BCU
Base
Overall structure
Battery-Box H 7.5
Battery-Box H 10.0
BYD Battery-Box HV
QUICK INSTALLATION GUIDE
Valid for Battery-Box H 5.0/7.5/10.0
Tools
USA V 2
Skilled personnel only:
This manual and the tasks and procedures described herein are intended for use by skilled workers only.
A skilled worker is defined as a trained and qualified electrician or installer who has all of the following skills and experience:
Important
Installation environment requirements
Max.
Min.
Fire-resistant locations only
(Concrete/Drywall/Exterior
Siding Etc.)
Flammable wall Flammable
Materials, Gas, Furnace, Etc
RH.
+5%~+95%
Packing list
Packing of BCU+BASE
Packing of B-Plus H 2.5
M6 ×2
④OT terminal for P+/P-×4
Expansion bolt ×3
Wire Crimp Power drill
Direct sunlight Direct rain fall Snow
accumulation
YES YES
NO NO
YES
NO
NO
Battery-Box H 5.0
B-Plus H 2.5
Wrench
Black sealing plug ×4
M6 ×6 ⑤ Black sealing plug ×2
Battery-Box webpage in accordance with this document.
The system switch must be off before installing.
Please read the quick installation guide and installation manual carefully before installation.
www.eft-systems.de(Support->Downloads)
YES