
965X QUICK START965X QUICK START
Load Door Job from Library
965X Quick Ref 1
1. Select the Libraries Tab at the upper let side of the screen
2. Select the Door Job Libray Tab at the upper center screen
3. At the Door Job List double click the desired door job to go
to the Door Job screen
Verify Door Job
Add Jambs to Queue
Verify the Door Job specii-
cations. Look for validation
errors.
Note: For more information about Libraries,
see the KvalCam Manual.
1. Enter the quantiy of door to be processed in the Door
Qy box at the botom of the screen
2. Select the Add to Queue Buton
Before Processing a Jamb
Home the machine (Impotant: Homing sets a stating
reference point for the machine.)
1. Select the Jamb Suppot Block: Choose the pre-
determined numbered block to match the jamb
syle.
2. Select the Jamb Stop Reference: Select the
Jamb Stop placement, Jamb End or Dado.
Process a Jamb
1. Extend Clamps: Extend the Door Clamps and Door Stops,
select the Jamb Stop Foot Pedal or Toggle Stop buton at the
Main screen.
2. Load Jamb: Load the jamb onto the machine Jamb Shelf.
3. Align Jamb: Align the jamb to the Jamb Stop and the Up-
Clamp. Make sure the it is tight.
4. Clamp: Secure the Jamb. Select the Jamb Clamp Foot Ped-
al or Toggle Clamp. Warning: Keep Hands away from the
Clamps.
5. Start Sequence: Stat cuting by pressing the Stat Se-
quence buton or by selecting the Stat Sequence buton at
the Main screen. Exit the Cuting area within 3 seconds.
6. Continue or End: If continuing processing the jamb, select
the Next Group buton, reposition the jamb, and repeat Steps
1-5 above. If completed with this jamb, remove jamb and con-
tinue to next the jamb. If ending the process, park the Cuter
Head.
Important Notes
OR
OR
Jamb Stop Up-Clamp
=
w
OR
Always Park the Carriage Head during processing breaks
and at shutdown. →Go to Next Jamb
→Stop Processing
Power-Down
Power-UP
Verify Area is safe, power and air are applied,
E-Stops are out and Fence Gates are closed.
1. Turn the Electrical Disconnect to the ON
position on the Electrical Cabinet.
2. Turn the Control Circuit Switch to the
ON position. (Approximately 3 minute
boot-up)
3. Push the Stat buton.
4. Home the machine
All Tower Lights Should be Green. See reverse side
for Tower Light Description.
1. Park the Cuter Head
2. Right click the KVAL icon at the taskbar.
Select Exit from the drop down menu
Make sure Window is shutdown before
cuting o power to the machine.
3. Turn the Control Circuit Switch to the
OFF position.
4. Turn the Electrical Disconnect to the
OFF position on the Electrical Cabinet.
EXITEXIT
OR
Ater Stat Sequence, the operator must exit the cuting
area beyond the Safey Light Cutain within 3 seconds. If not
exited, the Stat Sequence will cancel. To restat, press the
Stat Sequence again and exit the cuting area within the 3
second rule.