
20
ExhaustVentingInstallation
Thiswaterheatermustbeproperlyventedforremovalof
exhaustgases totheoutsideatmosphere.Correctinstal-
lationof thevent pipe systemismandatoryforthesafeand
efficientoperation ofthiswaterheaterandisanimportant
factorinthe lifeoftheunit.
Ventpipeinstallationmustbe performedinaccordance
withstateandlocalcodes,orintheabsence ofsuch,the
latestedition of NationalFuelGasCode,NFPA54/ANSI
223.1.Canadianinstallations mustbe performedinaccor-
dancewithCAN/CGA-B149.
VENTPIPE MATERIAL
EternalHybridWaterHeaterisagasburningappliance
withfan-assistedexhaust. Theappliancemustbevented
with4"CategoryIIIspecialventing,whichisairtightto
preventleakageofexhaustgases.
The appliancemustbe ventedseparaelyfromallother
appliances.Thefollowingtypeofnon-metallicventcanbe
used:
PVC (schedule40,ASTM-D1785)
CPVC (schedule40,ASTM-D2846)
ABS (schedule40,ASTM-D2661)
CategoryIIImetallicventing maybeusedwiththeappliance,
werecommend:
ZFlex lineofventingbyZ-Vent withadaptorNA2SVSNA04
GVentlineof venting byGrand Hall
Sealant(siliconbased)isrecommended withmetallicvent-
ing toensureproperseal.
VENTPIPE INSTALLATION
Thefollowing guidelines shouldbefollowedwheninstall-
ingtheexhaustoutletpiping:
- Venting shouldbe asdirectaspossiblewithaminimum
numberofpipefittings.
-Venting diametermustnotbereducedunless specially
noted intheinstallationinstructions.
- Support allhorizontalpipe runseveryfourfeetaccording
tolocalcodes.
-Ventsrunthrough unconditioned spaces wherebelow
freezingtemperaturesareexpectedshouldbeproperlyin-
sulatedtopreventfreezing.For horizontalruns,wrapthe
ventpipewithself-regulating 3or5wattheattape.Theheat
tape must be U.L. listedandinstalledperthemanufacturer's
instructions.
-Donotconnect thisventing systemwithanexisting vent or
chimney.
- Donotconnectcommon ventwiththeventpipeofany
otherwaterheater or appliance.
The exhaustoutlet pipingandterminationmaybeinstalled
inoneof thefollowingterminations:
1.StandardHorizontal(seepage22)
2.Vertical(seepage 22)
Allpipe,fitting,pipecement, primersandproceduremust
conformtoAmericanNationalStandardInstituteand Ameri-
canSocietyforTesting and Materials(ANSI/ASTM)stan-
dardsinthe United States.
CEMENTING PVC,ABSorCPVCPIPEandFITTING
Allprimers,cleanersand cementsmustmeetalllocal
codes and applicablestandardsoftheAmericanSociety
for Testing Materials.
Beforeusing primers, cleanersandcements,stir orshake,
makingsurecontentsareliquid.Donot useif foundtobe
lumpyorjelly-like.
1.Cutpipeendssquarelyremovingall burrsand dirt.
2. Dryfit pipeandfittingstobeconnected forproperfit.
3.Cleanpipeandfitting withaprimer/cleaner.
4. Applyathincoat of cement tofitting, avoiding pudding
inside.
5. Applyaliberalcoat ofcement topipeleaving no voids.
6.Quicklyassemblepartswhilecementisfluid.
7.Pushpipecompletelyintosocketoffitting, turningas
it goesuntilit bottoms.
8.Holdpipe andfitting together for30seconds.Then
carefullycleanoff excesswithacloth.
Allowconnectionsasufficienttimetocurebefore
disturbing.
9. Remember thatventpipes mustbe adequatelyand
securelysupported.
CUTTING OPENINGTHROUGH ANOUTSIDE WALL
ANDTERMINATOR INSTALLATION
The4"PVC,ABS or CPVC Schedule40 vent pipecanbe
runfromthewaterheaterthroughthewall orfromthe
wall tothe waterheater,whichever ismostconvenient.
Theventpipemustextendaminimumof1.5"through
theexteriorwall.Notethatinside collarsmustbeslipped
overthevent pipingbeforelocating thepipethrough the
wall.
Beforesecuringthe insideandoutsidecollarstothe
wall, useasiliconesealerbetween pipeandopeningto
ensurewaterand airtightseal.
Toprevent condensatefromcollecting intheventingsys-
temslopetheventatadownwardpitch of1/4"per12 ft.
withcondensatetrap.
Thiswaterheaterhasbeendesign certifiedbyCSAIntern-
ationalforusewiththespecifiedlisted plasticventpipe.
NOTICE !!
ForinstallationsinCanada,fieldsuppliedplastic
ventpipingmustcomplywithCAN/CGAB1491
(latestedition)andbecertified totheStandardFor
TypeBHGasVenting Systems,ULC S636 Com-
ponentsofthislistedsystemshallnotbe inter-
changedwithotherventsystemsorunlistedpipe/
fittings.Allplasticcomponentsandspecifiedprim-
ersand gluesofthecertified ventsystemmustbe
fromasingle systemmanufacturerandnot inter-
mixedwithothersystemmanfacturer'svent sys-
temparts.
Thesuppliedventconnectorand venttermination
arecertified aspartofthewaterheater.
puddling