Green Power Tesseract 5K14 User manual

Installation Manual
Tesseract 5K14
Integrated Home Battery Storage System
Version 1.0

Publisher
GreenPower Investment Pty Ltd
Notice of copyright
Tesseract 5K14 Integrated Home Battery Storage Unit installation manual
©2019 by GreenPower Investment Pty Ltd. All Rights Reserved.
Date and version
February 2020, Version 1.0

Contents
About This Document.....................................................................................................5
1Safety Precautions..................................................................................................6
General Safety...............................................................................................6
Disclaimer......................................................................................................6
Personnel Requirements...............................................................................7
Protect Labels................................................................................................7
Installation......................................................................................................7
Electrical Connections...................................................................................8
Operation.......................................................................................................9
Maintenance and Replacement.....................................................................9
2Product Overview..................................................................................................10
Product Introduction ....................................................................................10
Appearance .................................................................................................11
Label Descriptions.......................................................................................13
3Storage ...................................................................................................................15
4System Installation................................................................................................16
Pre-Installation Check .................................................................................16
Tools and Instruments.................................................................................16
Determining the Installation Position...........................................................18
Installing the Mounting Bracket ...................................................................19
Wall-Mounted Installation ............................................................................20
Installing the Tesseract 5K14......................................................................21
4.6.1 Battery Box Installation....................................................................22
4.6.2 Main Control Installation..................................................................23
5Electrical Connections..........................................................................................25
Preparing Cables.........................................................................................25
Installing the Battery Box Cable ..................................................................28
Installing the Main Control Box....................................................................30
5.3.1 Installing the DC Input Power Cable ...............................................31
5.3.2 Installing the AC Input/Output Power Cable (Grid) .........................33
5.3.3 Installing the EPS Cable..................................................................34
5.3.4 Installing the PE Cable....................................................................35
Installing the Cable between the Main Control Box and Battery Box..........36
6System Commissioning........................................................................................39
Checking before Powering On.....................................................................39
Powering on the System..............................................................................40
Powering Off the System.............................................................................41
7Handling the Tesseract 5K14 .................................................................................3
Removing the Tesseract 5K14......................................................................3
Packing the Tesseract 5K14..........................................................................3
Disposing of the Tesseract 5K14...................................................................3

8Technical Specifications ........................................................................................4
DC Input.........................................................................................................4
AC Output......................................................................................................4
Internal Charger.............................................................................................5
Efficiency .......................................................................................................5
General Data .................................................................................................5
Dimensions....................................................................................................5

About This Document
Purpose
This document describes the Tesseract 5K14 Integrated Home Battery
Storage Unit in terms of its installation, electrical connections,
commissioning, maintenance, and troubleshooting. Before installing and
operating the Tesseract 5K14, ensure that you are familiar with the
features, functions, and safety precautions provided in this document.
Intended Audience
This document is intended for:
•Installers
•Users
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol
Description
Indicates an imminently hazardous situation which, if not avoided, will result in
serious injury or death.
Indicates a potentially hazardous situation which, if not avoided, could result in
serious injury or death.
Indicates a potentially hazardous situation which, if not avoided, may result in minor
or moderate injury.
Indicates a potentially hazardous situation which, if not avoided, could result in
equipment damage, data loss, performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to personal injury.
Calls attention to important information, best practices and tips.
NOTE is used to address information not related to personal injury, equipment
damage, or environment deterioration.
Change History
Changes between document issues are cumulative. The latest document
issue contains all updates made in previous issues.
Version 1.0 (2020-02-15)
This issue is used for first office application (FOA).

1 Safety Precautions
General Safety
Before performing operations, read through this manual and follow all the
precautions to prevent accidents. The "DANGER", "WARNING",
"CAUTION", and "NOTICE" marks in this document do not represent all
the safety instructions. They are only supplements to the safety
instructions.
Only certified electricians are allowed to install, connect cables for,
commission, maintain, and troubleshoot GreenPower products, and they
must understand basic safety precautions to avoid hazards.
When operating GreenPower equipment, in addition to following the
general precautions in this document, follow the specific safety
instructions given by GreenPower. GreenPower will not be liable for any
consequence caused by the violation of the safety operation regulations
and design, production, and usage standards.
Disclaimer
GreenPower shall not be liable for any consequence caused by any of
the following events:
•Transportation damage.
•The storage conditions do not meet the requirements specified in
this document.
•Incorrect storage, installation or use.
•Installation or use by unqualified personnel.
•Failure to obey the operation instructions and safety precautions in
this document.
•Operation in extreme environments which are not covered in this
document.
•Operation beyond specified ranges.
•Unauthorised modifications to the product or software code or
removal of the product.
•Device damage due to force majeure (such as lightning, earthquake,
fire or storm).
•The warranty expires and the warranty service is not extended.
•Installation or use in environments which are not specified in related
international standards.

Personnel Requirements
Only certified electricians are allowed to install, connect cables for,
commission, maintain, troubleshoot, and replace the Tesseract 5K14.
•Operation personnel should receive professional training.
•Operation personnel should read through this document and follow
all the precautions.
•Operation personnel should be familiar with the safety specifications
about the electrical system.
•Operation personnel should understand the composition and
working principles of the grid-tied PV system and local regulations.
•Operation personnel must wear proper personal protective
equipment (PPE).
Protect Labels
•Do not scrawl or damage any labels on the Tesseract 5K14
enclosure because these labels contain important information about
safe operation.
•Do not scrawl or damage the nameplate on the Tesseract 5K14
enclosure because it contains important product information.
Installation
Never operate the Tesseract 5K14 under power during installation.
•Ensure that the Tesseract 5K14 is not connected to a power supply
or powered on before finishing installation.
•To allow proper heat dissipation and installation, maintain
appropriate clearances between the Tesseract 5K14 and other
objects, as shown in Figure 1-1. If you have any questions about the
clearances, consult your local technical support engineers.

Figure 1-1 Installation space
•Ensure that the Tesseract 5K14 is installed in a well-ventilated
environment.
•Ensure that the Tesseract 5K14 heat sinks are free from blockage.
•Do not open the front panel of the Tesseract 5K14.
•Do not remove the terminals and ports at the bottom of the
Tesseract 5K14.
Electrical Connections
Before connecting cables, ensure that the Tesseract 5K14 is secured in position and
not damaged in any way. Otherwise, electric shocks or fire may occur.
•Ensure that all electrical connections comply with local electrical
standards.
•Obtain approval from the local utility company before using the
Tesseract 5K14 to generate electricity in grid-tied mode.
•Ensure that the cables used in a grid-tied PV system are properly
connected and insulated, and meet all specification requirements.

Operation
High voltage may cause an electric shock, which results in serious injury, death, or
serious property damage from the Tesseract 5K14 in operation. Strictly comply with
the safety precautions in this document and associated documents when operating
the Tesseract 5K14.
•When the Tesseract 5K14 is powered on for the first time, only
certified electricians are allowed to perform quick setting. Incorrect
settings may affect normal operation of the Tesseract 5K14 and
cause it to conflict with the country certification.
•When the Tesseract 5K14 is operating, do not disconnect under
load.
•Do not touch an energised Tesseract 5K14 because the heat sink
has a high temperature.
•Follow local laws and regulations when operating the equipment.
Maintenance and Replacement
High voltage may cause an electric shock, which results in serious injury, death, or
serious property damage from the Tesseract 5K14 in operation. Prior to maintenance,
power off the Tesseract 5K14 and strictly comply with the safety precautions in this
document and associated documents to operate the Tesseract 5K14.
•Maintain the Tesseract 5K14 with sufficient knowledge of this
document, proper tools, and testing equipment.
•Before performing maintenance tasks, power off the Tesseract 5K14
and wait at least 5 minutes.
•Temporary warning signs or fences must be placed to prevent
unauthorized people from entering the site.
•If the Tesseract 5K14 is faulty, contact your supplier.
•The Tesseract 5K14 can be powered on only after all faults are
rectified. Failing to do so may escalate faults or damage the device.
•Observe ESD precautions and wear ESD gloves during
maintenance.

2 Product Overview
Product Introduction
Function
The Tesseract 5K14 is a single-phase grid-connected PV string inverter
and energy storage system. It can store the DC power generated by the
PV string into the battery, or convert the DC power generated by the PV
string or the stored energy of the battery into AC power. Power is input to
the grid.
Networking Application
The Tesseract 5K14 applies to a residential rooftop grid-tied system.
Typically, a grid-tied system consists of the PV string, grid-tied inverter,
AC switch, and power distribution unit.
Figure 2-1 Network diagram
indicates a power cable
indicates the power flow direction
indicates a signal cable
A. PV string
B. DC switch
C. Tesseract 5K14
D. AC switch
E. Residential power distribution unit
F. Energy meter
G. Residential power meter
H. Power grid
I. Residential load

Supported Power Grid
Power grid types supported by the Tesseract 5K14 include TN-S, TN-C,
TN-C-S, and TT. In a TT power grid, the N-PE voltage should be lower
than 30 V.
Figure 2-2 Power grid types
Appearance
Front View
1. LED 1
2. LED 2
3. LED 3
4. LED 4
5. Front panel
Table 2-3 LED descriptions
Type
Name
Status
Meaning

Maintenance
indicator
Red
BHSS failure or maintenance
required
Solar
indicator
Orange
Solar equipment working
Grid
indicator
Green
Feeding energy to the grid
Orange
Absorbing energy from the grid
Off
Grid off
Battery
indicator
Green (steady)
Battery charging
Orange
Battery discharging
Green (blinking)
Waking up
Rear View
Figure 2-4 Rear view
1. Main control box mounting bracket
2. Battery box mounting bracket
3. Heat sink

Dimensions
Figure 2-5 Enclosure dimensions
Figure 2-6 Main control box mounting bracket dimensions
Figure 2-7 Battery box mounting bracket dimensions
Label Descriptions
Symbols
Symbol
Name
Meaning
Burn warning
Do not touch a running Tesseract
5K14 because the shell is hot

when the Tesseract 5K14 is
running.
Delay discharge
•High voltage exists after the
Tesseract 5K14 is powered
on. Only qualified and trained
electrical technicians are
allowed to perform operations
on the Tesseract 5K14.
•Residual voltage exists after
the Tesseract 5K14 is
powered off. It takes 5
minutes for the Tesseract
5K14 to discharge to the safe
voltage.
Refer to
documentation
Reminds operators to refer to the
documents shipped with the
Tesseract 5K14.
Grounding
Indicates the position for
connecting the protective earthing
(PE) cable.
Operation
warning
Do not remove the connector or
antennawhen the Tesseract 5K14
is running.
SN label
Indicates the Tesseract 5K14
serial number.
The labels are for reference only.

3 Storage
The following requirements should be met when the Tesseract 5K14
needs to be stored prior to installation:
•Do not unpack the Tesseract 5K14.
•Keep the storage temperature at -40°C to +70°C and the humidity at
5%–95% RH.
•The Tesseract 5K14 should be stored in a clean and dry place, and
be protected from dust and water vapour corrosion.
•A maximum of two Tesseract 5K14s can be stacked. To avoid
personal injury or device damage, stack Tesseract 5K14s with
caution to prevent them from falling over.
•Regular inspection is required during the storage. Replace the
packing materials when necessary.
•After long-term storage, an inspection and test conducted by
qualified persons are necessary before the Tesseract 5K14 is put
into use.

4 System Installation
Pre-Installation Check
Outer Packing Materials
Before unpacking the Tesseract 5K14, check the outer packing materials
for damage, such as holes and cracks, and check the Tesseract 5K14
model. If any damage is found or the Tesseract 5K14 model is not what
you requested, do not unpack the package and contact your supplier as
soon as possible.
You are advised to remove the packing materials within 24 hours before installing the
Tesseract 5K14.
Package Contents
After unpacking the Tesseract 5K14, check that the contents are intact
and complete. If any damage is found or any component is missing,
contact your supplier.
For details about the number of contents, refer to the Packing List in the packing case.
Tools and Instruments
Category
Tools & Instruments
Installation
Hammer drill (with a
Ф10 mm drill bit)
Torque socket
wrench (open end: 13
mm, applicable forM8
bolts; torque range:
0–15 N•m)
Torque wrench (open
end: 13 mm; torque
range: 0–1.5N•m)
Diagonal pliers
Wire stripper
Torque screwdriver
(head: M4 or M6;
torque range: 0–5
N•m)

Category
Tools & Instruments
Rubber mallet
Utility knife
Cable cutter
Crimping tool (model:
H4TC0001;
manufacturer:
Amphenol)
Open-end wrench
(model: H4TW0001;
manufacturer:
Amphenol)
Cable tie
Vacuum cleaner
Multimeter (DC
voltage measurement
range ≥ 600 V DC)
Marker
Measuring tape
Bubble or digital level
Hydraulic pliers
Heat shrink tubing
Heat gun
PPE
Safety gloves
Safety goggles
Anti-dust respirator
Safety shoes

Determining the Installation Position
Basic Requirements
•The Tesseract 5K14 is protected to IP54 and can be installed
indoors or outdoors.
•Do not install the Tesseract 5K14 in a place where a person can be
easy to come into contact with its enclosure and heat sinks, because
these parts are extremely hot during operation.
•Do not install the Tesseract 5K14 in areas with flammable or
explosive materials.
•Do not install the Tesseract 5K14 in a place within reach of children.
•The Tesseract 5K14 will be corroded in salt areas, and the salt
corrosion may cause fire. Do not install the Tesseract 5K14 outdoors
in salt areas. A salt area refers to the region within 500 metres from
the coast or prone to sea breeze. The regions prone to sea breeze
vary depending on weather conditions (such as typhoons and
monsoons) or terrains (such as dams and hills).
Installation Environment Requirements
•The Tesseract 5K14 must be installed in a well-ventilated
environment to ensure good heat dissipation.
•When installed under direct sunlight, performance de-rate may be
initiated due to additional temperature rise.
•Install the Tesseract 5K14 in a sheltered place or install an awning
over the Tesseract 5K14.
Mounting Structure Requirements
•The mounting structure where the Tesseract 5K14 is installed must
be fireproof.
•Do not install the Tesseract 5K14 on flammable building materials.
•Ensure that the installation surface is solid enough to bear the
weight load.
•In residential areas, do not install the Tesseract 5K14 on drywalls or
walls made of similar materials which have a weak sound insulation
performance because the noise generated by the Tesseract 5K14 is
noticeable.
Installation Angle Requirements
The Tesseract 5K14 only can be wall-mounted. The installation angle
requirements are shown in Figure 4-1.
•Install the Tesseract 5K14 vertically.
•Do not install the Tesseract 5K14 at forward-tilted, back-tilted, side-
tilted, horizontal, or upside-down positions.

Figure 4-1 Installation angle
Installing the Mounting Bracket
There are four mounting brackets, which are installed through the
mounting brackets provided with the product.
Figure 4-2 Opening position plate

Wall-Mounted Installation
Procedure
Step 1 Use the hole positioning plate to confirm the position of the hole. Use a
bubble or digital level to adjust the position of the mounting holes and
mark the position with a marker.
Figure 4-3 Determining hole positions
Step 2 Install the expansion bolts.
Avoid drilling holes in the utility pipes and/or cables attached to back of the wall.
If the length or number of M8x80 expansion bolts supplied with the Tesseract 5K14 is
not enough, prepare M8 stainless steel expansion anchor bolts.
Table of contents
Popular Audio & Video Accessories manuals by other brands

Panasonic
Panasonic DMP-BD60 - Blu-Ray Disc Player installation manual

mind alive
mind alive Smart Operator's manual

Eurotronic
Eurotronic Genius BLE100 Installation & operation guide

Embertec
Embertec Emberplug EPUSAV-ET-01 Instruction booklet

evertz
evertz EMX3-FR user manual

TiGHT AV
TiGHT AV EDU-H201AUC-KIT user manual