EkoOkna RAFF-I Series User manual

ASSEMBLY INSTRUCTION
OF THE RAFF-I FAÇADE BLINDS

1.Of the raff-i façade blinds
La présente notice est composée d’une partie descriptive et d’une partie comprenant des dessins illustrant les principales
étapes de la pose. La partie avec les dessins est incluse dans la partie des instructions d’installation. Cette notice doit être
considérée comme la notice originale au regard des dispositions de la directive européenne 2006/42/CE. Ces instructions
contiennent des informations importantes sur le produit. Veuillez les lire attentivement et vous y conformer.
2.Information before the assembly
Before installing the façade blind package, its condition and correctness should be checked. Pay particular attention to the
condition of the straps and ladders (if any). The packed box and rails should be stored in a dry place until assembly. It is
forbidden to stack boxes, rest objects on boxes or place items on boxes. Prior to installation, the condition of the building’s
facade should be assessed. If necessary, additionally attach the box or guides directly to the building or façade. Additional
reinforcements of the RAFF-i box must be attached to the lintel of the building. The façade blind package may only be
installed in the RAFF-i box when it is in a technically perfect condition. No additional structural elements or non-system fixings
may be mounted on the box. They can adversely affect the function of the façade blinds and lead to damage to it. The end
positions of the façade blind package are preset. In case of de-programming, they must be set again in accordance with the
manual of the motor used in the façade blind package.
During installation, the health and safety regulations must be observed. The RAFF-i box should be installed by at least 2 pe-ople.
Electrical installations must be performed by authorized electricians in accordance with the requirements of the country where
the installation takes place. When working at greater heights, installers and construction elements must be secured against
falling. Some components of the RAFF-i system can be cut from sharp edges!
ASSEMBLY INSTRUCTION
OF THE RAFF-I FAÇADE BLINDS
3.Installation of the façade blind
In order for the façade blinds to meet its technical properties, the correct production process and correct assembly are im-
portant.
EXAMPLES OF CONSTRUCTION VARIANTS
On the reveal in the version of a
visible box.
On the reveal in the flush-mounted
version of the box.
On the wall in a flush-mounted
version.
On the wall in the visible version.
On the window in the visible
version with the use of offsets.
On the window in the visible
version with the use of offsets at the
back and front (e.g., for a recess).

ASSEMBLY INSTRUCTION
OF THE RAFF-I FAÇADE BLINDS
ASSEMBLY OF THE GUIDE ON THE SIDE
Drill mounting holes on the side of the guide in the numbers
shown below, depending on the length of the guide.
With the guide bar length:
≤ 150 cm: 2 fixings on the FS
≤ 250 cm: 3 fixings on the FS
> 250 cm: 5 fixings on the FS
> 300 cm: 7 fixings on the FS
Attach the MONOBLOK EKOOKNA
Aluminum guide to the side of the façade or other surface
using assembly screws (not included in the set). Plug from
the front with the enclosed aluminum profile.
Ø10
Ø5
FRONT GUIDE MOUNTING
Drill mounting holes in the guide from the front in the
numbers shown below, depending on the length of the
guide.
With the guide bar length:
≤ 150 cm: 2 fixings on the FS
≤ 250 cm: 3 fixings on the FS
> 250 cm: 5 fixings on the FS
> 300 cm: 7 fixings on the FS
Mount the MONOBLOK EKOOKNA
Aluminum guide on the façade or window frame using
assembly screws (not included). Plug from the front with
the enclosed aluminum profile.
Ø10
Ø5

ASSEMBLY INSTRUCTION
OF THE RAFF-I FAÇADE BLINDS
Place the box from the top. There are special pins
protruding from the box, which just need to be inserted
into previously mounted guides.
Attach the MONOBLOK EKOOKNA aluminum
guide to the side of the façade or other surface using
assembly screws (not included in the set). Plug from the
front with the enclosed aluminum profile.
In the case of additional system reinforcements of the
RAFF-i boxes, attach the box to the lintel.
Mounting screws are not included.

ASSEMBLY INSTRUCTION
OF THE RAFF-I FAÇADE BLINDS
HOW TO ASSEMBLE THE REVISION HATCH:
Attach the box cover plates to the side covers with rivets in accordance with the drawings below.
10-15mm25mm
25mm
10-15mm
10-15mm
50mm
10-15mm
50mm
* Alternative method of mounting the revision hatch
The front wall of the box (revision hatch) can be fixed
with a fastening element in the side wall of the box.

ASSEMBLY INSTRUCTION
OF THE RAFF-I FAÇADE BLINDS
Place the façade blind package in the box. The pac-
ka-ge should be attached to the box with automatic
grips installed inside the box on the side walls and on
ad-ditional box reinforcements.
Insert the PVC guide in such a way that the guides of the
façade shutter set are inside it.
TIPS:
◾Press the PVC guide so that it is seated
in the aluminum MONOBLOK EKOOKNA guide.
◾The PVC guide should be disassembled before
removing the package from the RAFF-i box again.
Correctly mounted set of blinds in the PVC guide, inside
the RAFF-i system box.
38 mm
Attach the guide to the box, as shown in the
graphic below.

ASSEMBLY INSTRUCTION
OF THE RAFF-I FAÇADE BLINDS

ASSEMBLY INSTRUCTION
OF THE RAFF-I FAÇADE BLINDS
Guide
MONOBLOCK von EKOOKNA Guide
RAFF-e (A 45)
27
92
DIVIDER guide
TYP 4
22,5
21,1
40
70-90
20
92
27
Guide
PVC (A 40)

ASSEMBLY INSTRUCTION
OF THE RAFF-I FAÇADE BLINDS
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
All figures are indicative only
and may not fully represent the actual product.
NOTES

www.ekookna.com
Eko-Okna S.A. ul. Spacerowa 4 47-480 Kornice
01/2022
Table of contents
Other EkoOkna Window Blind manuals
Popular Window Blind manuals by other brands

Ametek
Ametek Dunkermotoren DCD22 manual

Velux
Velux Z0V Series manual

Screen Innovations
Screen Innovations Nano Box installation instructions

TUISS
TUISS Twist2Fit installation guide

John Lewis
John Lewis FAUX WOOD VENETIAN BLIND instruction manual

Swiss Sonnenschutz
Swiss Sonnenschutz Wood Line Series Assembly and operating instructions

sun collection
sun collection FALTSTORE UP & DOWN Assembly instructions

Graywind
Graywind 58511 user guide

Stobag
Stobag SG2400_7 Installation

Isotra
Isotra Vivera CONTROL AND MAINTENANCE MANUAL

ALTA
ALTA HONEYCOMB SHADES installation instructions

John Lewis
John Lewis DAY & NIGHT ROLLER BLIND instruction manual