Installation:
Step 1:The UV disinfection system should always be the last piece of treatment before the water
branchesofftoanyhotorcoldwaterlines.
Step2:CALMAGYORKSHIRELTDstronglyrecommendsthata5micronfilterbeinstalledbeforetheUV
systemforafinalpolishingstepbeforethewaterisdisinfected.
Step3:Thechambercanbeinstalledeitherhorizontallyorverticallyusingtheclampsprovided.
Step4:Ifyoudonotknowtheflowrateofthewatersupplyintheapplication,itisrecommendedthat
youuseaflowrestrictorsothattheratedflowofyourparticularCALULTRAsystemisnotexceededand
the UV dose is not compromised. The flow restrictor should be installed on the outlet port of the
chamber.
Step 5:It is strongly recommended to have a licensed plumber connect the UVchamberto the water
supply and may be a requirement depending on where you are located. If you are attempting this
yourself,ensureyouhaveallthenecessarytoolsandfittingstoaccomplishthistask.
Step 6:Although there are many methods of installation, this manual will provide a recommended
procedure using copper plumbing and standard soldering methods. CALMAG YORKSHIRE LTD
recommendstheuseofunions,abypassassemblyandshutoffvalvesasthiswillallowyoutoisolateand
remove the UV chamberif necessary (this is a recommended method only however it allows for the
maximumconveniencebutitrequiresextracomponentsandmoretimeforinstallation).
Step 7: Before you cut into the cold water line, measure and cut all piping as per the recommended
layout.Onceallthecomponentsareready,startbyinstallingthefemaleadaptersontotheportsofthe
chamber.Toensureaproperseal,theuseofPTFE™tapeisrecommendedonallthreadedconnections.
Step8:Nextsolderalltheassemblytogether,includingballvalvesandunionsandfinallyconnectedthe
bypassassemblytothecoldwaterfeedline(waterinandwaterout).
Step9:YoucannowgentlyremovethequartzsleevefromitspackagingbeingVERYcarefulnottotouch
thelengthwithyourhands.Theuseofcottongloves(notincluded)isrecommendedforthisprocedureas
oilsfromourhandscanleaveresidueonthesleeveandlampwhichcanultimatelyblocktheUVlightfrom
gettingtothewater.Inthepackage,youwillfindtwolubricatedOrings.
Step 10:Carefully slide the sleeve into the chamberuntil you can feel it hit the opposite end of the
chamber.Maneuverthesleevegentlyuntilitslidesthroughtheoppositeendofthechamber.Witha¼”
ofthesleevestickingouteachendofthechamberslideoneOringontoeachend.EnsurethateachO
ring is butted up against the chamber(see Figure 5). Assemble the bottom gland nut (the black nut
without the through hole) onto the threaded end of the chamberand tighten. The gland nuts have a
positivestoptoavoidovertightening,handtightenONLY.Next,assemblethetopglandnut(theblacknut
withthe throughhole) ontothethreaded endof the chamberandtighten.Slidetheprovidedstainless
steel compression spring inside the quartz sleeve. This spring simply sits in the bottom of the quartz
sleeveandworkswiththelampandconnectortocreatetheproperlampalignment.
Page
9