
IM 817-7 2 www.DaikinApplied.com
General Data .................................3
Model Nomenclature ..........................3
Receiving & Handling .........................4
Visible Loss or Damage .......................4
Concealed Loss or Damage ....................4
Storage ....................................4
Lifting Unit ..................................4
Pre-Installation Information.....................5
Safety .....................................5
Properly Identify Unit Ventilator(s)................6
Uncrate and Inspect the Unit Ventilator(s) .........6
Wall Openings, Louvers, and VentiMatic™ Shutter ..6
VentiMatic™ Shutter Assembly ..................6
Installing Louvers.............................7
Louver Details ...............................7
Louver Installation With Typical Unit Congurations ..8
Typical Installation Methods ...................10
Installing the VentiMatic Shutter Assembly .......11
Before Setting the Unit in Place ................12
Removing Unit from the Skid ..................12
Mounting Holes, Piping and Electrical Knockout
Locations & Dimensions ......................13
Reversing Drain Pan Slope....................13
Typical Floor Unit Installation ..................15
Unit Ventilator Installation .....................16
Make Piping Connections .....................16
Water Coil Connections.......................17
Coil Headers, Locations.......................18
Heating Only Units ..........................18
Cooling Only Units ..........................19
Heat/Cool Units .............................20
Reheat Units ...............................22
Typical Valve Packages .......................23
2-Way and 3-Way Hot Water and Chilled Water
Modulating Valve Selection ....................29
Typical Piping Arrangements ..................30
Heating – Hot Water End of Cycle Valve Piping ....30
Cooling – Chilled Water EOC Valve Piping ........31
Typical Water Coil Piping - EOC Valve Piping......31
Steam – Typical Modulating Valve Piping .........32
Typical Steam Coil Piping .....................33
Heating – Modulating Valve Piping ..............34
Cooling – Chilled Water Modulating
Valve Piping................................35
Condensate Piping:..........................36
Unit Ventilator Split Systems Guidelines .........37
Checking System Charge .....................38
Determining Subcooling ......................38
Determining System Superheat ................39
Superheat Adjustment........................40
Making Control Connections...................40
MicroTech Unit Mounted DDC Control Components –
Models AVS, AVV, and AVR....................40
Typical MicroTech Wiring –
115Volt / 60Hz / 1 Phase......................44
MicroTech Unit Electrical Connections ..........46
MicroTech Wall Mounted Sensor................47
Typical Connections For Temperature Sensor
Applications................................48
Making Control Connections...................51
Digital Ready™ – Face & Bypass Control
Components Model AVS ......................51
Typical Wiring Diagram .......................53
Digital Ready Face and Bypass Control ..........53
Digital Ready Unit Mounted Temperature Sensor
Specications ..............................54
Digital Ready – Damper Actuator Specications....55
Digital Ready Unit Electrical Connections.........56
Controls by Others Components................57
Typical Controls by Others Wiring Diagram – Units
with Optional EC Motor with Variable Airow ......59
Typical Controls by Others Wiring Diagram – Units
with Optional EC Motor with Variable Airow, Valve
Control....................................60
Controls by Others – Field Installed .............61
Controls by Others – Electrical Connections.......62
Electric Heat Wiring Diagram – Typical...........64
Electric Heating ............................65
Draftstop™ System/Window Down-draft Installation 67
Finned Radiation System .....................70
Installing Unit Ventilator End Panels: ............71
Prepare Unit Ventilator(s) for Start-up ...........72
Oiling the Fan Shaft End Bearing:...............72
Unit Ventilator Start-up .......................72
Filter(s) ...................................73
Complete Check, Test and Start Procedure ......73
Installer/Owner’s Responsibility ................73
Check, Test & Start Procedure For:
Daikin Applied Unit Ventilators .................74
Table of ConTenTs