
-Connect the two wheel rails (item 8) using the vertical rail (item 5) by putting
the screws M5 x8(item10) through the front and lower drilled holes and
securing with the nuts M5 (item 11). Use the countersunk screws M5 x12
(item 9) and the nuts M5 (item 11) through the rear drilled holes to secure.
-Align the bicycle wall mount in such away that the wheel rails are horizontal
and the vertical rail is vertical. Secure the bicycle holder with the dowels (item
7) and the cross-headed screws M4 x30 (item 6) to a suitable place on the
wall.
Caution: Do not damage any cables in the wall when drilling holes for the
dowels.
-Insert the adjustment skid (item 2) from above into the vertical rail, in doing so,
the slot for the fastening bolt (item 4) must be on the right side.
-Adjust the adjustment skid to a suitable height for your bicycle and insert the
fastening bolt through both metal plates of the vertical rail and through the slot
of the vertical skid.
-Push the fastening bolt down. The adjustable skid is now secured.
-Insert the bicycle frame holder (item 1) into the adjustable skid and secure
with the splint (item 3).
-Fold the frame holder down.
-Place the bicycle with the wheels in the wheel rails, the pedal close to the wall
must point upwards.
-Place the bicycle frame holder over the frame. The bicycle is now secured.