around my playhouse door? A: This gap is to stop finger trapping & is an EN-71
testing requirement.
Q: Why does my playhouse have holes in the back panel? A: These holes are for ventilation & is an EN-71
testing requirement.
Q: My building is not water tight around the windows. A: These products have been designed as an
affordable solution to most popular light domestic uses & we do not state that they are watertight. Use
silicon sealant around the windows to improve the water resistant qualities of the building.
Q: My building has developed a leak A: Use silicon sealant to stop the leak & make sure that your building
is not in a damp area & if necessary move it & replace the damaged boards.
BUILDING A BASE
When thinking about where the building
& base are going to be constructed
ensure that there will be access to all
sides for maintenance work & annual
treatment. This building should be
situated at least 2 feet away from
any structures or obstructions (such
as fences, buildings, trees, laundry
lines, electrical wires etc). We
recommend that areas around playhouses
have a soft surface such as play bark or grass.
All garden buildings must be built on a level, flat base
to be erected correctly
PLAYHOUSES:
PROTECTING
PLAYHOUSE TOWER
LEGS
We strongly recommend that
the legs of all of the platforms in
the tower range of playhouses
should be kept off of grass & soil &
out of moisture.
The minimum protection needed is to
be treated annually with a water
repellent treatment.
Placing the tower legs on a
solid base, preferably concrete or
flagstones, will help prevent water
penetration.
For Queries and Help please call Product Support: 01909 768840
*OD]LQJVWULSVDQGȴ[LQJVIRXQGLQSDFNVΖIQHFHVVDU\
IWDQGIW([WHQVLRQ.LWFRQWDLQVDGGL
WLRQDOVWULSVIUDPLQJDQGȴ[LQJNLW
[%XLOGLQJ:RRGNLWVFRQWDLQV
DOOVWULSVIUDPLQJȴ[LQJVDQGΖQVWUXFWLRQ
IRUWKHEXLOGLQJVL]H
7UXVVSDFNFRQWDLQVUDIWHUVDQGFROODUWLHVΖIQHFHVVDU\
:KHUHWRȴQGHYHU\WKLQJ
+$1'<7Ζ36RUWȴ[LQJVDQGZRRGNLWE\VL]HDQGSLHFH
EHIRUHVWDUWLQJȋ$OOSDFNOLVWIRXQGDWWKHHQGRIGRFXPHQWȋ
/D\ȵRRUVHFWLRQVZLWK
-RLVWVIDFLQJXSZDUGV
Floor Stages (SS & TG)
Back
Side
66ȵRRULVVDPHOD\RXW S50 x 8
Use a suitable drill bit for pilot hole
- 3mm is recommended for most.
3mm or 4mm
Avoid splitting wood by pre-
drilling pilot holes for all screws
This is needed for all screw codes:
S12, S30, S40, S50, S70 and S100
IMPORTANT: Pre pilot drill
all screw holes
Pilot Drilling
Building Size Floor Sections Roof Sections
10 x 10
12 x 10
16 x 10
20 x 10
6 6
6 6
8 8
10 10
Please note on the number of Floor and Roof
sections according to your building size.
Floor / Roof Details
Recommend
x2 for speed
1 2 3 4
85
9
6 7
Approximate building time is
6 to 10 Hours assembly
based on experience and size.
1. Cordless drill
2. Phillips bit
and drill bits
3. Hammer
4. Measuring Tape
5. Pencil
6.Utility Knife
7. Woodsaw
8. Step ladder
9. Spirit level
What you need
1
45 6
2 3
For Queries and Help please call Product Support: 01909 768840
Side
Back
2QO\ȵLSRYHUDPD[LPXP
RIMRLQHGȵRRUVDWRQFH
WRUHGXFHZHLJKW
/D\WKHSDQHODQGȴ[
top and bottom rails
Plain Panel Fixing Stages
Repeat for all
Plane panels
S50 x 6 (FR-0823-SQ / FR-1116-SQ x 2)
823mm or 1116mm
Back
Side
S50 100mm
FR-0100-SQ
2QO\MRLQDPD[RIȵRRUV
WRJHWKHUEHIRUHWXUQLQJ
Lay gable panel, Fix
bottom rails. Repeat
for all Gable Panels
Gable Panel Stages
S50 x 3 (FR-0823-SQ x 1)
823 mm
Wall Panel Stages
Back
Side
7Ζ3'RQȇWȴ[SDQHOVWRȵRRUXQWLOURRILVLQSODFH
Place 3ft or 4ft
Panel along the
HGJHRIWKHȵRRU
It should line up
with edges of
WKHȵRRU
/D\WKHSDQHODQGȴ[
top and bottom rails
Windowed Panel Fixing Stages
Repeat for all
Windowed panels
S50 x 5 (FR-0823-SQ / FR-1116-SQ x 2)
823mm or 1116mm
7
10 11 12
8 9
For Queries and Help please call Product Support: 01909 768840
S50 x 4
Pilot drill holes
EHIRUHȴ[LQJ
Plain Gable Section (PG)
Plain
Panel
(PP)
Back
Side
Top View Diagram Central Gable Fixing Stages
Fix one of the Central
Gables to the top of
a 4ft Plain Panel.
4ft Plain Panel
S50 x 4
S50 x 6
Pilot drill holes
EHIRUHȴ[LQJ
S50 x 6
Pilot drill holes
EHIRUHȴ[LQJ
S50
Add the remaining Eave Panels
according to building size. (Image
below shows 12x8 building)
Pilot drill holes
EHIRUHȴ[LQJ
13
16 17 18
14 15
For Queries and Help please call Product Support: 01909 768840
“Fitted on both
sides”
Fix truss pieces 1 side,
following the screw pattern.
S50 x 24
(TR-2250-BV2 x 2) (TR-1632
-BM75 x 2)
(TR-0491-BV2 x 2)
Flip truss over and repeat
/D\DQGȴ[WKH6LGH
*DEOH3DQHO7RS*DEOH
&HQWUDOIW3ODLQ
3DQHO
S50 x 18
Truss Fixing Stage
Use the Door Gable
Sections to align the
Truss sections
S50 x 4
Front
Front Side
Windowed Panel
Place the Plain Gable Section
on the inside of the Back Panels
19
22 23 24
20 21
For Queries and Help please call Product Support: 01909 768840
S50 x 4
Front
S50 x 4
Fix the Door Valance
between the Panels
Front
Front Side
Windowless Panel
The distance 879mm
or 1172mm is the
width of a Roof Sheet.
Measure from the
framing to the
centre of the Truss
Truss Position Diagram
Side View
879mm or 1172mm
Heavy Duty
only, Halfway
point.
19mm
Truss
S50 x 6
(FR-0879-SQ / FR-1172-SQ)
879mm or 1172mm
S50 x 4
The Truss must be positioned where the Roof
Sheets will meet. This will be either 879mm
or 1172mm. Please see the diagram.
25
28 29 30
26 27
For Queries and Help please call Product Support: 01909 768840
N30 x 5
x 1
1172mm or
879mm
Repeat for all
roof sheets
Roof Fixing Stage
1172mm or
879mm
(FR-0879-SQ /
FR-1172-SQ)
Side View
Correct Position Side View
Incorrect Position
Roof Sheet Position
Line up the Roof Sheet with
the framing not the cladding
2
2
1
S50 x 12
(FR-1631
-BV2)
1631mm
Roof Sheet requires
Roof Support only
7KH5RRI6KHHWVKRXOGȴWKDOI
ZD\DFURVVWKH5RRI7UXVV
N30 x 15
Position the
Roof Sheet
square with
ȴUVWVKHHW
and push up
to the centre
N30 x 15
Position the Roof Sheet
square with the framing
31
34 35 36
32 33
For Queries and Help please call Product Support: 01909 768840
N30 x 15
Push the Roof Sheet
up to the centre.
This will require 2
people and make
the building ridgid N30 x 15
N30 x 15
Lay T&G roof ,Fix
bottom rails.
Repeat for all T&G
roof sections.
T&G Roof Only
S50 x 3 (FR-0879-SQ / FR-1172-SQ x1)
823mm or 1116mm
Side View
Correct Position Side View
Incorrect Position
T&G Roof Position
Line up the T&G Roof with
the framing not the cladding
N30 x 15
Push the Roof Sheet
up to the centre.
This will require 2
people and make
the building ridgid SKIP TO STAGE 50
37
40 41 42
38 39
For Queries and Help please call Product Support: 01909 768840
The T&G 5RRIVKRXOGȴWKDOI
ZD\DFURVVWKH5RRI7UXVV
S70 x 10
Position the
Roof Sheet
square with
ȴUVWVKHHW
and push up
to the centre
S70 x 10
Position the Roof Sheet
square with the framing
S70 x 10
Push the Roof Sheet
up to the centre.
This will require 2
people and make
the building ridgid S70 x 10
S70 x 10
43
46 47 48
44 45
For Queries and Help please call Product Support: 01909 768840
Line up the Door Threshold
to the front of the Floor
S50 x 3 (FR-1172-SQ x 1)
1172mm
Line up framing to
outside of cladding
S50 x 8
(FR -1651
-SQ x 2)
1651mm
S70 x 10
Push the Roof Sheet
up to the centre.
This will require 2
people and make
the building ridgid
S50
Screw the Wall
Panels to the
ȵRRU
Hinges ȴ[
to the
Framing.
Back View of Doors
Door Fixing Stage
Line up the Top Door Threshold
to the back of the Gable framing
S30 x 3 (CL-1116-28RS x 1)
1116mm
49
52 53 54
50 51
For Queries and Help please call Product Support: 01909 768840
2mm
Gap
4mm
Gap
S30 x 18
(CL-1754-40RS)
S30 x 4
1700mm
This will
require
cutting
to size
S30 x 24
x 6
Windowed Fixing Stage
WS x 1 GL x 1 S30 x 3
(CL-0532-SQ x 1)
532mm
Windowed Building Only
Do not screw
through the
glazing
S30 x 2
S25 x 2
x 2
x 1
100mm
Top
Bottom
55
58 59 60
56 57
For Queries and Help please call Product Support: 01909 768840
S30 x 18
(CL-0532-SQ x 6) x 4
532mm
Windowed Building Only
Cut to size (Windowed Building Only)
16x10-Expert windowed reverse apex
building shown
S50 x 16
Cloaking Strip Fixing
Repeat Stage
on the other
side Panel
Section
Cut to size
(CL-1754-40RS)
1754mm This will require
cutting to size
Do not screw
through the
glazing
S30 x 6
(CL-0532-SQ x 2)
GL x 1
532mm
WS x 1
Windowed Building Only
Cloaking Strip Fixing Stage
(Windowless Building Only)
16x10 Expert reverse apex building shown
N30 (CL-1754-40RS)
1754mm N30 (CL-1754-40RS)
1754mm
Cloaking Strip Fixing Stage
Cut to size
16x10-Expert reverse apex building shown
N30
(Windowed Building Only)
(CL-1754-40RS)
1754mm
This will
require
cutting
to size
61
64 65 66
62 63
For Queries and Help please call Product Support: 01909 768840
Tack to hold
in place
70mm overhang at
each end
Fold over
Eaves
T10
Mineral Felt
Sand Felt T8 T10
Fold over
Corner
100mm
Felt Fixing Stage
Length of
roof + 140mm
x 4
Front View
(10ft Gables)
(4 PIECES OF FELT)
Felt
Felt
Felt
Felt
STAGE 1
STAGE 3 STAGE 4
STAGE 2
LENGTH
100mm
T10 T10
Repeat previous stages
for this side
T10
Repeat previous stages
for this side
67
70 71 72
68 69
For Queries and Help please call Product Support: 01909 768840
100mm
For Shingles Roof Covering Only
T13
Use the shingles Instructions
that comes with the packs
For Shingles Roof Covering Only
For Shingles Roof Covering Only
Only 1 roll of felt is used
as a starter layer for the
Shingles
Cut the full roll of felt in half
lenght ways
x 1
N30 (CL-1754-40RS)
1754mm
This will
require
cutting to size
Cut to size
Cut to size
N30 x 16
(FB-1742-90RS x 4)
1742mm
Facia Fixing Stage
N30 x 4
x 2
3LORWGULOOKROHVȴUVW
73
76 77 78
74 75
For Queries and Help please call Product Support: 01909 768840
Treat after assembly and
annually to protect
Protect your building
12x10 Expert T&G Windowless Shown
Same for 10x10 & 20x10 Building
Treat after assembly and
annually to protect
Protect your building
12x10 Expert T&G Windowed Shown
Same for 10x10 & 16x10 Building
Treat after assembly and
annually to protect
Protect your building
16x10 Expert T&G Windowless Shown
Treat after assembly and
annually to protect
Protect your building
20x10 Expert T&G Windowed Shown
79
82
80 81
Name:
Woodkit Building Reverse Apex 4ftx10ft Plain U1754
PACKED PART
ID:
25672
Pack List
GROUP PART ID Description / Image Part Code Length Z (m) X1 X2 QTY
Tick when
Packed
Door Head
Strip -
11mm x 28mm Strip - Rough Sawn
CL-1116-28RS 1.116 - - 1
Cloak Panels /
Door -
11mm x 40mm Cloak Strip - Rough Sawn
CL-1754-40RS 1.754 - - 17
Finial -
11mm x 90mm Finial Diamond
FB-0138-90RS 0.138 - - 2
Fascia -
11mm x 90mm Fascia Board - Rough Sawn - Bevelled x1
FB-1742-90RS 1.742 66 - 4
Door Block /
Floor Block -
28mm x 28mm Framing Rough Sawn - Homegrown
FR-0100-SQ 0.100 - - 4
Top & Bottom
Rails -
28mm x 28mm Framing Rough Sawn - Homegrown
FR-0823-SQ 0.823 - - 4
Door Bracing -
28mm x 28mm Framing Rough Sawn - Homegrown
FR-0900-BV2A 0.900 58 58 4
Top & Bottom
rails -
28mm x 28mm Framing Rough Sawn - Homegrown
FR-1116-SQ 1.116 - - 6
Barge Boards /
Purlin / Door
Threshold
-
28mm x 28mm Framing Rough Sawn - Homegrown
FR-1172-SQ 1.172 - - 4
Door Uprights -
28mm x 28mm Framing Rough Sawn - Homegrown
FR-1651-SQ 1.651 - - 2
Instructions -
10ft Expert Apex Shed Instructions
INS-0060 -- - 1
Fixing Kit 25639
Fixing Kit Building Reverse Apex 4ftx10ft U1754
FK-4x10-A-PL-
U1754 -- - 1
FINAL PART CHECKING: TO BE FILLED IN BY THE FINAL PACKER OR CHECKER:
I, __________________________, have checked that all components have been packed in good quality on ____/____/__________
Kybotech, Claylands Avenue, Worksop S81 7BQ
V1.0 050117
Name: Woodkit Pressure Treated Building Reverse Apex 4ftx10ft Plain U1754
PACKED PART
ID:
29037
Pack List
GROUP PART ID Description / Image Part Code Length Z (m) X1 X2 QTY
Tick when
Packed
Door Head
Strip 29014
PT Component Woodkit: CL-1116-28RS - 11mm x 28mm Strip - Rough Sawn
CL-1116-28RS-(PT) 1.116 - - 1
Cloak Panels /
Door 29015
PT Component Woodkit: CL-1754-40RS - 11mm x 40mm Cloak Strip - Rough Sawn
CL-1754-40RS-(PT) 1.754 - - 17
Finial 29016
PT Component Woodkit: FB-0138-90RS - 11mm x 90mm Finial Diamond
FB-0138-90RS-(PT) 0.138 - - 2
Fascia 29018
PT Component Woodkit: FB-1742-90RS - 11mm x 90mm Fascia Board - Rough Sawn - Bevelled x1
FB-1742-90RS-(PT) 1.742 66° - 4
Door Block /
Floor Block 29019
PT Component Woodkit: FR-0100-SQ - 28mm x 28mm Framing Rough Sawn - Homegrown
FR-0100-SQ-(PT) 0.100 - - 4
Top & Bottom
Rails 29021
PT Component Woodkit: FR-0823-SQ - 28mm x 28mm Framing Rough Sawn - Homegrown
FR-0823-SQ-(PT) 0.823 - - 4
Door Bracing 29023
PT Component Woodkit: FR-0900-BV2A - 28mm x 28mm Framing Rough Sawn - Homegrown
FR-0900-BV2A-(PT) 0.900 58° 58° 4
Top & Bottom
rails 29024
PT Component Woodkit: FR-1116-SQ - 28mm x 28mm Framing Rough Sawn - Homegrown
FR-1116-SQ-(PT) 1.116 - - 6
Barge Boards /
Purlin / Door
Threshold
29025
PT Component Woodkit: FR-1172-SQ - 28mm x 28mm Framing Rough Sawn - Homegrown
FR-1172-SQ-(PT) 1.172 - - 4
Door Uprights 29029
PT Component Woodkit: FR-1651-SQ - 28mm x 28mm Framing Rough Sawn - Homegrown
FR-1651-SQ-(PT) 1.651 - - 2
Instructions -
10ft Expert Reverse Apex Shed Instructions
INS-0060 -- - 1
Fixing Kit 25639
Fixing Kit Building Apex 4ftx10ft U1754
FK-4x10-A-PL-U1754 -- - 1
FINAL PART CHECKING: TO BE FILLED IN BY THE FINAL PACKER OR CHECKER:
I, __________________________, have checked that all components have been packed in good quality on ____/____/__________
Kybotech, Claylands Avenue, Worksop S81 7BQ
V1.0 170118
Name:
PACKED PART
ID:
GROUP
PART ID Description / Image Part Code Length Z (m) QTY
Tick when
Packed
Cloak -
11mm x 40mm Cloak Strip - Rough Sawn
CL-1754-40RS 1.754 2
Floor Joining
Block
-
28mm x 28mm Framing Rough Sawn - Homegrown
FR-0100-SQ 0.100 2
Top & Bottom
rails
-
28mm x 28mm Framing Rough Sawn - Homegrown
FR-1116-SQ 1.116 4
Barge Boards
& Purlin
-
28mm x 28mm Framing Rough Sawn - Homegrown
FR-1172-SQ 1.172 3
Fixing Kit 25561
Fixing Kit Extension Apex 3ft and 4ft Plain
FK-3ft-4ft-A-
PL
-1
Woodkit Extension Apex 4ft Plain U1754
25637
Pack List
FINAL PART CHECKING: TO BE FILLED IN BY THE FINAL PACKER OR CHECKER:
I, __________________________, have checked that all components have been packed in good quality on ____/____/__________
Kybotech, Claylands Avenue, Worksop S81 7BQ
V1.1 050117

Other Billyoh Garden House manuals

Billyoh Mia 19351 User manual

Billyoh

Billyoh Mia 19351 User manual

Billyoh APEX Instruction manual

Billyoh

Billyoh APEX Instruction manual

Billyoh INS-0054 Instruction Manual

Billyoh

Billyoh INS-0054 Instruction Manual

Billyoh INS-0001 User manual

Billyoh

Billyoh INS-0001 User manual

Billyoh INS-0042 Instruction Manual

Billyoh

Billyoh INS-0042 Instruction Manual

Billyoh INS-0044 Instruction Manual

Billyoh

Billyoh INS-0044 Instruction Manual

Billyoh INS-0005 User manual

Billyoh

Billyoh INS-0005 User manual

Billyoh 6000 Series Instruction Manual

Billyoh

Billyoh 6000 Series Instruction Manual

Billyoh INS-0051 User manual

Billyoh

Billyoh INS-0051 User manual

Billyoh Lollipop Max Playhouse Instruction Manual

Billyoh

Billyoh Lollipop Max Playhouse Instruction Manual

Billyoh Budget Apex INS-0047 Instruction Manual

Billyoh

Billyoh Budget Apex INS-0047 Instruction Manual

Billyoh Darcy User manual

Billyoh

Billyoh Darcy User manual

Popular Garden House manuals by other brands

Project Timber Corner Shed Windowless Building instructions

Project Timber

Project Timber Corner Shed Windowless Building instructions

Palmako PM44-7937 installation manual

Palmako

Palmako PM44-7937 installation manual

Keter 17201311 user manual

Keter

Keter 17201311 user manual

Palmako FR28-3532 installation manual

Palmako

Palmako FR28-3532 installation manual

Palmako FR44-4040 installation manual

Palmako

Palmako FR44-4040 installation manual

Palmako FR44-4435 installation manual

Palmako

Palmako FR44-4435 installation manual

Soulet 793993 Assembly instructions

Soulet

Soulet 793993 Assembly instructions

Mercia Garden Products 8x8 Helios Summerhouse General instructions

Mercia Garden Products

Mercia Garden Products 8x8 Helios Summerhouse General instructions

Mercia Garden Products 01PTOSBA0705SDFW-V1 General instructions

Mercia Garden Products

Mercia Garden Products 01PTOSBA0705SDFW-V1 General instructions

Interline Rauma 3 Building instructions

Interline

Interline Rauma 3 Building instructions

Palmako Sandy 3.0 installation manual

Palmako

Palmako Sandy 3.0 installation manual

Palmako FR40-4545 installation manual

Palmako

Palmako FR40-4545 installation manual

Lemeks Palmako Roger FRE44-3857 manual

Lemeks

Lemeks Palmako Roger FRE44-3857 manual

Palmako Lara FR28-5925 installation manual

Palmako

Palmako Lara FR28-5925 installation manual

Valkea OREGON 1 installation manual

Valkea

Valkea OREGON 1 installation manual

konsta 92063 Building instructions

konsta

konsta 92063 Building instructions

Tiger Lana General assembly instructions

Tiger

Tiger Lana General assembly instructions

Project Timber 20x6 Hobbyist Windowed Pent Shed Building instructions

Project Timber

Project Timber 20x6 Hobbyist Windowed Pent Shed Building instructions