
8
1. POOL WATER PREPARATION
a. Measure the pool size in litres to determine salt level requirements.
b. Refer to salt requirements chart (refer page 16). Add 4 kgs. of refined
Pool Salt per 1000 litres of water in shallow end of pool.
c. Connect up vacuum hose and place vacuum head in deepest part of
pool and run for 24 hours to dissolve in salt.
d. THE SALT MUST BE DISSOLVED COMPLETELY BEFORE THE
CHLORINATOR IS TURNED ON.
This should take (24 hours in summer – 72 hours in winter).
2. MOUNTING THE POWER PACK
a. Screw the mounting bracket to wall or post with slots facing upwards,
a minimum 1.2 meters off the ground & within 1.5 meters of the
power outlet and within 1.5 meters of the filter’s return to Pool Line
b. Place back of Power Pack to mounting bracket and slot into place.
NOTE: DO NOT MOUNT IN DIRECT SUNLIGHT or DIRECTLY ONTO METAL
FENCE OR METAL SHED. IF THIS IS THE ONLY PLACE THEN A PIECE
OF TIMBER BOARD 400MM x 250MM x 8MM SHOULD BE
MOUNTED TO THE METAL AND THEN MOUNT POWER PACK TO THE
TIMBER. FAILURE TO DO THIS WILL VOID WARRANTY OF UNIT.
3. INSTALLATION OF THE CELL
Determine Filter Return to Pool Line.
a. Cell Housing must be in a horizontal position with inlet and outlet
sockets facing downwards as per diagram (refer page 9).
b. Cell must be installed after the heater (where fitted) and Solar Systems
(refer page 9). Pool cleaner pump motors that draw water from the
return to pool line should be fitted after the Cell for correct pool
chlorination.
c. CAUTION: It is very important that no gas generated from the Cell can
find its way back into the Filter, Pump, Heater, Solar Systems or Spa
Blowers.
d. When position of the Cell Housing has been decided, turn off the
Pump/Filter and CLOSE OFF VALVES if required.
e. If the Return to pool line is 40mm pipe, use 50-40mm reducing bushes
provided. If it is 50mm pipe, glue pipe directly into the inlet & outlet
ports on the cell housing.