BlueSky Mast AL2 STANDARD Series User manual

Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2015 BlueSky Mast, Inc. All Rights Reserved
AL2 Lift Series
Quick Reference Sheet - Primary and Secondary Guying
DEPLOYMENT
[email protected] Read Manual Before Use
Refer to detailed instructions in the
AL2 Lift Series Manual at all times
Start at the center of the tripod and unwind the guy rope while walking
away from the mast. Take one NORMAL step for each meter of height
of the mast. 15M = 15 Steps. One person should deploy all 4 guy ropes.
Add the red primary guy ring
and pin it to the bottom hole on
the mounting pole.
Attach and secure your devices
to the mast. Use velcro straps
to secure any cables.
Stop - unwind the guy rope, drive
a stake into the ground at an
angle and attach the guy rope.
Add the mounting pole (1/2 the
size of a mast pole) to the top of
the mast pole.
Slide the blue secondary guy
ring onto the mounting pole.
DO NOT lock it at this time.
Secure the tripod by driving
stakes through the two holes on
each of the 3 tripod base plates.
Release the cam lock on the
bottom of the tripod.
Insert first mast pole leaving at
least 4 Inches above the tripod
and lock the cam lock.
Unfold the tripod legs and make
sure the cross bars are locked
into position.
Loosen turn knobs on each
the tripod legs and allow them
to fully extend.
Make sure the base plates are
flat on the ground and tighten
the turn knobs.
Level the tripod by using the
three bubbles levels and adjust-
ing the tripod legs.
Stand the tripod up with the
base plates on the ground and
release the Velcro Strap.
1234
5
689
710
14
13
12
11
18
16
15 17
Slide the handle towards the mast approx. 7 feet. This will take up the
slack in the guy rope during deployment and prepare you for incremental
guying. Repeat this process until all 4 guy ropes are 90 degrees apart.
Attach the 1st primary guy rope
to the round hole on the red
primary guy ring.
Attach the winch handle. Pay
out the cable by turning the
winch handle counter clockwise
01/17
The cable should hang freely on
the left side of the winch and
should not hang over anything.
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2015 BlueSky Mast, Inc. All Rights Reserved
AL2 Lift Series
Quick Reference Sheet - Primary and Secondary Guying
DEPLOYMENT
[email protected] Read Manual Before Use
Refer to detailed instructions in the
AL2 Lift Series Manual at all times
21
20
Raise the mast by turning the
winch handle clockwise until 4
inches show under the tripod.
Slowly release the cam lock and
allow the first mast pole to rest
on the lift base plate.
Lock the cam lock and lower the
lift base plate to the ground.
Insert another mast pole.
Pay out enough cable to go
through the pulleys and back up
to the ball stop holder.
Locate the lift base plate and
set it on the ground below the
mast pole in the tripod.
Locate the ball stop holder on
the bottom of the tripod
opposite the winch.
22
26
Lock the cam lock and lower the
lift base plate to the ground.
Insert another mast pole.
WARNING: If at any point the
mast begins to slip while the
cam lock is locked - STOP
Use the 7/16 wrench and tight-
en the cam lock a quarter turn
until slipping no longer occurs.
Repeat steps 25 - 28 until you
have reached 1/2 the total mast
Height.
STOP at 1/2 the total mast
height and lock the cam lock on
the blue secondary guy ring.
Attach the blue clip of the 1st secondary guy rope to the round hole on the
secondary guy ring and walk away from the mast while unwinding all of
the guy rope. Place it on the ground between the 2 primary guy ropes.
DO NOT stake the secondary
guy rope at this time.
Repeat this process until all secondary guy ropes have been deployed
at a 45 degree angle from the primary guy ropes. DO NOT Stake the
secondary guy ropes. They will be staked at the end of deployment.
24
23
27 28
29
36
35
30 32 33
34
19
Pull the pin and guide the ball
stop into place. Release the pin
to secure the ball stop.
Crank the lift base plate up until
it nest into the bottom of the
mast pole and the cable is taut.
Raise the mast pole until the
castle cuts on both mast poles
nest together.
Slowly release the cam lock and
raise the mast pole until 4
inches show below the tripod.
31
25
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2015 BlueSky Mast, Inc. All Rights Reserved
AL2 Lift Series
Quick Reference Sheet - Primary and Secondary Guying
DEPLOYMENT
[email protected] Read Manual Before Use
Refer to detailed instructions in the
AL2 Lift Series Manual at all times
39
Confirm that the cable is taut
and the cam lock is locked.
Incremental Guying: Loosen the guy ropes based on the length of the pole below the cam lock. See examples
above. If the length of the pole under the cam lock is 1 foot - slide the handle back 1 foot on each of the 4
primary guy ropes. This will allow you enough room to raise the mast and prepare to deploy the next pole.
Confirm the mast is straight and
the primary guy ropes are taut.
40
37
Raise the mast until 4 inches is
showing below the cam lock
and LOCK THE CAM LOCK.
Make sure all 4 primary guy
ropes are taut and the mast is
straight.
Lower the lift base plate, insert
a mast pole and raise it until the
poles nest together.
One at a time, slowly loosen the primary guy ropes by holding the guy
rope in front of the handle and sliding the handle back approx. 4 ft.
Doing this will give you enough slack to add another mast pole.
NOTE: The mast will lean, but
will straighten up as you raise
the next mast pole.
When the primary guy ropes go taut or if the mast begins to lean exces-
sively - Stop and Lock the Cam Lock. Now adjust all 4 PRIMARY GUY
ROPES and make sure the mast is straight and perpendicular.
Adjusting the Primary Guy Ropes
Hold the rope in front of the guy handle and slide the handle back to
loosen or forward to tighten.
Raise the mast until the primary
guy ropes go taut. Incremental
guying may be required.
Release the cam lock and raise
the mast until the 4 primary guy
ropes go taut.
Lower the last pole to the
ground and lock the cam lock.
Adjust the 4 primary guy ropes
and make sure the mast is
straight and perpendicular.
Repeat this process until you
have deployed all mast poles.
38
41
42
43
44 45
46
47
48 49
50
51
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2015 BlueSky Mast, Inc. All Rights Reserved
AL2 Lift Series
Quick Reference Sheet - Primary and Secondary Guying
DEPLOYMENT
[email protected] Read Manual Before Use
Refer to detailed instructions in the
AL2 Lift Series Manual at all times
Drive two tripod stakes through two of the holes in the lift base plate.
Person #2 should go to the guy rope that is 90 degrees from person #1.
This will allow you to see how far each guy rope needs to be adjusted to
get the mast straight. Rotate to the other guy ropes to finish adjustment.
It may take a couple rotations to
get the mast straight and per-
pendicular.
Adjust the 4 Primary Guy Ropes
2 ppl.
If the mast is leaning, Person #1
should go to the guy rope oppo-
site the way the mast is leaning.
Lock the primary guy ropes by pulling a small amount of slack in. Use
your finger and loop the guy rope over the front lip of the guy handle.
Pull the guy handle towards the mast to remove any slack in the rope.
1
21
52 53 75 55
56
57 58
21
Confirm all 4 secondary guy ropes are at a 45 degree angle between the
primary guy ropes. Pull each of the secondary guy ropes out to it’s fullest
distance, drive a stake into the ground and clip the guy rope to the stake.
60
Adjust, lock and secure the secondary guy ropes. Pull a small amount of slack in the rope and wrap it over the
rope lock on the front of the guy handle. Repeat this process until all 4 primary guy ropes have been adjusted
and locked.
Secure the 4 secondary guy
ropes at this time.
OPTIONAL: Secure the winch and winch cable by removing the ball stop from the ball stop holder. Wind the free
cable onto the winch and secure the ball stop on the winch. Remove the handle and place it back into the wheeling
carry bag or hard case.
54
59
61
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2015 BlueSky Mast, Inc. All Rights Reserved
[email protected] Read Manual Before Use
Refer to detailed instructions in the
AL2 Lift Series Manual at all times
AL2 Lift Series
Quick Reference Sheet - Primary and Secondary Guying
LOWERING / RECOVERY
Raise the mast up enough to
remove the 1st mast pole .
Lock the cam lock and lower
the lift base plate and remove
the 1st mast pole.
Raise the lift base plate until it
nests firmly into the next mast
pole.
Release the cam lock and
SLOWLY lower the mast to the
ground. Remove the mast pole.
Raise the lift base plate until it
nests firmly into the next mast
pole.
12
3
4
5
6
9
8
7
Unlock the ALL guy ropes and
slide the guy handles toward
the guy stakes 12 inches.
Release the cam lock.
Remove the stakes from the Lift
Base Plate by using the stake
remover.
Adjust all 4 PRIMARY Guy Ropes so the mast is straight and perpen-
dicular. You should only have to adjust the primary guy ropes for the
first 3 - 4 center mast poles, unless you are experiencing high winds.
Repeat this process until the
blue secondary guy ring is
within reach.
WARNING: If at any point the
mast begins to slip while the
cam lock is locked - STOP
Use the 7/16 wrench provided
with the system to make adjust-
ments to the cam lock.
Tighten the nut on the cam lock
a quarter turn until slipping no
longer occurs.
Remove the 4 secondary guy
ropes and release the cam lock
on the secondary guy ring.
Continue lowering the mast until
the primary guy ring is within
reach.
Remove the 4 primary guy
ropes and unpin the primary
guy ring.
Pull the slack in from all primary
and secondary guy ropes, wind
them up and stow them.
Remove and stow all guy
stakes.
Remove and stow the primary
and secondary guy rings
10
11 12 13 14
15 16 17 18 19
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2015 BlueSky Mast, Inc. All Rights Reserved
[email protected] Read Manual Before Use
Refer to detailed instructions in the
AL2 Lift Series Manual at all times
AL2 Lift Series
Quick Reference Sheet - Primary and Secondary Guying
LOWERING / RECOVERY
Remove all remaining tripod
stakes and stow them.
Slowly push up on the cross
bars to fold the tripod legs.
WARNING: Pinching Hazard.
Use the Velcro strap on the
tripod leg to secure the tripod.
SEE Pack Out Instructions
Below.
Release the ball stop from the
holder and wind up the cable on
the winch.
Remove the mounting pole and
center mast pole.
20
21
22 23
25
24
Remove and stow the winch
handle.

Other BlueSky Mast Lifting System manuals

BlueSky Mast AL3 Series User manual

BlueSky Mast

BlueSky Mast AL3 Series User manual

BlueSky Mast AL3 Series User manual

BlueSky Mast

BlueSky Mast AL3 Series User manual

BlueSky Mast AL350 User manual

BlueSky Mast

BlueSky Mast AL350 User manual

BlueSky Mast 350G XL Series User manual

BlueSky Mast

BlueSky Mast 350G XL Series User manual

BlueSky Mast 350G XL Series User manual

BlueSky Mast

BlueSky Mast 350G XL Series User manual

BlueSky Mast AL350G Series User manual

BlueSky Mast

BlueSky Mast AL350G Series User manual

Popular Lifting System manuals by other brands

Poweramp CM Series Owner & user manual

Poweramp

Poweramp CM Series Owner & user manual

Nussbaum UNI-LIFT 2500 Operating Instruction and Documentation

Nussbaum

Nussbaum UNI-LIFT 2500 Operating Instruction and Documentation

Rev-A-Shelf RAS-ML Series installation instructions

Rev-A-Shelf

Rev-A-Shelf RAS-ML Series installation instructions

RGC HL5-7K instructions

RGC

RGC HL5-7K instructions

DLM DL Series Owner & user manual

DLM

DLM DL Series Owner & user manual

MAHLE CWL-20E Operation manual

MAHLE

MAHLE CWL-20E Operation manual

Airo A16 J Series user manual

Airo

Airo A16 J Series user manual

BVA Hydraulics HL1001 instruction manual

BVA Hydraulics

BVA Hydraulics HL1001 instruction manual

QTek DStacker GS2 Operation & service manual

QTek

QTek DStacker GS2 Operation & service manual

Plymovent Balancer Series user manual

Plymovent

Plymovent Balancer Series user manual

Genie Lift Guard GR-12 Operator's manual

Genie

Genie Lift Guard GR-12 Operator's manual

Eagle Equipment MTP-9F manual

Eagle Equipment

Eagle Equipment MTP-9F manual

RUD VCB user manual

RUD

RUD VCB user manual

Clarke CBSS1 MOUNTING & USER INSTRUCTIONS

Clarke

Clarke CBSS1 MOUNTING & USER INSTRUCTIONS

Sirio Antenne SRS1351 - I user manual

Sirio Antenne

Sirio Antenne SRS1351 - I user manual

Omega 22910 Operating instructions manual

Omega

Omega 22910 Operating instructions manual

rodac RQLTP650 Declaration of conformity

rodac

rodac RQLTP650 Declaration of conformity

Harken WingMan IN404 Specification & user manual

Harken

Harken WingMan IN404 Specification & user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.