Design and technique
Product description
Gyptone BIG is a gypsum based acoustic ceiling
with high design value since no joints are visible.
The ceiling can be used for many applications like
schools, oces and commercial settings. Gyptone
BIG is screw mounted and non-demountable. The
product is subject to full recycling as raw material
for new plaster boards.
Gyptone BIG is available with perforated and
non-perforated surface. Thickness is 12.5 mm
and the format is 1200 x 2400 mm and
900 x 2700 mm.
Surfaces
The plasterboard surface is subject to paint
treatment after installation. Treatment is to
be executed with a roller as spray painting will
impair the acoustic performance. Joints are to
be filled, sanded and painted, c.f. page 3.
Plenum height
Minimum and maximum plenum heights with GK
system in one level is to be found on page 7.
Fire resistance
A2-s1, d0.
Loading
Maximum point load is 3 kg. If higher loading is
needed the intallations are to be fixed to the slab
above with dedicated suspensions.
Stability
Gyptone BIG system is to be installed and used
in rooms with relative humidity not exceeding
permanently 70% or temperatures exceeding
45 degrees celcius. Gyptone BIG can be curved
(dry) to minimum 6 meters radius if installed on
preshaped framing.
Weight
Gyptone BIG Base = 9 kg/m2
Other Gyptone BIG products = 8 kg/m2
Cleaning
Can be cleaned with a damp cloth depending
on the final surface treatment. Do not use
detergents.
Maintenance
Damages on edges or surfaces can be repaired
by filling and painting.
Accessories
For inspection above install Gyptone Access
Panels into Gyptone BIG Boards. Find more
information in installation manual for Gyptone
Access Panel.
BIG™
Installation manual

Fix the GK-C edge profile to adjacent surface with
appropriate fixing not exceeding cc distance of 400
mm. Carefully use the general specification material
of the project as well as this manual.
Conduct a survey of the room. Carefully plan for
positioning of metal framing, ceiling boards and
a potential perimeter. Mark and fix suspension
straps with appropriate fixings. Use 2 pcs of clips in
connecting GK 27 and GK 26-27.
Slide the GK main profile into the GK-C edge profile.
Raise the main profile and twist the straps into place.
Ajudst all main profiles into level.
Slide the connector GK 21 into the GK 2 cross profile
and click into position between main profiles. 2 clicks
must be heard at each connection, when clicking the
Cross Profile onto the main profile. Otherwise the
Cross Profile will not make a strong connection with
the main profile.
Gyptone BIG – Installation manual 2
First suspension strap is to be positioned maximum
900 mm from the wall. Main profiles GK 1 positioned
maximum 1200 mm from wall. Cross profiles placed
with a maximum cc distance of 600 mm between GK
1 main profiles and maximum 600 mm from the wall.
Install the Gyptone BIG Boards by using appropriate
lifting equipment and fixing to metal framing with
QSTR25 screw. Please note that all joints of boards
must be supported by the metal framing. Ensure
alignment of the perforation of the boards and keep
the boards firmly pressed to the overhead metal
framing when screw fixing.
600 mm
900 mm
Max.
1200 mm
1200 mm
Installation of metal framing (GK/CD system) and Gyptone BIG ceiling boards.
Prior to installation it is recommended to read the manual thoroughly.
C
E
A B
D
F
BIG™
Installation manual

Use a QSTR 25 screw when mounting Gyptone BIG
Boards. Distance from screw to corner is 50 mm and
from screw to edge 15 mm. Distance cc between
screws 200 mm. C.f. page 6 for additional positioning
of fixings.
All board joints are to be jointed with adequate filler.
Apply first a layer of Gyproc ProMix Joint or the like
in the tapered section. Subsequently adding a paper
reinforcement in the wet filler. Light sanding (grain
100-200) when cured. Apply a layer of filler Gyproc
ProMix Finish or the like. Light sanding when cured
until level with board.
Painting of Gyptone BIG is to be done with a short
haired mohair roller to avoid excessive paint into
perforation. Spray painting is not to be used as paint
will impair the acoustic tissue thus degrading the
acoustic properties. Gyptone BIG is to be primed and
painted twice.
Filling of screw heads with Gyproc ProMix Finish or
the like in two rounds finished by a light sanding until
level. Tip: Use a piece of plastic wiht a circular hole as
a mould.
50 mm
15 mm
Finishing
G
I
H
J
Gyptone BIG – Installation manual 3
Installation of metal framing (GK/CD system) and Gyptone BIG ceiling boards.
Prior to installation it is recommended to read the manual thoroughly.
BIG™
Installation manual

27
60
28
27
48
Screw type
QSTR 25
Installation of
Gyptone edge B1 on
metal framing
Estimated consumption suspended installation of GK(CD) system
When installing in environment with high humidigy (i.e. RH = 70%)
cc distancing of maximum 400 mm is recommended.
27
60
Main profile GK 1
L: 4000 mm
1
Cross profile GK 2
L: 1135 mm
Perimeter channel
GK-C
L: 3000 mm
Connector GK 20
4
Connector GK
5
Suspension Strap
GK 26-27 – base
including 2 pcs.
clips
6a
Suspension Strap
GK 26-25
6b
Suspension Strap
GK 27 – top
Lenght: 135/200/
300/500/1000 mm
7
Suspension Wire
GK 25
8
1
6
4
Article Designation Dimension mm Lenght mm CC mm Consumpition/m²
1 Main profile GK 1 27 x 60 4000 900 0.9 m
2 Cross profile GK 2 27 x 60 1135 600* 1.7 m
3 Perimeter channel GK-C 28 x 47 3000 - By measurement
4 Connector GK 20 - - 4000 0.2 pcs.
5 Connector GK 21 - - 600 2.8 pcs.
6a Suspension Strap GK 26-27 - - 900 1.0 pcs.
6b Suspension Strap GK 26-25 - - 900 1.0 pcs.
7 Suspension Strap DK 27-150 ect. - - 900 1.0 pcs.
8 Suspension Wire GK 25-250 ect. - - 900 1.0 pcs.
Gyptone BIG – Installation manual 4
Tapered edge
Plan of
Metal frames
1200 x 2400 mm
3
2
3
2
5
BIG™
Installation manual

Screw type
QSTR 25
Installation of
Gyptone edge B1 on
metal framing
Estimated consumption suspended installation of GK(CD) system
27
60
28
27
48
When installing in environment with high humidigy (i.e. RH = 70%)
cc distancing of maximum 300 mm is recommended.
1
27
60
Main profile GK 1
L: 4000 mm
1
Cross profile GK 2
L: 835 mm
2
Perimeter channel
GK-C
L: 3000 mm
3
Connector GK 20
4
Connector GK 21
5
Suspension Strap
GK 26-27 – base
including 2 pcs.
clips
6a
Suspension Strap
GK 26-25
6b
Suspension Strap
GK 27 – top
Lenght: 135/200/
300/500/1000 mm
7
Suspension Wire
GK 25
8
2
3
56
4
Article Designation Dimension mm Lenght mm CC mm Consumpition/m²
1 Main profile GK 1 27 x 60 4000 900 1.1 m
2 Cross profile GK 2 27 x 60 835 450* 2.2 m
3 Perimeter channel GK-C 28 x 47 3000 - By measurement
4 Connector GK 20 - - 4000 0.2 pcs.
5 Connector GK 21 - - 600 2.8 pcs.
6a Suspension Strap GK 26-27 - - 900 1.0 pcs.
6b Suspension Strap GK 26-25 - - 900 1.0 pcs.
7 Suspension Strap DK 27-150 ect. - - 900 1.0 pcs.
8 Suspension Wire GK 25-250 ect. - - 900 1.0 pcs.
Gyptone BIG – Installation manual 5
Plan of
Metal frames
900 x 2700 mm
Tapered edge
BIG™
Installation manual

GK/CD system. Main profiles per cc distance 1200
mm and cross profiles per cc distance 600 mm
GK/CD system. Main profiles per cc distance 900
mm and cross profiles per cc distance 450 mm
200
50
15
200
200
300
300
50
15
200
15
200
12
50
12
200
300
12
GK/CD system. Main profiles per cc distance 900 mm and cross profiles per cc distance 450 mm
GK/CD system. Main profiles per cc distance 1200 mm and cross profiles per cc distance 600 mm
200
50
15
200
200
300
300
50
15
200
15
200
12
50
12
200
300
12
Gyptone BIG – Installation manual 6
Positioning of screws for edge B1 for 1200x2400 mm and 900x2700 mm Gyptone BIG.
Use screw type QSTR25
BIG™
Installation manual

Heights are measured from under slab to overside of plaster board.
Fixing to slab/plenum is not considered.
GK 26-27 suspension with
strap GK 27
GK 24 direct fixing
GK 26-25 suspension with
wire GK 25
GK 28 suspension
GK 23 suspension
GK-system in 1 level
Gyptone BIG – Installation manual 7
Items
GK26-27 + GK27 150 mm Min. height 140 mm Max. height 180 mm
GK26-27 + GK27 190 mm Min. height 140 mm Max. height 220 mm
GK26-27 + GK27 290 mm Min. height 240 mm Max. height 320 mm
GK26-27 + GK27 490 mm Min. height 440 mm Max. height 520 mm
GK26-27 + GK27 990 mm Min. height 940 mm Max. height 1020 mm
GK26-27 + GK27 1035 mm Min. height 985 mm Max. height 1065 mm
GK26-27 + GK27 1135 mm Min. height 1085 mm Max. height 1165 mm
GK26-25 + GK25 125 mm Min. height 125 mm Max. height 200 mm
GK26-25 + GK25 250 mm Min. height 250 mm Max. height 325 mm
GK26-25 + GK25 375 mm Min. height 375 mm Max. height 450 mm
GK26-25 + GK25 500 mm Min. height 500 mm Max. height 575 mm
GK26-25 + GK25 750 mm Min. height 750 mm Max. height 825 mm
GK26-25 + GK25 1000 mm Min. height 1000 mm Max. height 1075 mm
GK23 Min. height 55 mm Max. height 110 mm
GK24 Min. height 30 mm Max. height 30 mm
GK28 100 mm Min. height 100 mm Max. height 100 mm
GK28 200 mm Min. height 200 mm Max. height 200 mm
BIG™
Installation manual

Board support
100 % level support
Full contact prior to screw fixing
NB: By sliding the board risk of rolling of tissue occur
which will result in levelling problems by installation.
Gyptone BIG Boards are to be lifted vertically of the stack
Positioning of screws
50 mm
15 mm
Gyptone BIG – Installation manual 8
BIG™
Installation manual
Good advice

Check list for installing metal grid and Gyptone BIG Ceiling Boards.
Prior to installation it is recommended to read the manual thoroughly.
ISO and OHSAS
Gyproc A/S has a quality management system, which is
certified by BVQI Denmark A/A according to the demands
in ISO 9001, 14001 and OHSAS 18001
Humidity in room not to exceed
70% during installation or usage.
Only usage of Gyproc GK
System or similar as metal
framing.
Fix edge profile GK-C with
maximum screw distance of
400 mm.
Survey the room and position
the straps according to this
manual and the general
specification of the project.
Slide GK 1 main profiles into
GK-C edge profile and twist the
straps into position.
Adjust all GK 1 main profiles
into level
Fill all joints and screw heads
with adequate filler system in
accordance with this manual.
Subsequently sand until level.
Finished surfaces to be primed
and painted twice.
Have expansion joints in
accordance with the project
speification been installed?
Check positioning of screws
on page 6.
Gyptone Xtensiv – Installation manual 9
Kalundborg DK, August 2018
Gyproc reserves the right to modify data without prior notice.
If required please contact Gyproc technical department
Saint-Gobain Denmark A/S
Gyproc, Hareskovvej 12
4400 Kalundborg, Denmark
Tel. : +45 5957 0330
Fax: +45 5957 0331
www.gyptone.com
Saint-Gobain Denmark A/S
Gyproc, Hareskovvej 12
4400 Kalundborg, Denmark
Tel. : +45 5957 0330
Fax: +45 5957 0331
www.gyptone.com
BIG™
Installation manual
Table of contents