Part Name / Description:
Platinum 2.0 Center ECU Support
Instruction #:
JIC-INSTP2-00004
Operation Instruction Title:
Platinum Centre ECU Support
Revision Date: 04/03/2018
Apply the PVC solvent to the bottom of
the short pipe. Slide the MB20227
junction box on the bottom of this pipe.
The opening of the junction box should
face the rear of the cabinet.
Install the PB4776 lid on the junction box
loosely.
Silicone around the pipe/roof joint on the
inside of the cabinet.
Wiring the Solenoid Valves (Pre-24VDC controls)
From the roof, feed the wiring for the
solenoid valves along the low voltage
trough and down the PVC conduit to the
connection box.
Ensure the hole through the center roof
extrusion is fitted with a snap bushing.
Cut the wiring approximately 8” longer
than the bottom of the box, and connect
to the terminal strip inside the connection
box.
Twist the top of each solenoid valve so
that the DIN plugs face inward at
approximately a 35° angle.
The angle should be consistent between
the two solenoids so that they are a
mirror image of each other.
Note: Ensure the ECU connections will
remain inside the limits of the ECU and
center support, otherwise they may be
damaged by impact from the racks.