
Rating 12V, Bulk limited voltage : 14.7V
Current-ripple:<= 0.13Arms
3.3A for GC60-12A, 2.0Afor GC60-12AS
Natural convection. Do not cover the charger.
Auto 4 stages: Ud-Im-Uo-Up
All types of 12V lead-acid batteries.( SLA, Gel, AGM….)
7-80Ah for GC60-12A, 4~40Ah for GC60-12AS
IP54 (Dust protected, Water splashing resistance)
Brief Introduction
GC60-12A is based on switchmode technology, which make it them more efficient and
smaller, and with microprocessor controlled to make it very accurate. It is programmed
smart 4-stage (Ud-Im-Uo-Up) charging process, It is designed for all kinds of 12V
7~80Ah lead-acid battery, such as SLA, AGM and Gel battery. Stage “Ud”
desulfurating the battery through 18V pulse, When the battery recovered, stage “Im”
will give bulk current charging( 3.3A or 2.0A). Then, “Uo” stage is followed, the output
voltage is limited on 14.7V; When the battery is nearly full, stage”Up” will turn on duty.
At this stage, the battery is charged completely and the charger give some pulse to
maintenance the battery.
What’s more, it can display the charging process, indicate the battery capacity from
25% to 100% timely. This is helpful for user.
For more safety, it will enable protection mode when the battery polarity reversed or
the output connectors shorted.
Display Panel
Power on
(When AC
input OK)
Charging process indicator:
Indicate battery capacity from 25% to
100% when charging.
All lamps flashing means battery
polarity reversed or output shorted.
All lamps are “off”means no battery.
When this LED lamp is “on”and
other 3 lamps are “off”, this
means the charger enter the
recover(desulfurating)process.
Specs for GC60-12A How to use:
1.
Connect the AC cord to the socket, The “power” lamp will light on RED.
2.
Connect positive charger clip (red) to positive battery terminal, the black clip
to negative. (You can use other dc plugs to connect battery), the
“25%~100%” lamps will light on flowing. If the battery polarity reversed or
output shorted, all lamps will flashing, please check the setup.
3.
Depend on the charged capacity, 25%~100% lamps will lights up solid
sequence, until the battery is fully charged. Then you can power off the
charger and disconnect the battery or you can charge a new battery if you
need.
The table shows the duration of the Bulk stepup to about 80% state of charge.