
TABLE OF CONTENTS
Page I © 2005 DH Instruments, Inc.
T
TA
AB
BL
LE
E
O
OF
F
C
CO
ON
NT
TE
EN
NT
TS
S
TABLE OF CONTENTS...............................................................I
TABLES.................................................................................III
FIGURES................................................................................III
ABOUT THIS MANUAL ...............................................................I
1. INTRODUCTION .................................................................3
1.1 PRODUCT OVERVIEW ...........................................................................................................................3
1.2 SPECIFICATIONS ...................................................................................................................................4
1.3 INSTRUMENT LAYOUT ..........................................................................................................................5
1.3.1 FRONT PANEL..............................................................................................................................................5
1.3.2 OVERALL DIMENSIONS...............................................................................................................................5
1.3.3 SYSTEM SCHEMATIC ..................................................................................................................................6
2. INSTALLATION ..................................................................7
2.1 UNPACKING AND INSPECTION ............................................................................................................7
2.1.1 REMOVING FROM PACKAGING..................................................................................................................7
2.1.2 INSPECTING CONTENTS.............................................................................................................................7
2.2 PGC-10000-AF SYSTEM.........................................................................................................................8
2.3 SITE REQUIREMENTS............................................................................................................................9
2.4 INITIAL SETUP......................................................................................................................................10
2.4.1 SET UP GPC1..............................................................................................................................................10
2.4.2 CONNECT PNEUMATIC POWER (DRIVE AIR) .........................................................................................10
2.4.3 CONNECT HIGH PRESSURE GAS SUPPLY (GB-152-AF).......................................................................11
2.4.4 MAKE TEST PRESSURE INTERCONNECTIONS......................................................................................12
2.4.4.1 CONNECT THE SYSTEM REFERENCE PRESSURE MEASURING DEVICE (RPM4/HPMS
A70M/A20M-AF).......................................................................................................................................12
2.4.4.2 CONNECTING TO A DEVICE UNDER TEST..........................................................................................12
2.4.4.3 CLEANLINESS CONSIDERATIONS WHEN CONNECTING DUTS....................................................13
2.5 POWER UP AND VERIFICATION.........................................................................................................15
2.5.1 APPLY THE HIGH PRESSURE SUPPLY...................................................................................................15
2.5.2 ADJUST THE INLET PRESSURE...............................................................................................................15
2.5.3 APPLY PDVV DRIVE PRESSURE..............................................................................................................16
2.5.4 CHECK OPERATION OF COMPONENTS..................................................................................................16
2.5.5 PRECAUTIONS TO TAKE BEFORE WORKING WITH HIGH PRESSURE GAS / SAFETY
CONSIDERATIONS.....................................................................................................................................17
2.6 STORAGE AND SHIPPING...................................................................................................................18