
6
13
11 8
109 1
2
12
5
4
7
3
IV. Adjusting the height (see Fig. 1):
1-Loosen the cables (13) using the quick tighteners (see NM181).
2-Slightly lift the upright (3) to remove the attachments (9) +(10) at the bottom of the uprights (3).
3-Raise or lower the uprights (3) until the bar is at the desired height.
4- Install the attachment elements (9) +(10) at the bottom of the uprights (3) into the hole of the sliding
tubes (1) corresponding to the desired height Moderately lock the attachment elements (9) + (10).
Important: Check that both sliding tubes (1) are adjusted to the same height - this is mandatory.
5-Retighten the cables (13).
V. Adjustment values (see Fig. 2):
Ring height: 1st hole = 2.60 m 2nd hole = 2.65 m 3rd hole = 2.70 m
4th hole = 2.75 m 5th hole (F.I.G.): = 2.80 m 6th hole = 2.85 m
7th hole = 2.90 m 8th hole = 2.95 m
VI. Maintenance:
1-A regular cleaning of the apparatus allows better viewing of the problems, if any (distortion, breakage, or corrosion).
2-Before use, check wear parts and safety elements each time for good condition and operation:
-pads (2),
-all the bracing cable elements (cables, tighteners, quick links locked, etc.).
-complete rings (6): cables (no shreded), straps (no cut seams), and swivel pins (tightened). We recommend to
change them regularly as required by usage frequency (at least every 3 years).
3-Check the tightening of cables (13) and closure of quick links, ... (see NM181), before each use.
4- Check the correct tightening of all attachment elements (9) + (10) + (11) and the locking of anchors.
5-Important:
-If a problem is detected or suspected, do not use the equipment as long as it has not been checked by a technician.
-Any damaged or distorted piece should be replaced as soon as possible.
V. Storage:
Always store the equipment away from humidity and heat.
I. Preparing the cables:
Refer to the Assembly Instructions NM181.
II. Assembling the apparatus (minimum of six people required)
(see Fig. 1):
Note: Prepare a clean area for assembling the apparatus.
1-Lay both lower uprights (3) parallel on the floor.
2-Fit the upper uprights (4) onto the lower uprights (3).
3-Fit the frame head (5),on each side, onto the lower upright (3) +
upper upright (4) assemblies.
4- Install the rings (6) on the frame head (5): insert each swivel pin
screw (8) through the frame head (5), firmly tighten the nuts (11).
5-In order to obtain the 2.80 m prescribed height for the rings (6)
with regard to the floor, install the attachment elements
(9) +(10) at the bottom of uprights (3) into the 5th hole
of the sliding tubes (1).
Moderately lock the attachment elements (9) +(10).
6-Install the pivots (12) into their housings on the floor
(if required), in line with the plotting.
III. Assembling, adjusting and tightening the cables:
Important: When the vertical position of the frame is adjusted, and before tightening the cables (13), do not forget to lock
all the attachment elements on floor.
Refer to the Assembly Instructions NM181.
NM9j - Page 2
Figure 1
Figure 2
2.80 m
Mat
Floor