
QUICK START GUIDE
Factbird® DUO
Hardware setu with PLC cable
➀ Factbird® DUO
➁ Factbird® PLC cable ➂ Power supply unit
The indicator light starts blinking.
Place the ➀Factbird® DUO where it receives
good networks signals
Not inside the cabinet or metal box
Not under or between big machines
The indicator light on ➁Factbird® PLC cable
starts blinking once it receives signal.
1
2
Connecting wires and cables
Check the connection
Find a 24V output signal that is high for every part
produced and install the ➁ Factbird® PLC cable in
parallel. e.g. PLC termina of existing sensors for
counting parts produced.
Connect ➁Factbird® PLC cable to ➀Factbird®
Connect ➂power supply unit to ➀Factbird® and
plug into power.
factbird.com 3/4
c➀
➁
➂
e.g. to PLC terminals