BOERPLAY FRPE520.001 User manual

FRPE520.001
Double swing

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
TOE FRP 520 001 C
Free Play
Schommel
13-10-2014
BOER
SPEELTOESTELLEN
Afmetingen
Dimensions
3,55 m
1,28m
0,00 m
2,04 m
2,11 m
>0,35m

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
TOE FRP 520 001 C
Free Play
Schommel
13-10-2014
BOER
SPEELTOESTELLEN
Obstakelvrije zone
Obstacle free zone
Obstakelvrij WAS
Obstacle free WAS
Opvangzone
Impact area
Obstakelvrij EN-1176
Obstacle free EN-1176
6,35m
3,17 m
7,35m
4,30 m
2,41m
R1,50m
6,48 m

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
TOE FRP 520 001 C
Free Play
Schommel
13-10-2014
BOER
SPEELTOESTELLEN
Bodemplan
Groundplan
0,45 m 3,40 m 0,45 m
3,18m
1,31m
2,86m
0,60m
0,40 m
0,50 m
rondmarkering
Ground le el marker

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
TOE FRP 520 001 C
Free Play
Schommel
13-10-2014
BOER
SPEELTOESTELLEN
Modules
Modules
Opmerking
BenamingRev.Bew.
Volgnr
Progr.Type#Nr
Linker Schommelframe
Free Play
009371
FRP
MOD
11
Rechter SchommelframeFree Play
010371
FRP
MOD12
D bbele Schommel Frame Free Play
B102371FRPMOD13
Ketting 1,45 m
Schommelzitje
A103371FRPMOD24
2
3
4
1
Typeplaatje
Identification plate
B
Geleverde modules:
Zie tabel
Montageinstructie:
De hoofdmaten geven de maten van de staanders en vloeren aan
De detailtekeningen geven specifiek de maten van de verbindingen aan
De modules met buizen zijn op de tekeningen bemaat op bovenkant kopplaat
Overige modules zijn bemaat op de bovenkant (klimwanden, paalkappen, etc.)
Montagevolgorde:
1 Graaf de gaten volgens het bodemplan
2 Plaats 1,2
3 Plaats 3 en verbind deze aan 1,2
4 Plaats 4(2x) en verbind deze aan 3
5 Controleer of het toestel voldoet aan de afmetingen zoals op blad 'afmetingen'
6 Dicht de gaten en verdicht het zand
Controles:
1 Correcte opbouw en alle bevestigingsmiddelen
2 Controleer de afmetingen van de valbodem t.o.v. het toestel
Supplied modules:
See table
Assembly instruction:
The main dimensions indicate the dimensions of the posts and floors
The detailed dimensions show the specific dimensions of the connections
The modules which contain tubes are dimensioned at the top of the flanges
Other modules are dimensioned at the top (climbing walls, caps for the posts, etc.)
Assembly sequence:
1 Dig the holes according to the ground plan
2 Place 1,2
3 Place 3 and attach it to 1,2
4 Place 4(2x) and attach it to 3
5 Check that the equipment conforms to the dimensions shown on sheet 'dimensions'
6 Close the holes and compact the sand
Checks:
1 Correct assembly and all the fasteners
2 Check the dimensions of the safety area with regard to the play equipment

LOGBOOK
(Onderstaand logboek kan gebruikt worden om te voldoen aan de eisen, gesteld in artikel 14 van het Warenwetbesluit Attractie- en Speeltoestellen)
Type indication Free Play
Product code FRPE520.001
Name of equipment Dubbele Schommel
Maximum height of fall 1,3 m
Year of construction 2017
Certificate 130812
inspection authority Keurmerkinstituut
Groeneweg 2e, Zoetermeer - 2718AA Zoetermeer
Name manufacturer BOERplay
Hyacintstraat 2 - 4255 HX Nieuwendijk
Phone: +31 (0)183 40 23 66
Fax: +31 (0)183 40 35 64
name installer
Description of equipment Double swing
Location of equipment
Data about the owner of the play equipment
Name:
Address:
Postcode and town:
Contact person:
Telephone number:
Data about the administrator of the play equipment
Name:
Address:
Postcode and town:
Contact person:
Telephone number:
FRPE520.001
Double swing

LOGBOOK
Inspection and maintenance intervals
Nr.
Inspection Maintenance
months
between
inspections
1
Verify equipment's stability, junctions and missing parts.
Inspect bolts, screws and nuts for absence, jams, corrosion
and wear.
Add missing parts, secure joints, apply missing fixing
agent and replace corroded parts.
1
2
Chec suspension for wear. Replace worn parts and/or remove non-functioning
parts.
1
3
Inspect rotating parts such as hinges, rolling-element
bearings, etc. for wear and acceptability.
Replace worn parts and/or remove non-functioning
parts.
1
4
Chec wood for splinters, unacceptable damage and signs of
rot. Especially at ground level.
Repair damage. Replace affected wood. Smoothen
splintered wood and sharp edges.
1
5
Inspect foundation for stability, tearing and coverage. Restore foundation and covering material.
3
6
Examine rubber and synthetic parts for wear, damage and
brea . Replace original parts.
3
7
Inspect metal for corrosion and damage in the coating. Restore any damaged coating (after removing rust and
applying primer).
6
Chec ropes, cables, chains and nets for wear and damage.
Steel cables and nets which are tensioned must be chec ed
for tension.
Replace parts where necessary. Steel cables and nets
must be tensioned.
3
9
Inspect equipment for unsafe changes and additions. Remove unsafe additions and correct unsafe changes.
1
10
Inspect safety surfaces. Restore and repair where necessary.
1
Remarks
1. If used intensively, all points require extra attention.
2. Extreme weather conditions and locations may require a higher inspection frequency. Discuss this with
the supplier.
3. Vandalism-sensitive locations require stricter inspections, possibly daily.
4. Check the terrain regularly for items that do not belong there, are unsafe or may be used wrongly.
Examples are poisonous plants, glass shards, etc. Frequency depends on strain.
5. Remember that bad maintenance leads to unsafe conditions and notably faster impoverishment of the
playground area.
6. Replacement parts can be ordered at the manufacturer with the part numbers on the module drawing.
Drawings can be found in de user guide.
7. The impact area shall be provided with impact attenuating surface according to the specified falling
height.
. This list is conform the CEN-standard "playground equipment and surfacing NEN-EN 1176-7".


Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
MOD FRP 371 009
Free Play
Linker Schommelframe
25-5-2011
BOER
SPEELTOESTELLEN
Samenstelling module
Assembly module
OpmerkingBenamingRev.Bew.VolgnrProgr.Type
#
Nr
M16BORGMOER 020016010BSV1
M10 - VZ .Zeskantmoer
00010017BSV
7
2
M10 x 130 - VZ .
Zeskantbout ISO 4014
130010021BSV
7
3
M10 - VZ .
Sluitring
002010030BSV144
blauwinterplay donut
050011DONKST65
blauwinterplay dop
050011DOPKST66
Paal 99x99Rebo 2600
A
100011
FRP
ORE
17
50 kgPoermodel 10
050010POEOBT2
Schommel SchoorLinkerstaander
A
61016
FRPSME19
Schommelstaander
VoetsteunB
372021
FRP
SME
1
10
6
5
2
4
6
5
3
4
9
7
8
10
3
4
2
4
1
1

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
MOD FRP 371 010
Free Play
Rechter Schommelframe
25-5-2011
BOER
SPEELTOESTELLEN
Samenstelling module
Assembly module
OpmerkingBenamingRev.Bew.VolgnrProgr.Type
#
Nr
M16BORGMOER 020016010BSV81
M10 - VZ 8.8Ze kantmoer
008010017BSV
7
2
M10 x 130 - VZ 8.8
Ze kantbout ISO 4014
130010021BSV
7
3
M10 - VZ 8.8
Sluitring
002010030BSV144
blauwinterplay donut
050011DONKST65
blauwinterplay dop
050011DOPKST66
Paal 99x99Rebo 2600
A
100011
FRP
ORE
17
50 kgPoermodel 10
050010POEOBT28
Schommel SchoorRechter taander
A
618
017FRPSME19
Schommel taander
Voet teunB
372021
FRP
SME
1
10
6
5
4
2
6
4
3
5
2
4
3
4
1
1
7
8
8
9
10

B
BB
Be
ee
en
nn
na
aa
am
mm
mi
ii
in
nn
ng
gg
g
Title
O
OO
Op
pp
pm
mm
me
ee
er
rr
rk
kk
ki
ii
in
nn
ng
gg
g
Comment
D
DD
Da
aa
at
tt
tu
uu
um
mm
m
Date
T
TT
Te
ee
ek
kk
ke
ee
en
nn
ni
ii
in
nn
ng
gg
g
Drawing
MOD FRP 371 102 B
Free Play
Dubbele Schommel Frame
13-10-2014
BOER
S
SS
SP
PP
PE
EE
EE
EE
EL
LL
LT
TT
TO
OO
OE
EE
ES
SS
ST
TT
TE
EE
EL
LL
LL
LL
LE
EE
EN
NN
N
Samenstelling module
Assembly module
Opmerking
BenamingRev.Bew.
Volgnr
Progr.Type#Nr
Free PlayDubbele Schommel Stang
B
372062
FRP
SME11
1

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
MOD FRP 371 103 A
Schommelzitje
Ketting 1,45 m
4-11-2013
BOER
SPEELTOESTELLEN
Samenstelling module
Assembly module
Opmerking
BenamingRev.Bew.
Volgnr
Progr.Type#
Nr.
M10 - RVS A2-70
Borgdo moer
020010011BSR41
M10 x 120 - RVS A2-70
Zeskantbout
120010021BSR42
M10SLUITRING
002010030BSR83
RVS A2-70
Schommelscharnier
091012081BSR2
4
Donut zwart
Beschermdo M10-M12
060010DONKST45
Do zwart
Beschermdo M10-M12
060010DOPKST46
Galileo VVul laat
POM006SOLKST47
Zitje incl. ketting
090
145ZIT
SMD
1
8
Met vork 1,45 mSchommelketting 5mm
145005
KETRNT
28.1
Zwart
Schommelzitje CNK
090001
ZIT
CNK
1
8.2
M8 x 25 - RVS A2-70Zeskantbout
025008021BSR
4
8.3
M8 - RVS A2-70
Sluitring
002008030BSR
4
8.4
2
6
3
5
3
1
8.2
7
7
4
8.1
8.4
8.3
Table of contents
Other BOERPLAY Baby Swing manuals