
Installation and Operation Manual
X-PR-SLA5800-PC-eng
PartNumber:541B091AAG
July,2010
Models SLA5810 and SLA5820
ESD(ElectrostaticDischarge)
CAUTION:Thisinstrumentcontainselectroniccomponentsthataresusceptibletodamagebystaticelectricity.Properhandlingproceduresmustbeobserved
duringtheremoval,installationorotherhandlingofinternalcircuitboardsordevices.
HandlingProcedure:
1. Power to unit must be removed.
2. Personnel must be grounded, via a wrist strap or other safe, suitable means before any printed circuit card or other internal device is installed, removed or
adjusted.
3. Printed circuitcardsmustbe transported in a conductivecontainer.Boardsmustnot be removed fromprotectiveenclosureuntilimmediately before
installation. Removedboardsmustimmediatelybeplacedinprotectivecontainerfortransport,storageorreturntofactory.
Comments
This instrument is not unique in its content of ESD (electrostatic discharge) sensitive components. Most modern electronic designs contain components that
utilize metal oxide technology (NMOS, SMOS, etc.). Experience has proven that even small amounts of static electricity can damage or destroy these devices.
Damagedcomponents,even though theyappearto functionproperly,exhibitearlyfailure.
BrooksInstrumentdesigns,manufacturesandtests its products to meet many national and internationalstandards.Theseproductsmustbeproperly
installed,operatedand maintainedtoensure they continuetooperate within theirnormalspecifications. Thefollowinginstructionsmustbe adheredtoand
integratedintoyour safetyprogramwhen installing,operatingand maintainingBrooksInstrument products.
• Toensureproperperformance, use qualifiedpersonnelto install,operate,update, program andmaintaintheproduct.
• Read all instructions prior to installing, operating and servicing the product. If this instruction manual is not the correct manual, please see back cover for
local sales office contact information. Save this instruction manual for future reference.
WARNING:DonotoperatethisinstrumentinexcessofthespecificationslistedintheInstructionandOperationManual.Failuretoheedthiswarningcanresultin
seriouspersonalinjuryand/ordamagetotheequipment.
• If you do not understand any of the instructions, contact your Brooks Instrument representative for clarification.
• Followallwarnings, cautionsandinstructionsmarked onandsupplied with theproduct.
• Installyourequipment asspecifiedin the installationinstructionsof theappropriateinstruction manual andperapplicable local andnationalcodes.
Connectallproducts totheproperelectrical andpressuresources.
• Operation: (1) Slowly initiate flow into the system. Open process valves slowly to avoid flow surges. (2) Check for leaks around the flow meter inlet and
outlet connections. If no leaks are present, bring the system up to the operating pressure.
• Pleasemakesure thattheprocessline pressureisremoved prior toservice.When replacement partsarerequired, ensure thatqualifiedpeople use
replacementpartsspecified byBrooksInstrument.Unauthorized partsandprocedures can affecttheproduct's performance andplacethesafe operation
of your process at risk. Look-alike substitutions may result in fire, electrical hazards or improper operation.
• Ensurethatall equipment doors areclosedandprotective covers are inplaceto prevent electrical shockandpersonalinjury, exceptwhenmaintenanceis
beingperformed byqualifiedpersons.
WARNING:Forliquidflowdevices,iftheinletandoutletvalvesadjacenttothedevicesaretobeclosedforanyreason,thedevicesmustbecompletelydrained.
Failuretodosomayresultinthermalexpansionoftheliquidthatcanrupturethedeviceandmaycausepersonalinjury.
Allpressureequipmentwithaninternalpressuregreaterthan0.5bar(g)andasizelargerthan25mmor1"(inch)fallsunderthePressureEquipmentDirective(PED).
• The Specifications Section of this manual contains instructions related to the PED directive.
• Metersdescribedinthis manual are in compliance withENdirective97/23/EC.
• AllBrooksInstrumentFlowmetersfall under fluid group 1.
• Meters larger than 25mm or 1" (inch) are in compliance with PED category I, II or III.
• Metersof25mmor1"(inch)orsmallerareSoundEngineeringPractice(SEP).
TheBrooksInstrument(electric/electronic)equipmentbearing the CE mark has been successfullytestedtotheregulationsof theElectroMagnetic
Compatibility(2004/108/EC (EMCdirective89/336/EEC)).
Specialattentionhowever is requiredwhenselecting thesignalcableto beusedwithCE markedequipment.
Qualityofthesignalcable,cableglandsandconnectors:
Brooks Instrument supplies high quality cable(s) which meets the specifications for CE certification.
If you provide your own signal cable you should use a cable which is overall completely screened with a 100% shield.
“D”or“Circular”type connectors used shouldbeshieldedwitha metal shield. Ifapplicable,metalcable glands must be usedprovidingcablescreenclamping.
Thecablescreenshould be connected to themetalshellor gland and shielded atbothendsover 360 Degrees.
Theshieldshould beterminatedto an earthground.
CardEdgeConnectorsarestandardnon-metallic.Thecablesusedmustbe screened with 100% shield to comply with CE certification.
Theshieldshould beterminatedto an earthground.
Forpinconfiguration:Pleaserefertothe enclosed Instruction Manual.
EuropeanPressure EquipmentDirective (PED)
EuropeanElectromagneticCompatibility (EMC)
Essential Instructions
Read before proceeding!