
About the ConnectCore MP15 Features and functionality
ConnectCore MP15 Development Board 6
About the ConnectCore MP15
The Digi ConnectCore® MP15 development kit and System-on-Module (SOM) platform is a highly
integrated, cost-effective, connected, secure embedded solution, built on the STM32MP15x MPU
family. It integrates memory, power management, the Digi Microcontroller Assist™, pre-certified
wireless connectivity and advanced Digi TrustFence device security with a complete, open-source
Linux software platform based on the Yocto Project.
Note While the ConnectCore MP15 system-on-module is designed to be used in a production
environment, the ConnectCore MP15 Development Kit is designed only for development and testing in
a pre-production environment.
Features and functionality
nConnectCore MP15 module
lSTM32MP157C dual ARMCortex-A7 and single Cortex-M4 cores operating at speeds up to
800MHz
lUp to 1 GB, 16-bit DDR3 memory
lUp to 1 GB, 8-bit SLC NAND flash memory
lIEEE 802.11 a/b/g/n/ac WLAN and Bluetooth 5.0
nPower
lPower jack or industrial-dedicated 5V power connector
lCoin-cell battery charger, supplying the on-module RTC
lPower and reset buttons
nBoot source configuration
lNAND, USB, microSD
nDebug
lStandard IEEE 1149.1 JTAG interface
lSerial console at AB-type micro-USB connector and TTL level
nMultimedia
lMIPI DSI display
lHDMI display (through MIPI-to-HDMI transceiver)
lParallel 24-bit LCD interface with FFC on-board connector
lLVDS interface with up to four differential data pairs (through parallel-to-LVDS transceiver)
l8-bit parallel camera
lAudio CODEC with the following functionality
oOne 3.5 mm headphone jack
oOne 3.5 mm microphone jack
oTwo speaker outputs