
Doc-HAND-05-v01.00-Verk
iss. 05/05/2020 –DVDB / app. DVDB
< 616810 Base Station Box - Installation Manual>
iQunet
|
Broekstraat
82,
B-9220
Hamme,
Belgium
|
T
+32
52
86
00
25
|
[email protected] page 2/4
1. Open the box.
2. Install the M16 gland.
3. Install the back of the box against the
wall, using the 4 corner holes.
4. Insert the cable. Insert the micro USB-B
connector from the outside to the inside
of the box.
5. Put the USB cable through the cable tie.
Keep an overlength of 200mm.
6. Tighten the cable tie.
7. Fasten the cable gland.
8. Click the iQunet Base Station on the
micro USB connector.
9. Curl the cable in a wide loop.