GEIGER Tablet User manual

Page 1
Revised 11/12/05
Side Tower
-
Overhead Combination
Installation of Side Tower-Overhead
Combination units is easy when the correct
SEQUENCE is followed.
Your unit consists of the following
components:
1. Right Hand Side Tower
2. Left Hand Tower
3. Center Overhead
4. Lower Back Panel
5. Task Light
6. Tack Board
7. Temporary Overhead Support Fillers (2)
Installation Sequence:
A. Carefully Place and position Towers on
the worksurface. Separate them by the
width of the center overhead.
B. Install the lower back between the 2 side
towers using the 4 L-brackets in the
supplied kit. The side towers and back are
pre-drilled to locate the brackets. The
brackets should be on the front face of the
back, and will be covered later by the
tackboards.
C. Apply the supplied felt strips on the
bottoms of the 2 temporary overhead
supports. Place them felt side down, against
the Right and Left Side Towers, and clamp
them in place.
D. Carefully rest Center Overhead on the
su
pp
orts, hold securel
y
while threadin
g
the
hardware between the cabinets.
E. Secure inter-cabinet hardware.
1
2
3
4
7
75
A,
B
C
D,E
Right ON SITE

Page 2
6
F. Install Tasklight using hardware provided.
G. Thread the cord from the tasklight through
hole the back rail under the overhead (if
provided) and into the wire management
channel in the tackboard.
I. Position the tackboard under the cabinet so
that a 1-1/2” inch gap exists between the
worksurface and the underside of the tackboard
and press firmly to engage the hook and loop
material.

Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
General Notes
These installation instructions are intended to be comprehensive for a typical Tablet, Petri or Eco
configuration. Your configuration may differ. If you have questions contact Geiger Customer
Service by dialing 1.800.456.6452.
As with all fine wood furniture, care should be taken not to scratch or dent the surfaces. Handle
the product as few times as possible. Keep related parts together, but do not stack or lean pieces
against each other. Never slide or drag furniture across the floor.
Product must be installed as shown using the screws and brackets provided. Use of incorrect
hardware could result in damage to the product.
Installation Tools
Pry bar
Tape measure
4 foot carpenters level
Cordless drill
#2 Phillips, #2 square tip,1/8” drill bits
Snips
Staple gun
Screws
Countersink Head #2 Square Tip
1.5” #50165 1” #50162
Page 1

Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
Getting Started
To begin the installation, start with the wall based furniture. Build out into the middle of the room,
taking care to level furniture to the highest spot in the floor.
Typical Rear Unit
Step 1 - Place floor units in their correct positions.
lan View
tep 2 - Remove all drawer boxes from storage units by following instructions outlined in “Drawer
tep 3 - Remove necessary mounting hooks from groove of electrical access panel.
tep 4 - Follow the instructions provided with the panel. Mount the PH-32 hooks on the side of
P
S
Removal and Installation" on the last page.
S
S
the storage cabinet so that the male/female connection is secure and the bottom of the panel is
flush with the bottom of the storage case.
Page 2

Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
PH-32
Hooks in
Groove
Step 5 - Ensure that storage cabinets are placed tightly together. Using a carpenter’s level,
ensure that the storage cabinets are level with each other and the support panels. The cabinet
leveler or foot nearest the highest spot in the floor should be screwed tightly into the cabinet to
minimize the overall height of the station.
IF THERE IS A FREESTANDING UPPER STORAGE CABINET, PROCEED IMMEDIATELY TO
THE INSTRUCTIONS PROVIDED WITH THE UPPER STORAGE CABINET, BEFORE
INSTALLING THE REAR UNIT WORKSURFACE.
If a Bridge Return with Panel has been ordered, it will be easier to install all of the worksurfaces
after the placement of Return and Desk panels. To attach Bridge panel, follow the following steps
of "Typical Bridge Return”. When completed, return to “Attaching the worksurfaces.”
Page 3

Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
Typical Bridge ReturnTypical Bridge Return
With Modesty PanelWith Modesty Panel
Step 1 -Remove one pair of PH-32 hooks from groove at end of Bridge Return modesty panel
(similar to electrical access panel on previous page).
Step 1 -Remove one pair of PH-32 hooks from groove at end of Bridge Return modesty panel
(similar to electrical access panel on previous page).
Step 2 - Install PH-32 hooks to the end of the Rear Unit end panel. Follow the directions provided
with the panel hardware: measure the correct height from the bottom of the Bridge Return
modesty panel when the brackets are tightly nested together. When the panel is installed, the
panel should be flush at worksurface and bottom, and fit tightly to the Rear Unit end panel.
Step 2 - Install PH-32 hooks to the end of the Rear Unit end panel. Follow the directions provided
with the panel hardware: measure the correct height from the bottom of the Bridge Return
modesty panel when the brackets are tightly nested together. When the panel is installed, the
panel should be flush at worksurface and bottom, and fit tightly to the Rear Unit end panel.
Step 3 - Attach the Bridge Return modesty panel to the Desk end panel in the same way.Step 3 - Attach the Bridge Return modesty panel to the Desk end panel in the same way.
Step 4 - Install Rear Unit worksurface (See “Attaching the Worksurfaces”). Install a pair of flat
brackets to the bottom of the Rear Unit worksurface, set in as shown from the front and rear
edges of the Bridge Return worksurface.
Step 4 - Install Rear Unit worksurface (See “Attaching the Worksurfaces”). Install a pair of flat
brackets to the bottom of the Rear Unit worksurface, set in as shown from the front and rear
edges of the Bridge Return worksurface.
Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
Page 4
Page 4

Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
Step 5 - Place the Desktop in position, careful to maintain the correct edge overhang (1/4”, 3/4” or
0”) over the drawer fronts on the user edge, depending on edge detail).
N
o Overhang
Step 6 - Install a pair of flat brackets to the bottom of the Desktop, set in from the front and rear
edges of the Bridge Return worksurface as shown on the prior page.
Step 7 - Place the Bridge Return worksurface on the brackets. Flush the back edge of the Return
worksurface to the end of the Rear Unit worksurface. Ensure a tight seam between the
worksurfaces.
Step 8 - Secure Return worksurface to Rear Unit flat brackets using the screws provided.
Step 9 – Align the back edge of Return worksurface and the end of the Desktop. Tighten seam
between Return worksurface and Desktop. And secure the worksurfaces with the screws
provided.
Step 10 - Square up all supporting modesty panels, so that worksurfaces are flush. Secure the
worksurfaces to the panels through the L-brackets on the support panels and to the storage
through the pre-drilled holes in the top rails of the storage cabinets (See “Attaching the
Worksurfaces”)
Step 11 - Reinstall drawer boxes as described in “Drawer Removal and Installation.”
Page 5

Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
Page 6
Attaching the Worksurfaces
Step 1 - Remove all visible tags and place the worksurface on top of the storage units and
support panels.
Step 2 - Align the worksurface flush with the back of the storage and the support panel. Center
the worksurface in the event that there is a small overhang.
Step 3 - Inside of the storage cabinet, drive the provided 1-1/2” screws through the predrilled
holes in the top pedestal rails and into the underside of the worksurface. Note: hold down
worksurface while securing to prevent movement.
Step 4 - Secure the support panels to the underside of the worksurface.
Step 5 - Fine-tune the leveling of the entire unit. Level floor units by starting with the unit nearest
the wall and work outward. Place carpenters level on worksurface of unit and examine leveling
from side to side. Adjust floor glides by turning them clockwise or counterclockwise as necessary.
Place level running from front to back of same unit and adjust glides accordingly. Repeat this step
for each unit. When cabinets are properly leveled, the cabinets should fit tightly together and
drawers and doors should be aligned vertically, without “Stair-stepping.” (Note: Proper leveling of
Rear Unit components will result in best performance of the electrical access panel, drawers and
locks.)
Front Elevation
NOTE: For a mobile runoff top, see separate ROS installation instructions included with top.

Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
Typical Desk
Step 1 - Attach Desk end panel to Return modesty panel, if provided, using the PH-32 hooks
found in the groove on the end of the Return panel. These hooks are mounted and oriented
exactly as on the Rear Unit end panel.
Step 2 - Attach the Desk modesty panel to the Desk end panel. Insert the modesty panel PH-32
hooks on the face of the Desk end panel into the groove on the end of the Return panel. Slide the
panels together side-to-side, and then down, until they are firmly locked together.
Step 3 - Place the Desk pedestal at the end of the modesty panel, very minimally set back at the
edge so that the back of the pedestal is not visible.
Set pedestal in from
end 1/32” (let panel
overhang), so back of
pedestal is not visible.
Step 4 - Level support panels and pedestal to the Rear Unit and Return modesty panels.
Step 5 - Remove pedestal drawers. See “Drawer Removal and Installation.”
Step 6 - Affix the modesty panel to the back of the pedestal, by driving screws through the back
of the rear support rails into the inside face of the modesty panel. Use two 1-1/2” screws at the
top and two 1-1/2” screws at the bottom.
Screw through back of
pedestal rails into modesty
panel.
Page 7

Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
Step 7 - Place the Desktop on the pedestal and support panel. Center the worksurface from side
tep 8 - Attach the Desktop to the top of the pedestal using the screws provided through the pre-
tep 9 - Replace drawers into correct storage cabinets (grain should be matched vertically). Refer
tep 10 - Re-check the Desk for level in both directions. Ensure that all the glides are touching
Step 11 - Install all Lock Plugs. Refer to Lock Plug Installation Instructions included with supplied
provided through the pre-
tep 9 - Replace drawers into correct storage cabinets (grain should be matched vertically). Refer
tep 10 - Re-check the Desk for level in both directions. Ensure that all the glides are touching
Step 11 - Install all Lock Plugs. Refer to Lock Plug Installation Instructions included with supplied
to side. Place the worksurface so that the correct ¼ , ¾” or 0” overhang is established over the
drawer fronts on the user side of the Desk.
N
o Overhang
S
drilled holes in the top rails of the pedestal.
drilled holes in the top rails of the pedestal.
SS
to “Drawer Removal and Installation.”
to “Drawer Removal and Installation.”
SS
the floor so that the unit is properly supported.
the floor so that the unit is properly supported.
Installation Key.
Installation Key.
Page 8

Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
Edge Overhang Information (Over fronts on user side)
.25” Overhang Edge Profiles .75” Edge Profiles
E06
E15
E07
E01
E20
E17
E03
E10
E16
T51
E02
E11
E14
No Overhang Edge Profiles
S50
T52
T53
T54
Finishing Touches
Remove all masking tape from underneath cabinet, back of drawers, etc.
Strip wire dividers, and install them in the holes provided in the bottom shelf of overhead
cabinet.
Wipe down furniture using a soft, damp cloth; always wipe with the grain direction. For greasy
finger marks, you may use a mild dishwashing soap diluted in warm water. Wipe out all debris
in cabinet (i.e. sawdust).
Do not use waxes, aerosol cleaners or abrasives as they may damage the finish.
Leave Care and Maintenance brochures supplied inside each top drawer.
Page 9

Tablet™ Petri™ Eco™
Right ON SITE Installation Principles
06.2.2004 ROSpegn.001
Page 10
Drawer Removal and Installation
Removal
Step 1 - Pull drawer completely open.
Step 2 - Reach over the back of the drawer box and grasp the bottom of the drawer box.
Step 3 - Firmly pull up on the bottom of the drawer box, unseating it from the drawer slide clips at
the rear of the drawer box.
Step 4 - Rotate the back of the drawer forward, until the drawer unseats itself from the drawer
slide clips at the front of the drawer box. If the drawer binds in the slide clips, lightly pull up on the
box.
Installation
Step 1 - Replace drawers into correct storage cabinets (grain should be matched vertically).
Step 2 - Extend the drawer slides fully.
Step 3 - Gently move slide around the lock clip and align metal clips on the sides of the drawer
box with the clips on the drawer slides.
Step 4 - Push the rear edges of the drawer down until the rear drawer clips snap down into the
drawer slide.
Step 5 - Push drawer half way into the cabinet (to eliminate stress on the drawer slides) and push
down firmly on the front edges of the drawer until the front clips snap completely into the drawer
slides.

Upper Storage Units
Right
ON SITE
Installation Principles
07.14.2009
59416
INSTALLATION TOOLS:
To install Geiger upper
storage units, you will need the following tools:
•Snips or scissors
•Screwdriver or power drill with screwdriver tip:
Square (Robertson) #2
•CTBK kits, consisting of two hinged brackets,
four 1” screws and four ¾” screws
GENERAL NOTES
:
Correct installation of Upper
Storage cabinets is important due to their weight and position
above the user. These installation instructions are intended to
be comprehensive. However, if you have additional questions,
contact Geiger Customer Service at 1.800.456.6452.
As with all fine wood furniture, care should be taken not to
scratch or dent the surfaces. Handle the product as few times as
possible. Keep related parts together, but do not stack or lean
pieces against each other.
Check plan view and elevation drawings to identify how many
units go in each area or office, and make sure you are clear on
how they are positioned or connected to each other. Never
slide or drag Upper Storage Units across the floor, as the end
panels may be damaged.
Product must be installed as shown using the screws and
brackets provided. Product must be installed with the back of
the unit adjacent to a wall. For free standing applications a
special bracket kit must be requested from the manufacturer.
Use of incorrect hardware could result in damage to the
product, or installation failure.
Top Thickness Part Number
1-3/16" H59398-1
1-1/2" H59398-2
2" H59398-3
Countersink Head #2 Square tip
1” 50162 ¾” 55044
FINISHING TOUCHES
•Remove all masking tape from underneath
cabinet, strip wire dividers, and install them in
the holes provided in the bottom shelf.
•Wipe out all debris in cabinet (i.e. sawdust).
•Wipe down furniture using a soft damp cloth;
always wipe with the grain direction. For
greasy finger marks you may use a mild
dishwashing soap diluted in warm water.
•Do not remove Care and Maintenance
brochures supplied inside each top drawer.
•Do not use waxes, aerosol cleaners or
abrasives as they may damage the finish.

Upper Storage Units
Right
ON SITE
Installation Principles
07.14.2009
59416
ATTACH SECURITY BRACKETS TO
WORKSURFACE
Security brackets are installed to prevent movement of the
Upper Storage Units.
STEP 1 – Trim the black plastic extrusion on the back modesty
panel, or on the back edge of the pedestal to make room for the
bracket. The bracket takes the place of the extrusion. The
extrusion should be trimmed from the end of the worksurface to
a point 2 ¼” from the end, or cut a 1 ¼” wide space from the
inside edge of the end panel, if the cabinet does not run from
one end of the worksurface to the other.
STEP 2 – Place the support panels or pedestals in their correct
position.
STEP 3 – Place the worksurface on the support panels.
Carefully slide the security bracket on to the back edge, in the
space where the black plastic extrusion has been removed. You
need a minimum of ¾” from the outside edge to clear the
thickness of the Upper Storage end panels. Leave the bracket
hinged to facilitate placement of the upper storage unit.
STEP 4 – Attach the security bracket to the underside of the
worksurface with the 1” countersink screws provided. DO
NOT OVER-TORQUE SCREWS; STIPPING MAY
RESULT. Note that in some instances the bracket will be
provided with a rubber spacer within the bracket for correct
location.
STEP 5 – Place the worksurface, aligning the back edge of the
worksurface flush to the back edge of the support panel, and
secure the top with the screws provided.
PLACE THE UPPER STORAGE UNIT
STEP 6 – THE SUPPLIED CLOSED CELL FOAM MUST
BE APPLIED TO THE FULL LENGTH OF THE END
PANEL TO PREVENT ROCKING OR PIVOTING. Cut
the closed cell foam to the length of the end panel. Peel off the
paper backing, exposing the adhesive side to the bottom edge of
the end panels.
STEP 7 – Carefully lift the Upper Storage Unit and place with
back of end panels to back of top.
STEP 8 – Hinge the bracket upward and remove the safety
bumper. Attach the security bracket to the inside face of the
cabinet back, using the ¾” countersink screws provided.
STEP 9 – Install the tackboards per instructions.
Step 1
Steps 2, 3, & 4
Steps 6 and 7
Steps 8 and 9
Step 5

Tablet™, Petri™ and Eco™ Casegoods
Right ON SITE Installation Principles
10.29.2004
GENERAL NOTES
These installation instructions are intended to be comprehensive for a typical Tablet, Petri or Eco configuration.
Your configuration may differ. If you have questions contact Geiger Customer Service by dialing
1.800.456.6452.
As with all fine wood furniture, care should be taken not to scratch or dent the surfaces. Handle the product as
few times as possible. Keep related parts together, but do not stack or lean pieces against each other. Never slide
or drag furniture across the floor.
Product must be installed as shown using the screws and brackets provided. Use of incorrect hardware could
result in damage to the product.
INSTALLATION TOOLS SCREWS
Pry bar Countersink Head #2 Square Tip
Tape measure
4 foot carpenters level
Cordless drill
#2 Phillips, #2 square tip,1/8” drill bits
Snips
Staple gun
1.5” #50165 1” #50162
Page 1

Tablet™, Petri™ and Eco™ Casegoods
Right ON SITE Installation Principles
10.29.2004
GETTING STARTED
To begin the installation, start with the wall based furniture. Build out into the middle of the room, taking care
to level furniture to the highest spot in the floor.
TYPICAL REAR UNIT
Step 1 - Place floor units in their correct positions.
Plan View
Step 2 - Remove all drawer boxes from storage units by following instructions outlined in “Drawer Removal and
Installation" on the last page.
Step 3 - Remove necessary mounting hooks from groove of electrical access panel.
Step 4 - Follow the instructions provided with the panel. Mount the PH-32 hooks on the side of the storage
cabinet so that the male/female connection is secure and the bottom of the panel is flush with the bottom of the
storage case.
Step 5 - Ensure that storage cabinets are placed tightly together. Using a carpenter’s level, ensure that the storage
cabinets are level with each other and the support panels. The cabinet leveler or foot nearest the highest spot in
the floor should be screwed tightly into the cabinet to minimize the overall height of the station.
Page 2

ON SITE
004
Tablet™, Petri™ and Eco™ Casegoods
Right Installation Principles
10.29.2
Page 3
PH-32
Hooks in
Groove
IF THERE IS A FREESTANDING UPPER STORAGE CABINET, PROCEED IMMEDIATELY TO THE
INSTRUCTIONS PROVIDED WITH THE UPPER STORAGE CABINET, BEFORE INSTALLING THE
REAR UNIT WORKSURFACE.
If a Bridge Return with Panel has been ordered, it will be easier to install all of the worksurfaces after the
placement of Return and Desk panels. To attach Bridge panel, follow the following steps of "Typical Bridge
Return”. When completed, return to “Attaching the worksurfaces.”

Tablet™, Petri™ and Eco™ Casegoods
Right ON SITE Installation Principles
10.29.2004
TYPICAL BRIDGE RETURN
With Modesty Panel
Step 1 -Remove one pair of PH-32 hooks from groove at end of Bridge Return modesty panel (similar to
electrical access panel on previous page).
Step 2 - Install PH-32 hooks to the end of the Rear Unit end panel. Follow the directions provided with the panel
hardware: measure the correct height from the bottom of the Bridge Return modesty panel when the brackets
are tightly nested together. When the panel is installed, the panel should be flush at worksurface and bottom,
and fit tightly to the Rear Unit end panel.
Step 3 - Attach the Bridge Return modesty panel to the Desk end panel in the same way.
Step 4 - Install Rear Unit worksurface (See “Attaching the Worksurfaces”). Install a pair of flat brackets to the
bottom of the Rear Unit worksurface, set in as shown from the front and rear edges of the Bridge Return
worksurface.
Page 4

Tablet™, Petri™ and Eco™ Casegoods
Right ON SITE Installation Principles
10.29.2004
Step 5 - Place the Desktop in position, careful to maintain the correct edge overhang (1/4”, 3/4” or 0”) over the
drawer fronts on the user edge, depending on edge detail).
N
o Overhang
Step 6 - Install a pair of flat brackets to the bottom of the Desktop, set in from the front and rear edges of the
Bridge Return worksurface as shown on the prior page.
Step 7 - Place the Bridge Return worksurface on the brackets. Flush the back edge of the Return worksurface to
the end of the Rear Unit worksurface. Ensure a tight seam between the worksurfaces.
Step 8 - Secure Return worksurface to Rear Unit flat brackets using the screws provided.
Step 9 – Align the back edge of Return worksurface and the end of the Desktop. Tighten seam between Return
worksurface and Desktop. And secure the worksurfaces with the screws provided.
Step 10 - Square up all supporting modesty panels, so that worksurfaces are flush. Secure the worksurfaces to
the panels through the L-brackets on the support panels and to the storage through the pre-drilled holes in the
top rails of the storage cabinets (See “Attaching the Worksurfaces”)
Step 11 - Reinstall drawer boxes as described in “Drawer Removal and Installation.”
Page 5

Tablet™, Petri™ and Eco™ Casegoods
Right ON SITE Installation Principles
10.29.2004
ATTACHING THE WORKSURFACE
Step 1 - Remove all visible tags and place the worksurface on top of the storage units and support panels.
Step 2 - Align the worksurface flush with the back of the storage and the support panel. Center the worksurface
in the event that there is a small overhang.
Step 3 - Inside of the storage cabinet, drive the provided 1-1/2” screws through the predrilled holes in the top
pedestal rails and into the underside of the worksurface. Note: hold down worksurface while securing to prevent
movement.
Step 4 - Secure the support panels to the underside of the worksurface.
Step 5 - Fine-tune the leveling of the entire unit. Level floor units by starting with the unit nearest the wall and
work outward. Place carpenters level on worksurface of unit and examine leveling from side to side. Adjust floor
glides by turning them clockwise or counterclockwise as necessary. Place level running from front to back of
same unit and adjust glides accordingly. Repeat this step for each unit. When cabinets are properly leveled, the
cabinets should fit tightly together and drawers and doors should be aligned vertically, without “Stair-stepping.”
(Note: Proper leveling of Rear Unit components will result in best performance of the electrical access panel,
drawers and locks.)
Front Elevation
NOTE: For a mobile runoff top, see separate ROS installation instructions included with top.
Page 6
This manual suits for next models
2
Table of contents
Other GEIGER Indoor Furnishing manuals
Popular Indoor Furnishing manuals by other brands

Fitwood
Fitwood LUOTO STOOL owner's manual

dobue MOVELARIA
dobue MOVELARIA Martinelli 300892 Assembly instruction

Dongsuh
Dongsuh MOMO DB026 Assembly instructions

Furniture of America
Furniture of America CM-BK611 Assembly instructions

Living Spaces
Living Spaces 3002A RSFST Assembly instructions

SLIGH
SLIGH 9601 installation instructions