
Page iii
2008T Calibration Procedures
P/N 508032 Rev. H
CALIBRATION PROCEDURES
TABLE OF CONTENTS
1.0 INTRODUCTION..................................................................................................... 1
1.1 TEST EQUIPMENT AND SUPPLIES NEEDED ........................................................................2
1.2 OPERATING MODES ...............................................................................................................3
1.3 FRONT PANEL CONTROLS ....................................................................................................6
1.4 MEASURING FLUID VOLUMES...............................................................................................8
1.5 CALIBRATE IF REPLACED......................................................................................................9
2.0 SERVICE MODE CALIBRATIONS ......................................................................... 10
2.1 TOUCH SCREEN CALIBRATION...........................................................................................10
2.2 HYDRAULIC CALIBRATION PROCEDURES........................................................................11
2.2.1 DEAERATION AND LOADING PRESSURE CALIBRATION ......................................................12
2.2.2 FLOW PRESSURE CALIBRATION.............................................................................................17
2.2.3 BALANCE CHAMBER VOLUME CALIBRATION........................................................................18
2.2.4 ACID (CONCENTRATE) PUMP VOLUME CALIBRATION .........................................................20
2.2.5 BICARBONATE PUMP VOLUME CALIBRATION.......................................................................22
2.2.6 UF PUMP VOLUME CALIBRATION............................................................................................24
2.3 SENSOR CALIBRATION PROCEDURES..............................................................................27
2.3.1 ARTERIAL PRESSURE CALIBRATION......................................................................................28
2.3.2 VENOUS PRESSURE CALIBRATION........................................................................................34
2.3.3 DIALYSATE PRESSURE CALIBRATION ...................................................................................37
2.3.4 TEMPERATURE SENSOR CALIBRATION.................................................................................39
2.3.5 POST TEMPERATURE SENSOR CALIBRATION......................................................................41
2.3.6 TEMPERATURE CONTROL CALIBRATION ..............................................................................43
2.3.6.1 TEMPERATURE CONTROL CALIBRATION (METHOD 1) ..........................................44
2.3.6.2 TEMPERATURE CONTROL CALIBRATION (METHOD 2) ..........................................47
2.3.7 BLOOD LEAK CALIBRATION.....................................................................................................50
2.3.8 CONDUCTIVITY CELLS CALIBRATION.....................................................................................52
2.3.8.1 DIALYSATE CELLS CALIBRATION .............................................................................53
2.3.8.2 BICARBONATE CONDUCTIVITY CELL CALIBRATION ..............................................55
2.3.8.3 CONDUCTIVITY CONFIRMATION CELL CALIBRATION ............................................56
2.4 MAINTENANCE CALIBRATION PROCEDURES...................................................................58
2.4.1 SET TIME & DATE......................................................................................................................59
2.4.2 VOLTAGE DETECTION CALIBRATION .....................................................................................60
2.4.3 ARTERIAL PUMP RATE .............................................................................................................63
2.4.4 VENOUS PUMP RATE................................................................................................................64
3.0 CALIBRATION PROCEDURES NOT PERFORMED IN SERVICE MODE ................. 65
3.1 INLET WATER PRESSURE REGULATOR CALIBRATION...................................................65
3.2 LEVEL DETECTOR CALIBRATION.......................................................................................67
3.3 BLOOD PUMP CALIBRATION...............................................................................................69