8
INSTALLATIONINSTRUCTION
The machine isequipped withpowervoltagecompensation equipment. When powervoltagefluctuates
between±15%ofratedvoltage, it still can worknormally.
When uselongcable,inordertopreventvoltageformgoingdown,biggersection cableissuggested.If
cableistoo long,itmayaffectthe performanceofthe powersystem.Sowesuggestyou touseconfigured
length.
1. Makesureintakeofthe machine notblocked orcovered, lest coolingsystemcouldnot work.
2. Makegood connectionofshieldedgassource.Gassupplypassageincludescylinder,argon
decompress flowmeterand pipe. Connectingpart ofpipeshouldusehooporotherthingstofasten,
lest argon leaks outandairgetsin.
3. Ground the cableswithsection area no
less than 6mm2tothe housing,the way
isconnectingscrewinthe back ofthe
powersourcetoground device
4. Correctlyconnectthe arctorchorholder
accordingtothesketch.WhenuseMMA
welding:Makesurethe cable,holderand
fasteningplughavebeen connectedwith
theground.Putthefasteningplugintothe
fasteningsocketatthe “-”terminaland
fastenitclockwise.When useTIGwelding:
Putthegas-electricityplugofthe welding
gun tothejointatthe frontpanel,and
fastenclockwise.Puttheairswitchonthe
guntotherelevantjointatthe frontpanel,
andfastenthescrew.
5. Putthefasteningplugofthecableto
fasteningsocket of “+”terminalatthefront panel, fastenitclockwise,andtheearthclampattheother
terminalclampstheworkpiece.
6. Accordingtoinput voltagegrade, connect powercablewithpowersupplyboxofrelevant voltage
grade. Makesurethereisnomistakeand the voltageofpowersupplydoesnot exceed permission
range.. Afterthe abovejob,installation isfinished and weldingisavailable.
WARNING
Beforeconnecting operation please make sureall thepoweristurnedoff.Therightorder
istoconnectthewelding cableand ground cabletothemachinefirst,and make suretheyarefirmly
connectedand thenputthepowerplug tothepowersource.
Installation diagram