T
ak
e
a
25NB
Rigid
PVC
Riser
pipe,
longer
than
the
height
of
the
vessel
and
solvent
cement
the
boom distributor to one end of the pipe.Insert this riser pipe into the vessel and cut the pipe from the top ensuring that the height of the pipe (with the distributor touching the boom) is 42mm more than the top of the vessel.Pour RESIN into the vessel. Cover the mouth of the riser pipe while doing this so that resin doesn't enter the pipe. Align the riser pipe so that it is in the centre of the vessel opening.Screw on the top distributor to the boom of the MPV.Screw on the MPV to the vessel ensuring that the riser pipe goes through the top distributor into the MPV. Connect the sucon filter assembly to the ejector sucon nozzle aer fing a ¾" valve on the sucon elbow of the MPV.Put the sucon filter into the Brine tank ensuring that the sucon filter always remain vercal. You can cut the supplied tubing to the correct length so that the tubing always remain taut and does not loop. Alternavely the sucon filter can be inserted in a 3" PVC pipe (with slot at the boom) which is clamped to the Brine tank.Make the Inlet, Outlet and Drain connecons.Sr. No. 273, Near Vitthal Mandir, Bhatewara Nagar,Hinjawadi, Pune - 411 057, Maharashtra (India)Tel.:+91 20 2293 2122, +91 20 2293 2123E-MAIL:inf[email protected]om www.initiativeengineering.com1. Mulport valve 2. Top and Boom DistributorSPECIFICATIONSSCOPE OF SUPPLYGENERAL ASSEMBLYMULTIPORT VALVE STM40FFINSTALLATION
Inlet/Outlet/ Drain connecons 1.5” BSPValve Threading for Vessel Mounng 2.5" NPSMFlow Rate 6m³/hr @0.5kg/ cm² Max. Operang Pressure 5kg/ cm²Ejector Sucon at 2kg/ cm² 750LphEjector Rao 1:11.2.3.4.5.6.7.:::::::Brine Line3/4" BSP3. O & M ManualFRONT VIEWSIDE VIEW344DRAININLET1753535
115112
3545
150
37
90142
307
167
Always press the handle down before turning the handle to the desired posion viz. Service, Regeneraon or Rinse.If the line pressure is more, It is advisable to close the inlet valve before turning handle.Ensure that minimum 2kg/cm² pressure is available for geng opmum ejector performance.If there is a sucon problem even at 2kg/cm² then the ejector may be clogged with dirt etc. For cleaning this, remove the ejector by unscrewing it from the MPV, clean and put back.
OPERATION
NOTE: You can also fill the RESIN in the vessel first and also fill some water in it. Then follow the procedure of cemenng boom distributor, cung correct length of riser pipe, fixing top distributor to MPV and then pushing the riser pipe through the top distributor into the MPV. Now this MPV with aached riser pipe can be pushed into the vessel and screwed on the top.123456781234