– 2 –– 2 –– 2 –
When the p.c.b. is installed, insert the cable to SC-910 following "Instruction Manual for DLU-5494N-7/SC-910/
M-91/IP-100C/KT-01", and connect the cable to EPF p.c.b. following the steps below.
9. After inserting the connector, put all cords together
with cable clip band !4 located on the side of the
box.
At this time, bundle the connectors which are
arranged above the wire saddle to wire saddle !5
and those which are arranged below the wire
saddle to wire saddle !6.
*For installing from M-91 motor to SC-910 control box or installing SC-910 control box on the table,
refer to "Instruction Manual for DLU-5494N-7/SC-910/M-91/IP-100C/KT-01".
1. Fix the cord clamp and the cable clip band following the attaching procedure.
(Refer to "Instruction Manual for DLU-5494N-7/SC-910/M-91/IP-100/KT-01".)
2. When removing the connector, remove it from the wire saddle and remove it while pressing the
hook of the cable clip band.
4. Securely fix EPF p.c.b. A (asm.) 1to the control
box main unit using three screws 4supplied with
the unit as accessories.
4
1
3
3. Insert EPF p.c.b. A (asm.) 1to connector CN47
3of the main unit as illustrated.
Do not forcibly press the circuit board.
!5
!4
!6
5
9
6
7
!3
!1
8
!0
!2
Cau tion
Cau tion
5. Connect 6P connector 5coming from the machine
head to connector 9(CN139).
6. Connect 4P connector 6coming from the machine
head to connector !0 (CN134).
7. Connect 14P connector 7coming from the
operation display panel to connector !1 (CN132).
8. Insert EPF relay connector 8to connector !2
(CN141) and connector !3 (CN42).