17
MobileHome Installation
Allprimers,cleanersand cementsmust meet alllocalcodesand applicable standardsof the American SocietyforTesting
Materials(ASTM).
Cementing PVC, ABSorCPVC PIPEand FITTING
The appliance must be vented separatelyfromallotherappliances.The following type of non-metallicvent can be used:
VentPipeMaterial
PVC (schedule 40, ASTM-D1785)CPVC (schedule 40, ASTM-D2846)
PVC-DWV (ANSI/ASTM-D2665)ABS (schedule 40, ASTM-D2661)
Polypropylene Pipe Single wall &Components(ULC-S636, UL-1738)
Note : Do not use cellularfoamcore pipe.
●
●
●
●
●
Propermaterial forIntakeand Exhaustvent
Gas leakbeconducted forsupplypressures above1/2psig.
To install the properventing forthewaterheaterin aMobile Home (Manufactured Home)
This waterheatermust be properlyvented forremovalof exhaust gasesto the outside of the home. Correctinstallation
of the vent pipe systemismandatoryforthe safe and ef cient operation of thiswaterheaterand isan important factor
in the life of the unit.
WARNING
! !
VerticalTermination
Belowdiagrams areexamplesofvertical terminations.
Throughroof(Direct Vent) Throughroof(Concentric Vent)
□
Anopen tee is optionalbut recommended
touseasaterminationtoalleviateand
preventbackpressureinthe venting
system.
The Grand Hallapproved concentric
kitis auniquepipe-in-pipeventing
systemdesigned fortermination.Do
not trytoreplicateormakeyourown.
Formoreinformation,pleasereferto
Concentric Vent Kit
section inthe
Operation manual.
WARNING
! !
□
Throughroof(Power Vent)
□
!
WARNING
!
Pipesmustterminateaminimum
oftwelve(12)inchesabove
anticipated snowlevel.
Itcannotbe connectedtoexisting
ventpiping or chimney.
The total vertical and horizontal
runscannotexceed themaximum
lengthwithamaximumnumber of
90degreeelbowsasspeci edin
the table ofpage22.
Eternalcanbeventedstraight
up andahorizontalsectionisnot
required for vertical terminations.
□
□
□
□
!
HorizontalTermination
SideWall (DirectVent)
SideWall (ConcentricVent)
SideWall (Power Vent)
Belowdiagrams areexamplesofvertical terminations.
The Grand Hall approved
concentrickitisauniquepipe-
in-pipeventingsystemdesigned
for termination.Donottryto
replicateormakeyourown.For
more information,pleaserefer to
ConcentricVentKit sectionin the
Operation manual.
WARNING
!
Anopentee isoptionalbut
recommended touse as
atermination toalleviate
andprevent backpressure
intheventingsystem.
Foroptimalresultsthe
open teeshouldbe
positioned vertically.
□ □
□
WARNING
! !
Oncethe ventterminallocationhasbeen determined,makeahole
throughtheexterior wall toaccommodatethe ventpipe.Ventpipe must
onlyexitexterior wall horizontally.
Placethe 1/2"metalmeshscreeninside theterminal ttingandconnect
itas showntotheventpipeonthe exterior ofthe building.
Sealanyopeningaroundtheventpipeor ttingswithmortar or silicone
caulk"asshown" above.
Completetherestofthe ventpipe installation tothe water heater'svent
connector tting on theblower outlet.
Ifnecessarysupporthorizontal runas previouslymentioned.
□
□
□
□
Percode, waterheatersmustbe installed withasealedcombustion design soastoseparate the waterheater's
combustionandventingsystemfromtheinterioratmosphereofthemanufacturedhome.In accordancewithcode-water
heatersmust be directvented. Pleasereferto direct ventinginstructionsanddiagramsonpage 23-24.