HySecurity HYNET SFP 4/1 User manual

Installation Manual
for HyNet Attachment Bracket Kit: MX3866
SwingSmart DC 20 and SwingSmart DCS 20
SlideSmart DC 15 and SlideSmart DCS 15
SlideSmart DC 10F and SlideSmart DCS 10F
This document is a supplemental document that provides specic information regarding
conguration of the HySecurity gate operator with installation and wiring of the HyNet Gateway.
For safety considerations and information specic to your gate operator, refer to the HySecurity
gate operator product manuals.

HyNet Components
Drawing is not to scale
Height
1¼ inches
SFP Module
(100/1000/2500)
Managed Switch
RJ-45 Integration Hub
4-Port Copper Gigabit
(100/1000/2500)
Micro USB
Reset Button
RS-485
USB OTG
Micro SD Card Slot
Mounting Plate
4 x 7½ inches
LED (position 1)
Table 1: HyNet LED Indicators
LED Position LED Color Indicates
1RED ashing No communication from gate operator to HyNet.
1Green steady Communication is established between gate operator and HyNet.
2RED steady Gate operator network communication is not congured or established.
2RED ashing HyNet is attempting to connect to network (web interface).
2GREEN ashing Network (web interface) is established and working. (May not be wholly
congured, yet. Verify conguration with your IT administration.)
3RED steady Hardware fault.
3RED ashing Charge is low on coin battery. Replace coin battery.
3GREEN steady Hardware functioning and coin battery charged.
4Red steady or no LED lit HyNet internal switch is not functioning.
4GREEN steady HyNet internal switch is functioning.
4321
LED Indicators

HyNet Rain Shield
Attachment Bracket
HyNet Mounting Plate
SwingSmart DC and SlideSmart DC
HyNet Assembly with Attachment Bracket
Tools Required
•Phillips head screwdriver

Mount HyNet to SwingSmart DC and
SwingSmart DCS
Remove covers
1
2Thread bracket
screw into chassis.
3Place screw into
slotted mounting
hole on bracket.
4Secure HyNet assembly to chassis.
Insert second screw through bracket
and tighten.
5Connect wiring.
See page 6.
Tools Required
•Phillips head screwdriver
6Replace and secure
covers.

Mount HyNet to SlideSmart DC and
SlideSmart DCS
Service Outlet
115VAC, 15A
2Thread bracket
screw into chassis.
3Place screw into
slotted mounting
hole on bracket.
4Secure HyNet assembly to
chassis. Insert second screw
through bracket and tighten.
5Connect wiring.
See page 6.
Remove cover
1
Tools Required
•Phillips head screwdriver
6Replace cover and
secure gate operator.

Wiring the HyNet Gateway
COM
COM
COM
COM
COM
COM
COM
COM
STOP
OPEN
RADIO
CLOSE
OPEN
OPEN
PARTIAL
SENSOR 2
EXIT
LOOP
BLOCK
EXIT
IN OBS
LOOP
OUTOBS
LOOP
CENTER
LOOP
COM
+ 24 V
EMERG
OPEN
SHOW
LEDs
R
ADI
O
O
P
T
I
O
NS
E
D
G
E
+24
V
O
P
E
N
C
O
M
DU
A
L G
A
T
E
COM
B
A
U
S
ER
2
C
O
MN
O
DC
COMMON
TERMINALS
24VDC
24VDC
12VDC
12VDC
24VDC
24VDC
24VAC
24VAC
12VDC
12VDC
SENSOR 3
SENSOR 1
SENSOR
Pin 1,
COM
Installer supplied shielded
cable
NOTE: More detailed
wiring information is
shipped with the HyNet.
NOTE: The Smart DC Controller pin layout changed a
few years ago. On controllers with part numbers
marked MX001457 and MX3037 Revisions A, B, and C,
be sure you're connecting the ying lead to the +24V
spade located under RADIO OPTIONS.
R
A
D
I
O
O
P
T
ION
S
E
D
G
E+
2
4
VOP
E
N
COM
DU
A
L GATE
COM
B
A
U
S
E
R2
COM
N
O
D
C
Drawing is not to scale.
Attach shielded
cable to wire
harness.*
*Measure distance
between HyNet and
Controller connections
for appropriate
shielded cable length.
2
1Attach to RS-485
port on HyNet.
3Connect to RS-485
port on Smart DC
Controller.
4
Connect ying
lead to +24V.
Optional +24VDC
if RADIO OPTIONS
+24V is occupied
Wire harness
(supplied in box)
5Supply
RJ-45 network
connection
HyNet
RS-485 port
Pin 1, +24V
Smart DC Controller
RS-485
Connector
RS-485 ports
USB port

Smart DC Controller
COM
COM
COM
COM
COM
COM
COM
COM
STOP
OPEN
RADIO
CLOSE
OPEN
OPEN
PARTIAL
SENSOR 2
EXIT
LOOP
BLOCK
EXIT
IN OBS
LOOP
OUTOBS
LOOP
CENTER
LOOP
COM
+ 24 V
EMERG
OPEN
SHOW
LEDs
R
ADI
O
O
P
T
I
O
NS
E
D
G
E
+24
V
O
P
E
N
C
O
M
DU
A
L
G
A
T
E
COM
B
A
U
S
ER
2
C
O
MN
O
DC
COMMON
TERMINALS
24VDC
24VDC
12VDC
12VDC
SENSOR 3
SENSOR 1
SENSOR
SA 0 (OFF)
SYSTEM ADDRESS
Press Select again to set gate
operator's system address
(Each gate operator attached
to the same HyNet must have
a unique SA number. Choose
1, 2, 3, or 4.)
2
1To access Installer Menu, press
Menu button twice. Then, press
Reset and Open.
Press Select to navigate to
Installer Menu item "SA"
System Address.
3To exit Menu mode, press Menu. The
gate operator returns to Run mode.
4Refer to Table 1: HyNet LED Indicators on page 2.
Solid green means serial communication is active and
functioning well.
HySecurity gate operators provide a 2-wire, serial interface (RS-485 connection) which allows remote access to
one or more operators.
When the physical connection is made and protocols are established, an SA (System Address) must be assigned
for each operator through its Installer Menu.
For network communication, choosing a “SA” of 1 to 4 establishes individual network polling addresses. HyNet
only utilizes numbers 1, 2, 3, or 4.
A “SA” of zero means no network communication is desired.
SA 1
SYSTEM ADDRESS
OPEN CLOSE STOP MENU RESET
PREV NEXT SELECT
5For IP network setup, refer to the HyNet Quick Start
manual supplied in the HyNet box.

Installer’sCheCklIst
Date Installed: ________________ Gate Operator Model: _________________________________________________________________
Site Location:__________________________________________________________________________________________________________
HyNet Serial Number:___________________________________
Gate Operator Serial Number: ___________________________
Gate Operator Serial Number: ___________________________
Gate Operator Serial Number: ___________________________
Gate Operator Serial Number: ___________________________
Customer Name:_______________________________________________________________________________________________________
Mailing Address:________________________________________ Inspected by: ____________________________________________
________________________________________________________ Date Inspected: __________________________________________
Phone Contact: _________________________________________ Phone contact number: ___________________________________
Checked Initials
1. Site Planning _____________
RJ-45 cable to system network.
2. Safety _____________
Review Important Safety Information in the gate operator's product manual.
Warning labels apparent and afxed properly.
Area around the gate and gate operator free of debris, cabinets/chassis include locking mechanism.
3. Electrical _____________
3.1 Grounding
• NFPA 780 Standard for the Installation of Lighting Protection Systems.
• Solid copper ground rod (C\,-inch diameter, 10 ft length) driven into ground within 3 ft of the gate operator.
• Single length of unspliced 6AWG copper wire less than 3 ft long attached to lug nut in gate operator.
3.2 Gate operator has current software loaded.
3.3 Congure the Controller
• Set the System Address (SA) in the Installer Menu.
•Communicate (verify) system address to IT Network Admin for proper web page conguration.
4. Review gate operator installation checklist from gate operator manual _____________
5. Take photographs of installation and provide an End User Demo _____________
Other manuals for HYNET SFP 4/1
2
This manual suits for next models
6
Other HySecurity Gateway manuals