
Step 3
Please remove the back cap by
the screw driver (not provided)
as shown in figure. Please keep
the screws in order to screw back
after the monitor installation are
completed.Then pull out the cable
in order to install the monitor.
Caution for weight capacity adjustment:
Adjustment:
1.Make sure you have
checked out the weight of
the panel you wish to mount.
2.Support the arm throughout/during
assembly.
3.Pull down the arm and take
out the upper cap(See as
below figure)when adjust.
Use the Allen key provided to
adjust the weight capacity.Twist
the Allen key in a clockwise direction
for more weight;counterclockwise
direction for less weight.
1.Please insert the grab handle into the 2
holes on the bottom of universal joint.
2.Then fix the grab handle with 4 screws
by 2.5 mm Allen Key to the 4 holes on
the lower part of universal joint.
Fix the Monitor on the VESA mount using Allen Key and screws.
Please insert the cable to the monitor,complete the circuit and then fix
the cap.
LCD Monitor Assemble
Step 5
LCD Monitor grab handle
Adjustment For Loading
Step 4
Cables Arrange
05 X1
X1
12
(M6X40)
(4mm)
06 X4
X4
07
11
(M4X35)
(4mm)
X1
(2.5mm)
04
11
2-3