HP EliteBook x360 830 G5 Assembly instructions

EL-MF877-00 Page 1
Template Revision C
Last revalidation date 09-May-2018
HPI instructions for this template are available at EL-MF877-01
Product End-of-Life Disassembly Instructions
Product Category: Notebooks and Tablet PCs
Marketing Name / Model
[List multiple models if applicable.]
HP EliteBook x360 830 G7 Notebook PC
HP EliteBook x360 830 G7
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the
disassembly of HPI products to remove components and materials requiring selective treatment, as defined by EU directive
2012/19/EC, Waste Electrical and Electronic Equipment (WEEE).
NOTE: Recyclers should sort plastic materials into resin streams for recycling based on the ISO 11469 plastic marking code on the
plastic part. For any questions on plastic marking, please contact HP’s Sustainability Contact.
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.
Item Description Notes
Quantity of
items
included in
product
Printed Circuit Boards (PCB) or Printed Circuit
Assemblies (PCA)
With a surface greater than 10 sq cm
2
Batteries, excluding Li-Ion batteries.
All types including standard alkaline, coin or button style
batteries
Li-Ion batteries. Include all Li-Ion batteries if more than
one is provided with the product (such as a detachable
notebook keyboard battery, RTC coin cell, etc.)
Battery(ies) are attached to the product by (check all
that apply with an “x” inside the “[ ]”):
[x] screws
[x] snaps
[ ] adhesive
[ ] other. Explain
NOTE: Add detailed removal procedures including
required tools in the sections 3.1 and 3.2.
2 (Main
battery and
RTC battery)
Mercury-containing components
For example, mercury in lamps, display backlights,
scanner lamps, switches, batteries
Liquid Crystal Displays (LCD) with a surface greater than
100 sq cm
Includes background illuminated displays with gas
discharge lamps
1
Cathode Ray Tubes (CRT)
Capacitors / condensers (Containing PCB/PCT)
Electrolytic Capacitors / Condensers measuring greater
than 2.5 cm in diameter or height
External electrical cables and cords
DC Cable for External Power Supply
Gas Discharge Lamps
Plastics containing Brominated Flame Retardants

EL-MF877-00 Page 2
Template Revision C
Last revalidation date 09-May-2018
HPI instructions for this template are available at EL-MF877-01
Item Description Notes
Quantity of
items
included in
product
weighing > 25 grams (not including PCBs or PCAs
already listed as a separate item above)
Components and parts containing toner and ink,
including liquids, semi-liquids (gel/paste) and toner
Include the cartridges, print heads, tubes, vent
chambers, and service stations.
Components and waste containing asbestos
Components, parts and materials containing refractory
ceramic fibers
Components, parts and materials containing
radioactive substances
2.0 Tools Required
List the type and size of the tools that would typically be used to disassemble the product to a point where components and
materials requiring selective treatment can be removed.
Tool Description
Tool Size (if
applicable)
#1 screwdriver
Electric cross
screwdriver
T5 screwdriver
Electric cross
screwdriver
3.0 Product Disassembly Process
3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment
including the required steps to remove the external enclosure:
1. Follow steps described in Disassembly instruction (file attached)
2. If parts can be removed without using a tool, remove it first
3. Use correct screwdriver and torque value before unlock the screw.
4.
5.
6.
7.

EL-MF877-00 Page 3
Template Revision C
Last revalidation date 09-May-2018
HPI instructions for this template are available at EL-MF877-01
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items contained in the
product that require selective treatment (with descriptions and arrows identifying locations).

Prepared by::
Checked by:Yang jsaon Yi qiu-ling
Sta. Ver. Sta. Ver. Sta. Ver. Sta. Ver. Sta. Ver. Sta. Ver.
1 1.00 9 1.00 17 1.00
2 1.00 10 1.00 18 1.00
3 1.00 11 1.00 19 1.00
4 1.00 12 1.00 20 1.00
5 1.00 13 1.00 21 1.00
6 1.00 14 1.00 22 1.00
7 1.00 15 1.00 23 1.00
8 1.00 16 1.00 24 1.00
Sta. Ver.
ALL 1.**
2020/3/21
initial
Zhao neil
A.Current station version list:
B.Version Modify list:
Date
Content
Design
Written by:
Yi qiu-ling
Date:
2020/3/21
Page:
1 of 25
Sub-assembly name:
Oleander Disassemble SOP
Document No.:
Oleander Disassemble SOP
Revision:
1.00
MANUFACTURING PROCESS INSTRUCTIONS
MECHANICAL ASSEMBLY
MODEL : Oleander

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
1(1/1)
1. Loosen Base screw *5pcs as below
picture showing
❖Torque:2.5 ±0.2 kgf.cm
❖screw can not be slipped.
2. Disassembly Base
❖Pull down the back shell to the side of
the sky after the left and right side of the
card is removed
Disassembly Base 1.00 2020/3/21
Picture 1
5
12
4
3
Screw driver(T5)1

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
2(1/1)
1. Disassemble battery CNTR(picture 1)
2. Disassemble SSD Shielding
Can(6053B1743801) (picture 2)
❖pull shielding can remove the handle is on
the right
Disassembly SSD Shielding Can 1.00 2020/3/21
Picture 1
Picture 2

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
3(1/1)
1. Disassemble DDR Shielding
Can(6053B1744001) (picture1)
❖pull shielding can the right handle lift
unloading
2. Take DDR(picture 2)
1.00 2020/3/21
Disassemble DDR
Picture 1
Picture 2

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
4(1/1)
1. Hold the Camera Cable handle,and
unplug the CNTR(picture1)
2. Hold the LCM Cable handle,and unplug
the CNTR (picture2)
Disassemble LCM&camera CNTR 1.00 2020/3/21
picture1
picture2

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
5(1/1)
1. Unplug all antenna CNTR on WWAN
card and tie the antenna out of the
antenna slot(picture1)
Disassemble WWAN antenna 1.00 2020/3/21
picture1
picture2
NO.6
antenna
NO.5an
tenna
No.7
antenna
NO.号
antenna

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
6(1/1)
1. Remove the 7 and 8 antennas from the
I/O frame and speaker(picture)
Remove the 7and8 antennas 1.00 2020/3/21
picture1

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
7(1/1)
1. Remove the aluminum foil of no.7and8
antenna from the battery
2. Remove the antenna from the top
Disassemble WWAN 7and8 1.00 2020/3/21
WNC 6036B0250101
AUX2
6036B0250001
AUX3
AWAN 6036B0252101
AUX2
6036B0251201
AUX3
HONG-BO 6036B0252001
AUX2
6036B0252601
AUX3
AUX3
AUX2
picture1
picture3
picture2
picture4

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
8(1/1)
1. Disassemble screw
M2.0*4.0(6052B0081901)*4(picture2)
❖Torque:1.5 ±0.2 kgf.cm
❖screw can not be slipped.
2. Disassemble battery(picture2)
Disassemble battery 1.00 2020/3/21
picture1
1
2
3
4
picture2
Screw driver(#1)1

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
9(1/1)
1. Remove WLAN CNTR,and find out
from the fan hook(picture1)
Disassemble WLAN antenna 1.00 2020/3/21
picture1

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
10(1/1)
1. Open CNTR,remove Click Pad FFC
(picture1)
2. Open CNTR,remove Smart card FFC
(picture1)
3. Open CNTR,remove Backlight FFC
(picture3)
4. Open CNTR,remove KB Membrane
(picture2)
Remove FFC 1.00 2020/3/21
picture1
picture2
picture3

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
11(1/1)
1. Open CNTR,and take out Finger print
FFC(picture1)
2. Open CNTR,and take out NFC CNTR(
picture2)
3. Tear the small battery from the top of
part C and exit the line from the hook(
picture1)
Disassemble small battery 1.00 2020/3/21
picture1
picture2
Line FFC down
to MB

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
Remove NFC
1. Take the NFC group down
12(1/1)
picture1
Module
天線軟板
1.00 2020/3/21
picture2

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
13(1/1)
1. Will hinge up to 270 degrees
2. Remove screw
M2.0*5.0(6052A0003501)*6 (picture1)
❖Torque:2.5 ±0.2 kgf.cm
❖screw can not be slipped.
Disassemble Hinge up
图一
1.00 2020/3/21
Screw driver(#1)1

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
14(1/1)
1. Disassemble
screwM2.0*2.0(6052B0388301)*3
❖Torque:1.5 ±0.2 kgf.cm
❖screw can not be slipped.
2.Remove SSD/WLAN /WWAN
Module(picture1)
Disassemble SSD & WLAN&WWAN 1.00 2020/3/21
图一
WLAN
WWAN
SSD
Screw driver(#1)1

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
15(1/1)
1. Remove screw
M2.0*4.0(6052B0081901)*4
(picture1)
❖Torque:1.5 ±0.2 kgf.cm
❖screw can not be slipped.
2. Remove USB Bracket (6053B1746501)
Disassemble USB Bracket 1.00 2020/3/21
图一
Screw driver(#1)1

Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared :Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty Symbol
Issued:IE department
Safe Order Hear Look Do Static
Qual
ity
Fixtur
e
16(1/1)
1. Remove screw
M2.0*4.0(6052B0081901)*5
(图一)
❖Torque:1.5 ±0.2 kgf.cm
❖screw can not be slipped.
2. Remove IO Frame(6051B1360601)
Disassemble IO Frame 1.00 2020/3/21
picture1
Screw driver(#1)1
Other manuals for EliteBook x360 830 G5
4
Other HP Laptop manuals

HP
HP mt45 Manual

HP
HP PAVILION DM3 Manual

HP
HP Compaq nc2400 User instructions

HP
HP Compaq 6520s Manual

HP
HP Presario CQ58-100 User manual

HP
HP ProBook 5330m Manual

HP
HP Pavilion CRVSA-02T1-75 User manual

HP
HP Pavilion g6-1100 Manual

HP
HP Compaq Presario User manual

HP
HP Pavilion DV1010 Mounting instructions

HP
HP EliteBook 2170p User instructions

HP
HP ProBook 6465b Manual

HP
HP Spectre 13 Pro Series User manual

HP
HP Compaq Presario CQ72 Assembly instructions

HP
HP Pavilion HDX9000 User manual

HP
HP Envy 15 Assembly instructions

HP
HP ENVY m4-1000 User manual

HP
HP Compaq Presario User manual

HP
HP Spectre Manual

HP
HP Pavilion 14 Manual