
6
Assembly Instructions - Spectrum Chloramine Systems Only
CHECKING THE PARTS LIST PRIOR TO ASSEMBLY
Below is a box count for each system and its’ contents.
EWS-CC-1865-7 and CWL-CC-1865-7 should have 8 boxes.
One Box - Tall containing the 18” x 65” Tank with a 1.26” (32mm) Riser (ICN Riser Manifold - EWS Series only)
One Box (master carton) contains Valve, Valve Screen, Bypass Valve, Adaptors, Riser Cap, Funnel, Service Information Packet
One Box contains 50 lbs. underbed (pea gravel material specic to this system, ltration media and ow rate)
Five Boxes containing 1 cubic foot each of EWS’ proprietary Chloramine Reduction Media (CRM)
ASSEMBLY PROCEDURE - ALL SPECTRUM CHLORAMINE SYSTEMS
1. From tall box remove Tank.
Caution: Riser (or ICN Riser Manifold - EWS Series only) is in the Tank. Do not remove and be careful not
to damage. Riser will be positioned upon the loading of the underbed and ltration media.
2. Move the Tank to (or near) the systems’ nal install location. The Tank will be getting heavy once lled.
3. From master carton remove Valve, Valve Screen, Bypass Valve, Adaptors, Riser Cap and Funnel.
4. Cap the top of the clean Riser to prevent lling with CRM ltration media. Use Riser Cap included or any heavy-duty tape.
5. Place or adjust capped Riser in the center of the tank.
Caution: Riser rests at the bottom and center of Tank. Do not press down and follow loading instructions.
6. Load the Tank, using supplied Funnel in the following order:
A: From one box with Underbed (a “pea gravel” for better water distribution) load all materials until box is empty.
Caution: Slowly ll and make small adjustments as needed to make sure Riser is straight up and down, and
centered in Tank.
B: Find 5 (1865 systems) boxes with pre-measured CRM ltration media. This material is black and granular. Empty all the
contents of each box into the Tank.
Note: Top 1/3 of Tank should be empty. This is called freeboard for proper backwashing of the system.
Caution: Slowly ll and make small adjustments as needed to make sure Riser is straight up and down, and
centered in Tank.
Caution: Media is dusty. Do not inhale. Work in area with good ventilation and/or take preventative measures.
7. After Underbed and all CRM ltration media is loaded, remove the Riser Cap or tape from the top of the Riser.
8. Installation of the Valve onto the Tank:
A: Connect Valve Screen to the bottom of the Valve before connecting Valve to the Tank
B: Make sure the top of the Tank and Tank threads are clean of any debris or materials from Steps 1 through 6.
C: Center Riser where the Riser ts up into the center and bottom of the Valve. The Valve Screen at the bottom of the
Valve will help center and guide the Riser into the proper position. Back off the installation if resistence occurs and retry
unitil Riser ts in into position without any issues.
Warning: DO NOT force Riser into center bottom of the Valve. Riser should be straight and centered and should t
snugly into that position. A Riser that is forced to t, bent or off-center may fail under pressure.
D: Install the Valve onto the Tank by turning clockwise. Be careful not to cross-thread Valve onto Tank.
9. Thank you for properly lling and assembling the Tank, all its’ contents and connecting the Valve.
Please go to Page 7 and follow all instructions for the proper setup, installation and startup of all Spectrum Systems.