WarrantyTermsandConditions

 YourGreyWaterGatorMaxi100iscoveredbya1yearreturntobasewarranty
 Ifanypartshouldfailotherthanthemainpititshouldbereturnedtothe
manufacturerforinspection.
 Warrantycommencesfromdateofpurchase.
 Unitmustbeinstalledbyalicensedplumberorqualifiedinstaller.
 Incorrectoperationofunitisnotcoveredbywarranty.
 Labourandshippingforwarrantyclaimsarenotcoveredinthetermsofthisdocument
 Damagesincurredtopropertyorpersonsbyincorrectoperationorinstallationarenot
coveredbythiswarranty.
 Pleaseprovideproofofpurchasewithallwarrantyclaims.
 Ourtotalliabilityunderanywarrantyislimitedtoreplacingthedefectiveordamaged
goodsorrefundingthepurchaseprice.
 Weshallnotbedeemedliableforanylossbeyondourcontrol,orforanyindirector
consequentiallossofanykind



ACN 124 112 705 



18RayleighAvenue
QUEENSCLIFFVictoria3225
Ph0352585193
Fax0352585193
Email:sales@justwatersolutions.com.au
www.greywatergator.com
InstallationandOperatingInstructions
Grey Water Gator Maxi 100
WMKT22111
GuidelinesfortheGREYWATERGATORMAXI100
YourJustWaterSolutionsGreyWaterGatorMaxi100™isspecificallydesignedfor
GreyWaterreusefromthelaundry,showerandbathwastewater.
 YourGreyWaterUnitmustbeinstalledbyalicensedplumberinaccordance
withregulationsAS/NZ3500.2.2.2003
 DonotconnecttoakitchensinkorToiletasthisisclassedasBlackWaterand
isnotsuitableforthisunitorforreuse.
 OnlyconnecttosubsurfaceirrigationsuchasGreyWaterDriptubeorsullage
drainpipe.
WerecommendthatyoualsocheckwithyourlocalWaterAuthorityforapprovalof
thistypeofSeasonalUseGreyWaterDiversiondevice.
Itismandatorythatthepowercircuittothisunitisprotectedbyaresidualcurrent
circuitbreakerandwehighlyrecommendasurgeprotectiondevicebefittedaswell.
YourGreyWaterUnitispreassembled.Pleasecheckthecontentsondeliveryasin‐
transitdamagemayoccur.
INSTALLATION
Thisunitmustbeinstalledbyalicensedplumberandorserviceagent.Failureto
complywillvoidthewarranty
1.Yourplumber/installerwillinstallorlocateyourdedicatedGreyWater
Wastepipes.
2.Allowapprox350mmfromgroundleveltocut‐inpointInletpipe.
3.Ifyourpipeworkisdeeperthanthis,optionalrisersof200mmareavailable.
4.Theoverflowpipemustbeconnectedtoasewerdischargepointsuchasa
gullytrap.
5.Excavateasuitableareaapprox800mmdeep1000mmlongand600mm
wide.
Allowenoughroomforconnectiontopipework,electricalcableandconduit.
6.Makesurethebaseislevelusingfreeflowingpackingsand.Taketimetolevel
theunitandsetthecorrectheightsforthepipework.
7.Connectthepipe‐workmakingsuretheinletandoverflowpipesarecorrectly
plumbed,inaccordancewithAS3500.
8.Astheunithasaleadanda3pinplug,havealicensedelectricianinstalla
suitablepoweroutletadjacenttheunit.Makesuretheelectricalcableis
protectedatalltimes,andobserveelectricalregulationsinyourstate.
9.Connectthe25mmnon‐returnvalvetothedischargeoftheunit.
10.Connectthe25mmLilacpipe‐worktoyourirrigationsystem.
11.Afterallconnectionsarecompletedtotheregulationsyoucanbackfillthe
surroundingvoidwithsuitablematerial.(Freeflowingsandispreferred)Do
notbackfillwithsharporbrokenrocksthatmaydamageordistorttheunit.
12.Inspectthepittomakesureitisfreeofsandanddebristhatcoulddamage
thepump.
13.Youcantesttheoperationbyfillingwithwaterandobservingthewaterlevel,
SchematicDrawing
GreyWaterGatorMaxi100
1GreyWater Gator Maxi 100Pit 12 25mm Tank Inlet Fitting
2Lilac Lid for Pit 13 Pump Controller Complete
3Key for lid 13b Magnetic Float switch
4Blue Sub 15 High HeadPump 14 SS 6mm Allen Bolts
5Filter set of 5 14a Mounting Plate for Controller
6Riser Pipefor pump 15 100mm Wallace seals
725mm Socket 16 100mm Bend M&F
825mm Threaded Pipe 17 100mm Pipe Piece x155mm
925mm Swivel Elbow 18 100mm Diverter Valve
10 25mm Hex Nipple 19 Cable Gland
11 25mm Female Elbow 20 Watermark Approval Sticker
11.Donotpumptheresidualthroughtheirrigationsystem.
12.Onceeverythingiscleanedyoucannowreinstallthefilterstothetank
takingcaretofitthembackthesameastheywereremoved.
13.Youcanfilltheunitwithcleanwatertocheckoperationoffloatsanduse
thatcleanwatertoflushtheirrigationsystem.
14.Onceyouarehappytheunitisoperatingcorrectlyliftthehandleonthe
bypassvalvetoopentheflowintotheunit.
15.Refitthetopcoverandlockthelidwithyourkey.
16.Yourunitisnowservicedandreadyforoperation.
Atthistimeitisgoodpracticetocheckoveryourirrigationsystem.
Turnonthedrainvalvesattheendofyourirrigationlinesandremoveany
sedimentthatmayhaveaccumulatedinthepipes.Checkforanyleaksor
damagetotheirrigationpipework.Repairasnecessary.
PumpSpecificationsGREYWATERGATORMAXI100
YourGreyWaterGatorMaxi100unitisequippedwithaspeciallyselectedsingle
stagehighheadpumptohandlealmosteverydemandthataGreyWaterSystem
canhave.
Thispumpiscontrolledbyaninternalelectroniccontrolwhichstartsandstops
thepumpviaahighandlowmagneticfloatswitch.
Italsoisprogrammedtooverridethefunctionofthehighfloatswitchatleastonce
ina24hourcycle.
Thiswillensuretherewillbelittleornoresidualwaterremainingintheunit.
Noelectricalconnectionsarerequiredintheunititselfotherthananexternal
powerpointneartheunit.
Pumpperformancetable:
 Maximumflowof140l/mat1metrehead.
 Ratedflowof80l/mat10metreshead.
 Maximumheadof14.5metres.
 Maximumcurrent750watts240volt.
 Warrantyis12monthsreplacement,onconditionthatitisreturnedto
 placeofpurchase,withproofofpurchase.
14.MakesurethediversionvalveisopenallowingGreyWatertoflowintotheunit.
15.Turningonafixtureinsidethehousethatisconnectedtothegreywater
pipe‐workwillallowGreywatertoflowintotheunit.
16.Turnonthepowerbrieflyandcheckthepumpisoperatingcorrectly.The
IrrigationSystemisnotconnectedatthisstage,thiswillallowtheunittobe
flushedout.
17.Installationoftheirrigationsystemcannowtakeplace
18.Yourunitisnowcommissionedandreadyforuse.
Additionalnotes
Ifamanifoldisusedontheirrigationsystem,atleastonevalvemustbeopenatall
timestopreventthepumpoperatingatclosedhead,thatisano‐flowcondition.
Operationundertheseconditionswillvoidthewarranty.
Minimumpipesizefromtheunitis25mm.Using25mmLilaclowdensitypolytubeor
25mmPVCpipeisrecommended.
Troubleshooting
WaterdoesnotflowintotheunitCheckthebypassvalve,makesurethehandleis
Intheraisedposition.
Theunitisfullbutthepumpisnotoperating

Checkifpumpisconnectedtothepower
sourceandcheckifpowerisavailable.
Thepumpshouldautomaticallystartwhen
waterreachesthehigherfloatswitch. Ifpump
doesnotstart,cleanthetopfloatswitchand
testagain.

Thepumpcannotmaintaintherateof
Inflowingwater.
Checktoseeifirrigationsystemissized
correctly.
Atleast100MetersofTirandriptubeshouldbe
connectedtotheirrigationsystemasper
Irrigationinstructions.Theoutflowshouldbe
equaltotheinflow.Alsocheckforkinksor
Blockagesinpipeworkfromunit.
Thepumpsectionisemptywhilethewater
levelishighoninletside
Serviceandcleanthefiltermediatomaintain
flow.
GreyResidualisbuildinguparoundthe
Pump
Checkthefiltermedia,makesureitisseated
correctly andthattherearenovoidsunder
thefilterswhichwillcausebypassaround
them.
Offensiveodoursarereleasedfromyourunit Thoroughlycleantheunitandthefiltermedia.
Fillwithfreshwaterandpumpoutthrough
Irrigationsystem.
DISTRIBUTIONOFDIVERTEDGREYWATER
CurrentGovernmentRegulationsstatethatyoumustdisperseuntreatedgrey
waterviaaSubsurfaceirrigationsystem.
YoumustuseanapprovedirrigationsystemthatisspecificallydesignedforGrey
Water.
RecommendationsandGuidelinesforirrigationsystem:
ThearearequiredforyourIrrigationsystemdependsonthesoiltype.Thechartbelow
showsthesuggestedspacingrequiredbetweendripperlinesfordifferentsoiltypes,in
relationtothetotalarea.Minimumpipesizefromtheunitis25mmPVCorLow
Densitypolytube.
Makesurethemaximumlengthofdriptubeis20metresfromthemainline
SoilTexture&StructureandDripperlineandrowspacing

Arearequiredperperson*inhousehold(m2)
1‐2‐3‐4‐5‐6Persons


RecommendedFeatureSetbackdistance(metres)
Propertyboundaries,pedestrianpaths,driveways:1metre
Footingsofbuildings:1.5metre
Retainingwallfooting:1metre
Ingroundswimmingpoolsurrounds:1metre
Ingroundpotablewatertank:6metres
Boresintendedforhumanconsumption:30metres
Pleasealsorefertoyourlocalauthorityforregulationsastheserequirementscanvary
fromareatoarea.
WARNINGSANDPRECAUTIONSFORGREYWATERREUSE
 DonotconnectyourGreyWaterMaxitoyourkitchensink,dishwasherora
toiletsystem.ThisisallclassedasBlackwaterandmustgotosewerorseptic
waste.
 Whenwashingitemssuchassoilednappies,pleaseswitchyourdiversionvalve
todivertdirecttothesewerageorsepticsystem.
SoilTypesSpacing123456
Gravel and Loams x.06m 30 60 90 120 150 180
Sandy Loams x 0.6m 30 60 90 120 150 180
Loams x 0.8m 40 80 120 160 200 240
Clay Loams x 0.9m 45 90 135 180 225 270
Light Clays x 1.0m 50 100 150 200 250 300
Medium to Heavy x 1.5m 75 150 225 300 375 450
 DonotdistributegreywaterfromyourGreyWaterMaxiunitviasprinklersor
allowforairbornedispersion.
 Onlyirrigatewhennecessaryandswitchunittodivertwhenraining.
 DonotletdivertedGreywatertorunofftoneighbouringproperties.
 Donotleaveunitunattendedwhencarryingoutmaintenanceorwhenthe
coverisremoved.
 Incaseofextendedperiodsofnonoperationitisadvisedtocompletea
serviceandcleanoftheunittoavoidthepossibilityofdryingoutthesludge
onthefilters.

MAINTENANCEOFYOURGREYWATERUNIT
YourGreyWaterGatorMaxihasbeendesignedforminimummaintenance.
Duetothehighflowcapabilitiesofthe3dimensionalfiltersyoushouldonlyneedto
cleanyourunitafterapproximately40,000+litresofflowthrough.
Dependingofthenumberofoccupantsandtheamountofwaterflowingthrough
yourunitthecleaningcyclewillbebetween180–360days.
Yourfiltersstillwillkeepworkingevenuptomaximumcapacity.
Someheavyloadsituationsmayrequireservicingyourunitonamorefrequentbasis.
Ifyouareconsideringnotusingyourunitforanextendedperiodoftimesuchasafew
months,pleasecarryoutafullserviceandcleanbeforedecommissioning.Thiswill
keepyourunitinoptimumconditionandeliminatebacteriabuildup.

Whenservicingandcleaningyourunitwerecommendthatyouwearprotective
rubberglovesandavoidskincontactasmuchaspossible.

1.Werecommendthataregisteredserviceagentcarryoutthemaintenanceto
thisunit.
2.Turnoffallpowertotheunit.
3.Removethelidwithyourkeyprovided.Bemindfulofanychildrenorpets
thatcouldaccidentallyfallintotheunitwhileservicing
4.Setthebypassvalvetotheclosedbypassposition.Thiswillprevent
Greywaterenteringtheunitwhileyouareworkingonit.
5.Youcannowaccessthefiltermedia.
6.Removerthefilterpadseitheroneatatimeortogether.
7.Takethefilterstoasuitableareaforcleaning.
8.Rinseofffiltersusingahandnozzlefromadomesticsupply.Washbothsides
untilreasonablyclean.NBthefiltersdonothavetobespotless.
9.DonotuseHighPressureCleaningequipmentonyourfiltermedia.
10.Atthistimerinsethepitandpumpandremovetheresidualwithaseparate
sumppump,orspongetheremainingresidualfromtheunit.


Popular Water Filtration System manuals by other brands

Wateranywhere AAA-RO50PW MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE

Wateranywhere

Wateranywhere AAA-RO50PW MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE

STA-RITE Swimming Pool Filter owner's manual

STA-RITE

STA-RITE Swimming Pool Filter owner's manual

Separ Filter SWK-2000/40/WSA operating manual

Separ Filter

Separ Filter SWK-2000/40/WSA operating manual

Klimawent STRONG-2000-N Use and maintenance manual

Klimawent

Klimawent STRONG-2000-N Use and maintenance manual

SpectraPure The Producer System Installation and operating manual

SpectraPure

SpectraPure The Producer System Installation and operating manual

Kessel EasyClean Installation and operating instructions

Kessel

Kessel EasyClean Installation and operating instructions

Envig Solo Installation

Envig

Envig Solo Installation

Beko OWAMAT 2 Instructions for installation and operation

Beko

Beko OWAMAT 2 Instructions for installation and operation

Metasys MULTI SYSTEM 1 Instructions for use

Metasys

Metasys MULTI SYSTEM 1 Instructions for use

Filtertechnik SFC-3000-316-AIR user manual

Filtertechnik

Filtertechnik SFC-3000-316-AIR user manual

Schaffner FN5420 User and installation manual

Schaffner

Schaffner FN5420 User and installation manual

Viqua K owner's manual

Viqua

Viqua K owner's manual

Unilever pureit UR5640 instruction manual

Unilever

Unilever pureit UR5640 instruction manual

CWR GS2 Installation Guide and Technical Information

CWR

CWR GS2 Installation Guide and Technical Information

Premier WP-4V Installation, operation and maintenance manual

Premier

Premier WP-4V Installation, operation and maintenance manual

Litree LUSA1-1C user manual

Litree

Litree LUSA1-1C user manual

Nikken PIMAG AQUA POUR EXPRESS Quick reference sheet

Nikken

Nikken PIMAG AQUA POUR EXPRESS Quick reference sheet

PURAPOOL PURACHLOR BLU Series INSTALLATION INSTRUCTIONS & PRODUCT MANUAL

PURAPOOL

PURAPOOL PURACHLOR BLU Series INSTALLATION INSTRUCTIONS & PRODUCT MANUAL

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.