UV LED Failure alarm*
Wall Hanging Diagram
Step-1
1. Paste the central drill sticker on wall at (3.6 feet to 4.0 Feet from the ground) as per your convenience.
2. Ensure that the sticker is pasted straight on the wall, then drill holes as per the space provided on sticker.
3. Now, insert the puff up with the help of a hammer.
4. Screw in two 10X50 self-taping screws, 5.6 inches (142 mm) apart horizontally.
5. Carefully hang the purifier on the wall with the help of wall-mounting slot holes provided on the back side
of the purifier.
Note:
1. If the wall is not straight or the screws are not properly drilled in an even position, it will damage
your purifier.
2. Keep the device away from heat or direct sunlight.
Step-2
Figure 1. Figure 2. Figure 4.Figure 3.
1
2
3
4
4
2 1 3
1. First fix the SS ball valve (marked as no. 4) to the 1/4 inch port of the 3-way connecter (marked as no. 2)
as shown in figure 2.
2. Connect the 3-way connector to the raw water supply (marked as no. 1) as shown in the figure 3. The
3-way connector is fit in line with the raw water supply.
3. The other end of the 3-way connector can be connected to a tap (marked as no.3) as shown in figure
or can be plugged off if not required.
1. Now connect one end of the white pipe to SS ball valve and
another end to the upper push-fit elbow fitting to the left hand side
of the purifier labelled as WATER IN, as shown in fig 1.
2. Similarly, connect one end of the white pipe to the lower elbow
fitting connector in tank labelled as REJECT WATER and leave the
other end in the drain, as shown in fig 2.
Step-3
1. Connect the power supply.
2. Installation is complete.
Before connecting the power supply, it is important that you perform the
following functions:
1. Open the SS ball valve (Handle parallel to the ball valve) to start the
flow of water into the purifier, as shown in the figure.
2. Wait for 2-3 minutes to ensure that the filters are soaked in water.
Step-4
Step-5
* Tested & certified by TUV-SUD South Asia (P) Ltd.
Recommended Site Preparations:
Installation Procedure:
Specific Instructions:
• Single Phase 100-250 V AC, 50-60 Hz.
connection not more than 3m away from the
point of installation of purifier
• Raw water supply with ½ inch nipple not more
than 3m away
• Drain for rejected water not more than 3m away
• Space as per dimensions of the purifier
• Wall/plane surface for mounting two
screws and holding the machine
• The system and installation must comply
with state and local laws and regulations
• The purifier automatically shuts off when the
storage tank is full
• The purifier does not start if the inlet water
supply pressure falls below 0.3 kg/cm²
• The purifier automatically restarts when the
water level drops below the maximum
• The purifier does not allow any water rejection
in absence of electricity/when tank is full
Automatic Operation
The KENT Supreme Mineral RO™ Water Purifier is a product of advanced technology, which ensures
safe and clean drinking water. The purifier is easy and convenient to install.
Installation Instructions
• It is preferable to install the purifier near a sink
so that the inlet and reject water lines are easily
available
• KENT Supreme Mineral RO™ Water Purifier is
a wall mountable purifier. Make sure that it is
only mounted on a wall. Avoid installation on
wooden and metallic stands
• For optimum performance and minimum inlet
pressure required, ensure that the raw water
supply tank is at least 10 ft. above the
purifier
KENT Supreme Mineral RO™ Water Purifier has an in-built feature that sounds an audible alarm if the
UV lamp malfunction. This feature is provided to ensure purity. This UV Fail Alarm will sound as
following: Two short beeps after every two seconds.