i
Contents
1 Inspecting the router at delivery·······························································1-1
2 Preparing for installation··········································································2-1
Determining the installation personnel············································································································2-1
Installation site requirements ··························································································································2-1
Equipment room requirements················································································································2-1
Grounding requirements ·························································································································2-1
Space requirements································································································································2-1
Cooling requirements······························································································································2-3
Safety recommendations ································································································································2-4
Safety symbols········································································································································2-4
General safety recommendations···········································································································2-4
ESD prevention·······································································································································2-5
Moving the chassis··········································································································································2-5
Physical specifications····························································································································2-5
Moving the chassis··································································································································2-6
Preparing installation tools······························································································································2-7
3 Installation flowchart················································································3-1
4 Rack-mounting the router ········································································4-1
Attaching slide rails to the rack ·······················································································································4-1
Mounting the router in a rack ··························································································································4-1
5 Grounding the router················································································5-1
6 Installing power supplies··········································································6-1
Installing DC power supplies···························································································································6-1
Available DC power supplies ··················································································································6-1
DC power supply configuration guidelines······························································································6-1
Installing a DC power supply···················································································································6-1
Connecting a DC power cord··················································································································6-3
Installing AC power supplies···························································································································6-5
Available AC power supplies···················································································································6-5
AC power supply configuration guidelines······························································································6-5
Installing an AC power supply·················································································································6-5
Connecting an AC power cord················································································································6-7
7 Installing modules····················································································7-1
Slot arrangement·············································································································································7-1
Installing MPUs···············································································································································7-1
Installing interface modules·····························································································································7-2
Installing an interface module that uses detachable ejector levers·························································7-3
Installing an interface module that uses general ejector levers ······························································7-5
Installing interface subcards····························································································································7-6
8 Installing cable management brackets·····················································8-1
9 Installing fabric modules ··········································································9-1
Installing a fabric module ································································································································9-1
Installing a filler panel in a fabric module slot··································································································9-2
10 Installing fan trays················································································10-1
11 Connecting signal cables·····································································11-1
Installing transceiver modules and optical fibers···························································································11-1
Connecting cables to E1 ports······················································································································11-3