
Test 7 – Testing The Stator With A Vom
(12-20 kW)...........................................44
Test 8 – Test Brushless Stator..........................45
Test 9 – Check Capacitor.................................46
Test 10 – Test DPE Winding on
Brushless units....................................47
Test 11 – Resistance Check Of Rotor Circuit
(12-20 kW)...........................................48
Test 12 – Check Brushes And Slip Rings
(12-20 kW)...........................................48
Test 13 – Test Rotor Assembly(12-20 kW).......49
Test 14 – Check AC Output Frequency............49
Test 15 – Check and Adjust Engine Governor
(Single Cylinder Units).........................49
Test 16 – Check Stepper Motor Control
(V-twin Engine Units)...........................50
Test 17 – Check And Adjust Voltage
Regulator (12-20 kW)..........................51
Test 18 – Check Voltage And Frequency
Under Load..........................................52
Test 19 –Check For Overload Condition...........52
Test 20 – Check Engine Condition...................52
Test 21 – Field Flash Alternator (8-10 kW) ......52
PART 3 -TRANSFER SWITCH...............................55
3.1 Description and Components.......................... 56
General............................................................56
Enclosure.........................................................56
Transfer Mechanism.........................................57
Transfer Relay..................................................57
Neutral Lug ......................................................58
Manual Transfer Handle ..................................58
Terminal Block .................................................58
Fuse Holder .....................................................59
3.2 Operational Analysis ....................................... 60
Operational Analysis........................................60
Utility Source Voltage Available .......................62
Utility Source Voltage Failure ..........................63
Transfer To Standby .........................................64
Transfer To Standby .........................................65
Utility Restored.................................................66
Utility Restored, Transfer Switch De-energized ...67
Utility Restored, Retransfer Back To Utility.......68
Transfer Switch In Utility...................................69
3.3 – Troubleshooting Flowcharts..........................70
Introduction To Troubleshooting .......................70
Problem 7 – In Automatic Mode,
No Transfer to Standby................................70
Problem 8 – In Automatic Mode, Generator
Starts When Loss of Utility Occurs,
Generator Shuts Down When Utility
Returns But There Is No Retransfer To Utility
Power / or Generator Transfers to Standby
During Exercise Or In Manual Mode............71
Problem 9 – Blown F1 or F2 Fuse...............71
Problem 10 – Units Starts And Transfer
Occurs When Utility Power Is On.................72
Problem 11 – No Battery Charge
(Pre-Packed Load Center)...........................73
Problem 12 – No Battery Charge
(RTSN & RTSE Transfer Switch) .................73
Problem 13 – No Battery Charge
(Gen-Ready Load Center)...........................73
Problem 14 – No Battery Charge
(Load Shed Transfer Switch)........................73
3.4 Diagnostic Tests .............................................. 74
General............................................................74
Test 26 – Check Voltage at
Terminal Lugs E1, E2..........................74
Test 27 – Check ManualTransfer Switch
Operation.............................................75
Test 28 – Check 23 And 15B
Wiring/Connections.............................76
Test 29 – Test Transfer Relay TR......................77
Test 30 – Standby Control Circuit ....................78
Test 31 – Check Wire 23..................................78
Test 32 – Utility Control Circuit.........................80
Test 33 – Test Limit Switch SW2 and SW3......82
Test 34 – Check Fuses F1 and F2...................82
Test 35 – Check N1 and N2 Wiring..................83
Test 36 – Check N1 and N2 Voltage ................83
Test 37 – Check Utility Sensing Voltage
at the Circuit Board..............................84
Test 38 – Check Utility Sense Voltage .............84
Test 39 – Check Voltage at
Terminal Lugs N1, N2..........................84
Test 40 – Check Battery Charger Supply
Voltage “Pre-Wire Load Center”..........86
Test 41 – Check Battery Charger Output
Voltage “Pre-Wire Load Center”..........86
Test 42 – Check Wire 0 and Wire15B
“Pre-Wire Load Center”.......................86
Test 43 – Check Battery Charger
Supply Voltage
“RTSN & RTSE Transfer Switch”.........87
Test 44 – Check Battery Charger
Output Voltage
“RTSN & RTSE Transfer Switch”.........87
Test 45 – Check Wire 0/
“RTSN & RTSE Transfer Switch”........87
Test 46 – Check Battery Charger
Supply Voltage
“GenReady Load Center”....................90
Test 47 – Check Battery Charger
Output Voltage
“GenReady Load Center”....................90
Test 48 – Check Wire 0/15B
“GenReady Load Center”....................90
Test 49 – Check Battery Charger
Supply Voltage
“Load Shed Transfer Switch”...............92
Test 50 – Check Battery Charger
Output Voltage
“Load Shed Transfer Switch”...............92
Test 51 – Check Wire 0 and Wire 15B
“Load Shed Transfer Switch”...............94
Page 2