Connections:
Installation:
• Choose the proper position on ceiling to mount the etector, be sure that the istance to gas source is about
2m
• Fix the 86 x 86 box on the selecte place by screws, then fix the etector on it
ote: avoi installing the etector close to the following sources of interference: irect air flow form vents,
fans, oors, win ows, sources of steam, oil vapor, etc.
Relay delay setting:
To set the operating time of the relay after the alarm, unscrew an remove the top cover, then fin the jumpers
name “1” an “2” near the terminal blocks.
As efault setting, jumpers 1 an 2 shoul be connecte , which means that the relay will be activate
imme iately in case of alarm.
If jumper 1 only is connecte , the relay will be activate within 10 sec. after the alarm.
If jumper 2 only is connecte , the relay will be activate within 30 sec. after the alarm.
If no jumper is connecte , the relay will be activate within 60 sec. after the alarm.
Operating instructions:
The etector can be use in epen ently or to activate an external evice (e.g. the e-valves art. 30009091 an
30009092).
1A – In epen ently.
• Choosing a suitable position to install the etector accor ing to the INSTALLATION
• With 12V DC power supply an after the warm-up (the green LED flashes per secon uring this process), the
etector comes into normal etecting state
1B – To activate an external evice.
•Choosing a suitable position to install the etector accor ing to the INSTALLATION. Connect the external
evice with the contacts NC / NO of the output relay
•With 12V DC power supply an after the warm-up (the green LED flashes per secon uring this process), the
etector comes into normal etecting state
2 - While etecte the gas leaking, the re LED flashes, the buzzer sen s out the alarm soun an the relay will
be activate. The etector will resume to the etecting state when the gas ensity is lower than the alarm
level.
3 - The yellow LED on means the sensor insi e error. Please cut off the power supply an contact the installer.