Hogfors BLUE Series Manual

BLUE LINE
SILVER LINE
INSTALLATION AND MAINTENANCE MANUAL
BALL VALVES
01-03-2011
BALL VALVE
Series: 32000TR-N, 32500TR-N, 34000TR-N, 34200TR-N,
34300TR-N, 34500TR-N, 35000TR-N, 35200TR-N,
35300TR-N, 35500TR-N, 36000TR-N, 36500TR-N,
39000TR-N, 39200TR-N, 39300TR-N, 39500TR-N,
440TS-N, 442TS-N, 443TS-N, 445TS-N, 467TS-N,
468TS-N.
INSTRUCTION FOR INSTALLATION, USE AND MAINTENANCE
ление
1. Overview
Read these instructions carefully before starting the valve installation and start-up work. Safe keep the
instructions in the proximity of the valve for easy access by the valve operators.
HÖGFORS OY takes no responsibility for any damage caused by the valve’s incorrect
transportation, handling, installation or use.
The warranty covers defects in workmanship or material.
HÖGFORS OY grants a one-year warranty on all of its products, but the warranty is at most two (2)
years from the delivery of product.
In order to obtain warranty compensation, the defective product shall be sent to manufacturer or
presented to manufacturer’s representative at site for investigation.
More detail warranty obligations see Orgalime S 2000.
2. Factors to be considered prior to installation and commissioning.
During the receiving inspection, check that the valve and its accessories are free from any
transportation-induced damage. During storage the valve must be exposed to dirt, rain, prolonged
sunshine or sub-zero temperatures.
Always make sure before installation that the valve is suitable for the medium.
−Steel valves can be used in district heating (not with steam), heat piping, oil piping and with
oxygen-free water.
−Stainless steel materials are suitable for use in process piping and compressed air lines, with
acids, bases, raw water and oxygen-rich water, i.e. in applications that require good corrosion
resistance.
3. Installation.
The valve or actuator operation is not limited by the direction of flow or the position in which the unit is
fitted. The valve should not be fitted at the lowest point of the pipework or in over low-level locations.
The pipework should be carefully cleaned before the valve is fitted. Remove any foreign matter that
may have got into the valve during transportation or storing.
Test the proper operation by opening and shutting the valve.

BLUE LINE
SILVER LINE
INSTALLATION AND MAINTENANCE MANUAL
BALL VALVES
01-03-2011
Högfors recommend the use of electric welding methods. If gas welding cannot be avoided, always
cool the valve with wet rags during welding, and do not gas weld valves size >DN125.
Make sure the chamfering of the piping is suitable for welding of the valve.
Do not remove the protective covers of the connections until just before installation.
Welding to be performed by a qualified welder.
The valve shall be completely open when
welded into horizontal piping. When welding the valve into vertical piping,
the valve shall be open when the upper
seam is welded.
If the valve is closed when the upper seam
is welded, it must be filled with water. In gas welding the valve shall be closed
when welding the bottom seam.
Excessive heating of the valve must be avoided during the welding. The valve must be cooled down
using e.g. a damp cloth, cooling paste etc. Resume work using shorter welding times.
It is recommended that the handle be removed from the valve for installation.

BLUE LINE
SILVER LINE
INSTALLATION AND MAINTENANCE MANUAL
BALL VALVES
01-03-2011
Do not turn the ball until the valve is completely cooled after welding. After installation, flush out the
pipework through, and leave the valve either fully open or fully closed.
During designing and construction of valve elements, uncontrolled thermal expansion of the pipeline
media has to be prevented.
3.1 Pressure test
- Perform a pressure test at 1.1 x PN with the valve connected into the network and in closed position.
Perform a pressure test at 1.5 x PN with the valve completely or partly open. Check the valve against
leaks.
3.2 Valve support
- Typically support methods used with piping are employed. With valves smaller than DN 50 no special
supports are needed, but for valves larger than DN 50 local support instructions shall be complied with.
4. Operation
A valve designed for use as a shut-off valve may only be used in the open/closed position.
Avoid unnecessarily fast closing of the valve due to pressure shocks. For larger sizes ( DN 150), a
by-pass valve is recommended.
In applications where the valve remains in the same position for most of the time, it can be opened or
closed a few times during the year to avoid seizing of the valve.
In exceptionally corrosive applications, special protection of the valve body and connections should be
employed.
If the valve is the only pressure-bearing component at the end of the line, the valve must be plugged
with a flange, plug or by some corresponding means.
The valves can be operated using the handle or an actuator.
5. Maintenance
The valves require no maintenance in normal conditions. However, the O rings on the stem can be
replaced, if needed.
5.1 Replacement of O rings on the stem
−DN15 – 50 (full opening DN10-40) the top O-ring can be replaced. Detailed instructions are
given in the replacement instructions of O-rings.
−DN65 (full opening DN50) – DN150 and DN300 the top two O-rings can be replaced. DN200
and DN200 the top O-ring can be replaced. Detailed instructions are given in the replacement
instructions of O-rings.
5.2 The valve shall be depressurized for maintenance, if it is not disconnected from the line.
5.3 The valve shall be in closed position for the replacement of O-rings.
5.4 The valve must be depressurized before it is removed from the piping.
5.5 Protective gear shall be worn when replacing O-rings.
5.6 Do not open the valve until all the required components have been replaced.

BLUE LINE
SILVER LINE
INSTALLATION AND MAINTENANCE MANUAL
BALL VALVES
01-03-2011
6. Exploded view and standard materials
7.
13
2
1
6
357
8
10
9
414
12
11
Part Material *
340 DN10-500 340 DN600 440
1 Body Carbon steel P235GH Carbon steel W1.0345 Stainless steel 1.4404
2 Stem housing Carbon steel P355NH Carbon steel W1.0425 Stainless steel 1.4404
3 Ball Stainless steel 1.4301
Stainless steel W1.4301 Stainless steel 1.4404
4 Stem Stainless steel 1.4305 Stainless steel W1.4460 Stainless steel 1.4404
5 Seal Teflon PTFE+C
6 Bevel washer Spring steel Steel Stainless steel 1.4404
7 Support ring Stainless steel Steel Stainless steel 1.4404
8 Screw Steel Stainless steel
9 O-ring FPM EPDM FPM
10 Thrust washer Teflon PTFE
11 Stop Stainless steel 1.4016 / 1.4404 Stainless steel1.4404
12 Handle Zinc-plated steel Stainless steel (DN10-50)
Zinc-plated steel (DN65-250)
13 End pipe Carbon steel P235GH Carbon steel ASTM GWCC
Stainless steel 1.4404
14 Bushing Stainless steel 1.4305
*Materials can vary in different series. See separate Product card for detail.
This manual suits for next models
23
Other Hogfors Control Unit manuals
Popular Control Unit manuals by other brands

Wöhner
Wöhner CRITO CrossBoard Mounting instructions

Singer Valve
Singer Valve 106-PG-BPC Installation, operating and maintenance instructions

Camozzi
Camozzi F Series Use and Maintenance Instruction

tellus
tellus S103 installation guide

Akurat lighting
Akurat lighting W-DMX user guide

Advntage Controls
Advntage Controls ABC Instructions for use

Atlas Copco
Atlas Copco POWER FOCUS 6000 Product instructions

Mitsubishi Electric
Mitsubishi Electric NZ2GN2S1-32D user manual

Advent Controls
Advent Controls A4.02 manual

REMKO
REMKO GSG-4 Operation Technology

White Rodgers
White Rodgers 8J48A installation instructions

aiko
aiko MAH72Dw Series installation manual