manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Lacava
  6. •
  7. Control Unit
  8. •
  9. Lacava 0648 User manual

Lacava 0648 User manual

This manual suits for next models

5

Popular Control Unit manuals by other brands

Seitz 14A80 user manual

Seitz

Seitz 14A80 user manual

Wilo RS485 Installation and operating instructions

Wilo

Wilo RS485 Installation and operating instructions

Becker CentralControl CC41 Commissioning Instruction

Becker

Becker CentralControl CC41 Commissioning Instruction

SICK CDB650 operating instructions

SICK

SICK CDB650 operating instructions

Panduit NetKey NKP5E88M Series installation instructions

Panduit

Panduit NetKey NKP5E88M Series installation instructions

MX Options Concentric Petite Fitting instructions

MX

MX Options Concentric Petite Fitting instructions

Clean Water Systems Fleck 2510 Installation & start?up guide

Clean Water Systems

Clean Water Systems Fleck 2510 Installation & start?up guide

Fairchild FSB44104A user guide

Fairchild

Fairchild FSB44104A user guide

LEGRAND Wattstopper LMIN-104 installation instructions

LEGRAND

LEGRAND Wattstopper LMIN-104 installation instructions

PMK ATT10BNCS instruction manual

PMK

PMK ATT10BNCS instruction manual

Tektronix TDS3FFT user manual

Tektronix

Tektronix TDS3FFT user manual

Woodward easYgen Technical manual

Woodward

Woodward easYgen Technical manual

Balluff BNI EIP-502-105-R015 user guide

Balluff

Balluff BNI EIP-502-105-R015 user guide

NXP Semiconductors TWR-LS1021A Getting started

NXP Semiconductors

NXP Semiconductors TWR-LS1021A Getting started

Advantech PCM-3117 Startup manual

Advantech

Advantech PCM-3117 Startup manual

Danfoss MCO 101 manual

Danfoss

Danfoss MCO 101 manual

Moons' Lin Engineering R701P user manual

Moons'

Moons' Lin Engineering R701P user manual

Aventics RV1 operating instructions

Aventics

Aventics RV1 operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

LACAVA®
6630 west wrightwood ave chicago il 60707 usa tel 773 637 9600 fax 773 637 9601 info@lacava.com www.lacava.com
Important: Keep this manual for future technical assistance and/or replacement parts. Please read the instructions within
the booklet carefully prior to installation. LACAVA recommends that this fixture be installed by a professional plumber and
will not be held responsible for any damage caused by improper installation. It is the responsibility of the homeowner to
ensure that this fixture complies with all local plumbing codes. Shut off water supply before starting installation. Please see
the Terms & Conditions found within this booklet for additional information. For technical assistance please contact
773-637-9600.
Importante: Guarde este manual para futura asistencia técnica y / o piezas de repuesto. Por favor, lea las instrucciones
en el folleto cuidadosamente antes de la instalación. LACAVA recomienda que este producto sea instalado por un técnico
y no se hace responsable de los daños causados por una instalación incorrecta. Es la responsabilidad del propietario
garantizar que este aparato cumpla con todos los códigos de plomería locales. Por favor, consulte nuestros Términos y
Condiciones que se encuentran en este folleto para información adicional. Para obtener asistencia técnica, por favor
contacte a: 773-637-9600.
Table of Contents/Contenido:
Page 2: Product Specifications/Especificaciones de Producto
Page 3: Parts Breakdown/Desglosamiento de Partes
Page 4: Installation Instructions/Instrucciones de Instalación
Page 6: Cleaning & Care/Cuidado y Limpieza
Page 7: Warranty/Garantía
Page 8: Terms and Conditions/Términos y Condiciones
Owner’s Manual
Thermostatic Valve with Volume Valve,
and 3-way Diverter
Items: 0648, 1448, 1548, 1848, 2848, W1048
Features:
-Built-in thermostatic valve with three-way diverter and volume control
-Brass construction with Vernet thermostatic cartridge & ceramic disc cartridge
-Rough-in and trim sold separately
-3/4" Female NPT inlets & outlets
-Flow rate: 6.7 GPM at 43.5 PSI
-It can be installed to meet ADA compliance
-Screwdriver service stops
-Meets and exceeds applicable national codes and standards
-CAL-Green compliant
LACAVA LLC2
Product Specifications/Especificaciones de Producto
Note:
Drawings provided herein are meant to give the user an idea of the product and are not made to scale. The sizes in
inches are rounded up to the nearest 1/16.
Nota:
Los planos proporcionados en este documento tienen el propósito de dar al usuario una idea del producto y no
están hechos a escala. Los tamaños de pulgadas se redondean al más cercano 1 / 16.
Hot Cold
5 1/8"
130
11 3/8"
290
HC
100
OFF
ON
Out
Out
Out
9-1/2"
242
3/4" NPT
20
6"
152
3/4" NPT
20
3 x 3/4" NPT
20
3 1/8"
80
3 1/8"
80
3 3/8"
85
1 3/4"
45
4 7/8"
122
2 3/4" - 3 1/2”
70 - 90
2" - 2 3/4”
50 - 70
LACAVA LLC3
Parts Breakdown/Desglosamiento de Partes
Note:
Please reference this sheet and the corresponding part number when requesting parts.
Nota:
Por favor referirse a esta pagina y la parte correspondiente cuando ordene partes.
Parts:
R039 - Replacement thermostatic cartridge
XX48-B - Rough-in assembly
R033 - Replacement diverter cartridge
R027 - Replacement ceramic disc cartridge
26 27 28
29
30
31
32
33
34
35
36
LACAVA LLC 4
Installation Instructions/Instrucciones de Instalación
1. Determine the location of the valve. Make sure the back of the valve will measure 2 3/4” - 3 1/2“ from the surface of
the finished wall. Then install support framing to mount the valve to.
2. Position the valve in the wall (check depth) and secure into place on the support framing using the provided screws.
3. Install 3/4”NPT threaded copper adapters to the outlets and hot & cold inlets, applying teflon tape to all
threaded connections. Then solder copper piping onto adapters and run to designated water supply or outlet.
Important! Take the following precautions if soldering copper piping directly onto valve:
a) Remove ALL components from the valve prior to soldering, including plaster guards, cartridges and service stops.
b) Wrap valve body with cold rag before soldering. Take special care not to overheat brass rough-in.
c) Use copper piping only, do not attempt to solder steel piping to valve.
d)
Flush all pipes before reinstalling cartridge and service stops.
e) Reinstall all components after soldering.
4. Install 3/4” nipple to the outlet so that it extends beyond the finished wall and install a water-tight cap.
5. Turn on the hot and cold water supplies and check for any leaks.
6. Remove plaster guards. Make sure volume cartridge is in the OFF position (center). Remove outlet cap.
Make sure to have a container set up to collect water. Now open the valve and flush the system on all outlets.
7. Turn valve off and reinstall plaster guards and cap.
HC
A
CB
3 x 3/4" NPT
20
2 3/4" - 3 1/2”
70 - 90
2" - 2 3/4”
50 - 70
A
B
C
LACAVA LLC5
Installation Instructions/Instrucciones de Instalación
Setting the Temperature Range
8. Finish the wall around the plaster guards. Make sure the valve is at the proper depth before finishing the wall.
9. Once the surrounding wall is finished remove the plaster guards.
10. Apply a bead of silicone sealant onto the back edge of the backplate and slide into place over the cartridge
bodies. Using a clean rag, wipe off any excess silicone.
11. Loosen the set screw inside the thermostatic temperature control handle (A). Slide it on to the cartridge stem and
tighten the set screw. Install finished cap.
12. Loosen the set screw inside the volume handle (B). Slide it onto the cartridge in the proper position, tighten
the set screw, and install the finished cap. Repeat for diverter handle (C).
A
B
C
The valve comes from the factory with the water temperature set to 100° F and STOP button as anti-scalding device.
STOP!
=38°C - 100°F <38°C - 100°F >38°C - 100°F
MAX 49°C - 120°F
PRESS AND TURN
Turn clockwise for temperature
lower than 100°F
Press button and turn counter-
clockwise for temperature
higher than 100°FFactory set 100°F
If the water temperature at the STOP button is not set to 100° F, remove the thermostatic handle and safety stopper,
calibrate the water temperature to 100° F by rotating the cartridge stem and measuring the water temperature
with a thermometer, then reinstall the safety stopper and handle.
Thermostatic handle
Cleaning and Care
For best results, please care for this product in accordance with the following instructions:
- Only use warm water and a mild detergent (i.e. dishwashing soap) for cleaning.
- If another cleaner is used, check the label to make sure that it is safe for use on the material being cleaned and
always test in an inconspicuous area first.
- Make sure to wipe any excess cleaners off with a damp sponge or cloth and then rinse with water.
- Dry the surface with a soft cloth until dry after each use.
- Never use abrasive materials or cleaners that contain ammonia, bleach or acid, since they can cause damage
to the finished surface.
We would like to thank you for your purchase and are confident that you will be able to enjoy our products for
many years to come!
Para mejores resultados, por favor cuide des este producto de acuerdo con las siguientes instrucciones:
- Sólo utilice agua tibia y un detergente suave (es decir, el jabón para lavar la vajilla) para la limpieza.
- Si se utiliza otro limpiador, revise la etiqueta para asegurarse de que es seguro para el uso del material para su
limpieza y siempre prueba en un área discreta primero.
- Asegúrese de limpiar cualquier exceso de productor de limpieza con una esponja o un trapo húmedo y luego
enjuague con agua.
- Seque la superficie con un paño suave hasta que se seque después de cada uso.
- Nunca use materiales abrasivos o productos de limpieza que contienen amoníaco, lejía o ácido, ya que pueden
causar daños a la superficie acabada.
¡Nos gustaría darle las gracias por su compra y estamos seguros que usted podrá disfrutar de nuestros productos
por muchos años!
Cuidado y Limpieza
LACAVA LLC 6
Maintenance
Remove the handles and backplate
Close the screwdriver service stops.
Make sure to open the service stops
after cartridge servicing is complete.
Pull out the safety stopper,
untie the cartridge nut, and pull
out the cartridge, clean it, soak
in limescale dissolving solution or
replace with new thermostatic
cartridge. Make sure to lubricate
washers before inserting the
cartridge back in.
Reassemble all parts.
Remove the stop valve ceramic cartridge
by removing the handle, adapters,
and locking nut. Insert a new
cartridge and replace all parts.
Check for leaks.
Follow the same steps for the diverter
cartridge if part of the fixture.
If the valve leaks from the handle or drips from the outlet, or water temperature cannot be controlled,
please replace the cartridges as shown below.
service stops safety
stopper
cartridge
nut
LACAVA LLC 7
Warranty
LACAVA LLC provides a Limited Lifetime Warranty on its faucetry. This warrants any faucet, installed in a residential
application, to be free of defects in material and workmanship for as long as the original consumer owns his or her
home. Any product installed in a commercial application is covered under warranty for one year. LACAVA warrants
all other products to be free from any defects in materials or workmanship, during normal residential or commercial
use including all hinges, drawer slides, finishes, and general workmanship of the item for a period of one year.
LACAVA warranties do not cover normal wear and tear, damages due to negligence, faulty installation, improper
alterations and repairs, improper cleaning and care, or damages due to uses of the product other than its intended
and normal use. If a defect is found under normal use, while under warranty, LACAVA will repair or replace the
product (whichever cost is smaller to LACAVA) at its own expense (excluding shipping and installation charges).
Under no circumstances is LACAVA responsible for installation/service fees or any dollar amount beyond the cost of
the item. In addition, all LACAVA products are to be installed by experienced professionals properly licensed and
bonded; otherwise, any LACAVA warranty and liability is to be considered waived. All warranties are non-transfer-
able and proof of purchase is required for any warranty claim.
In accordance with the laws of limitation and exclusion state by state, and therefore provided the duly exceptions,
LACAVA will not be held liable, in any event, for any special, indirect, incidental or consequential damages or losses
(including but not limited to damages for loss of business, loss of profits, etc.) for breach of contract, tort (including
negligence), product liability or otherwise, even if it has been advised of the possibility of such damages. LACAVA’s
liability on any claim (including negligence) will not in any case exceed the contract price paid by the original
purchaser for the product claimed defective or unsuitable. It is the responsibility of the homeowner to ensure that all
installed fixtures comply with all local plumbing codes.
LACAVA LLC proporciona una Garantía Limitada de por Vida en sus grifos. Esto garantiza que cualquier grifo,
instalado en una aplicación residencial, no presentara defectos en el material o de fabricación, mientras que el
consumidor original posea su casa. Cualquier producto instalado en una aplicación comercial está cubierto bajo
garantía por un año. LACAVA garantiza que todos los otros productos no presentaran defectos en el material o de
fabricación, durante el uso normal, residencial o comercial incluyendo las bisagras, rieles, acabados, y confección
en general del artículo, por un período de un año. Las garantías de LACAVA no cubren el desgaste normal, los
daños debido a negligencia, instalación errónea, modificaciones y reparaciones impropias, limpieza y cuidado
impropio, o daños debido a la utilización de los productos distintos de su uso previsto y normal. Si un defecto es
encontrado bajo el uso normal, mientras bajo garantía, LACAVA reparará o reemplazará el producto (el costo
menor a LACAVA) a su cargo (excluyendo cargos de envío e instalación). Bajo ninguna circunstancia LACAVA
será responsable por servicios de instalación, compensaciones por servicios o cualquier cantidad que exceda el
costo del artículo. Además, todos los productos de LACAVA deben de ser instalados por profesionales experiment-
ados con licencia y seguro; de otro modo, cualquier garantía de LACAVA y obligación será cancelada. Todas las
garantías son intransferibles y el comprobante de compra es requerido para cualquier reclamo de garantía.
En conformidad con las leyes de la limitación y exclusión de estado a estado, y con las excepciones aquí debida-
mente presentadas, LACAVA no será responsable, en cualquier caso, por ningún daño especial, indirecto,
incidental o consecuencial o pérdidas (incluyendo pero no limitadas a daños por pérdida de negocio, pérdida de
beneficios, etc) por incumplimiento de contrato, agravio (incluyendo negligencia), responsabilidad por
Productos defectuosos o de otro modo, incluso si se ha advertido de la posibilidad de tales daños. La Responsa-
bilidad de LACAVA en caso de reclamaciones (incluyendo negligencia) no superarán en ningún caso el precio del
contrato pagado por el comprador original del producto reclamado defectuoso o no apto. Es la responsabilidad
del propietario garantizar que todos los accesorios instalados cumplan con todos los códigos de plomería locales.
Garantía
Terms and Conditions
UNIQUENESS:
Many LACAVA products are made of natural stone, woods, or metals. Because of the natural variations, and/or
handmade nature of the products, slight differences are expected and are not deemed manufacturing defects.
SHIPPING POLICIES:
Once the merchandise is released to and accepted by the carrier, LACAVA's responsibility ends. LACAVA LLC is
not responsible for damages occurring in transit. After the merchandise is delivered and the shipping document is
signed, it becomes the property of the purchaser. We constantly improve the packaging as new technologies
become available, but damages in transit may still occur. Therefore, we recommend that all packages be
inspected by the purchaser in the carrier's presence upon delivery. In case of damages, either visible or concealed,
the purchaser is responsible for filing any damage claim against the carrier. In this regretful circumstance, we
suggest utter diligence to have the carrier's agent explain the steps to submit a valid claim against the carrier, as
each carrier has different claim policies. Please document everything in writing, preferably on the shipping
documents and have also the carrier's agent sign along. If you wish that Lacava assists you in the claim process,
please fax or email us copies of the shipping and claim documents at your earliest convenience. In the case of
missing items, which could occur due to our mistake or a theft during transit, please follow same procedures as for
shipping damages above, with the only difference that the claim concerns something completely missing, rather
than damaged. Please take note of any visible tampering with the packaging in the presence of the carrier's agent
before accepting the delivery with your signature. In case of missing items, you must also inform LACAVA and send
us all related documents within 24 hours from the delivery date. We will open an internal investigation and check
the inventory count to determine whether it was our error. If we verify it was our mistake, we will promptly ship the
missing item(s) to the purchaser by standard ground at our cost.
RETURN POLICIES:
If the product is not satisfactory for any reason different from defects, it can be returned to LACAVA LLC up to 30
days from the shipping date after obtaining a Return Goods Authorization (RGA) valid for 60 days. If the product is
not returned to LACAVA within that timeframe, the RGA will be voided and no further RGAs will be issued for the
product. The merchandise must be in salable condition, in its original packaging, and packed safely with the RGA
number clearly marked on the outside packaging. To obtain an RGA number, please fax or email the request with
a description of the reason for return. The merchandise must be in its original packaging and packed safely in
accordance with the carrier's packing requirements, with the RGA number clearly marked on the outside
packaging. LACAVA reserves the right not to issue any credit, if an approved RGA number has not been obtained.
A restocking fee of 25 percent and applicable shipping charges to the customer and back will be deducted from
the credit amount. Credit (excluding shipping and handling charges) will be given only for returns of intact products
up to 30 days from the shipping date. After 30 days from the shipping date, no returns will be accepted. All returned
merchandise is at the purchaser's risk and cost. Special order and custom made items are not returnable. Products
must be inspected prior to installation and installation of the product means its acceptance. Product, once installed,
cannot be returned. Damages occurring in installation are not considered defects and are not subject to return or
refund. LACAVA will replace any defective item for free only after the non-conforming product is safely returned to
LACAVA’s warehouse safely in accordance with the carrier's packing requirements, and in its original packaging,
within 30 days from the shipping date. If the product is not found to be defective and is damaged in any way, there
may be a charge for any replacement. In any case, LACAVA does not cover installation costs.
LACAVA LLC8
Términos y Condiciones
SINGULARIDAD:
Muchos productos están hechos de piedra natural, maderas o metales. Debido a las variaciones naturales, y / o la
naturaleza de los productos artesanales, pequeñas diferencias se pueden esperar y no se consideran defectos de
fabricación.
POLÍTICAS DE ENVÍO:
Una vez que la mercancía es entregada y aceptada por la compañía de transporte, la responsabilidad de LACAVA
termina. LACAVA LLC no es responsable por daños ocurridos en tránsito. Después que la mercancía se entrega y el
cliente firma el documento de transporte, la mercancía se convierte en la propiedad del comprador. Con el avance
de tecnología estamos constantemente mejorando nuestros modos de empaque. Pero los daños en tránsito aun
pueden ocurrir. Por lo tanto, se recomienda que todos los paquetes sean inspeccionados por el comprador en
presencia de la compañía ala hora de entrega. En el caso de daños, ya sea visible o encubierto, el comprador es
responsable de presentar cualquier reclamo por daños contra el transportista. En esta circunstancia lamentable, le
sugerimos que ser muy cauteloso y pedir a el agente de la compañía que le explique los pasos para presentar una
demanda legal contra la compañía (ya que cada compañía tiene políticas de demanda diferentes). Documente
todo por escrito, de preferencia en los documentos de embarque, también pida a el agente/chofer que firme a lo
largo. Si usted desea que nosotros, le ayudemos en el proceso de reclamo, envíenos por fax copias de los
documentos de envío y reclamo a la más brevedad posible. En el caso de que falte mercancía a su orden, ya que
no sabemos si se debe nuestro error o de un robo durante el transporte, por favor, siga el mismo proceso que el
anterior. Con la única diferencia de que el reclamo será por algo completamente desaparecido, y no por daño. Por
favor note, en la presencia del agente/chofer de la compañía, cualquier alteración visible en el empaque. En el
caso que falten artículos, también hay que informar a LACAVA y enviar todos los documentos relacionados con un
plazo de 24 horas a partir de la fecha de entrega. Vamos a abrir una investigación interna y verificar el recuento de
inventario para determinar si fue un error de nuestra parte. Si nos damos cuenta que fue nuestro error, rápidamente
se le enviara el artículo que falta al comprador por UPS (tierra) sin costo extra.
PÓLIZAS DE DEVOLUCIÓN:
LACAVA reemplazará cualquier producto defectuoso debido a defectos de fabricación sólo después de la no
conformidad del producto se devuelve al almacén LACAVA en condición vendible plazo de 30 (treinta) días a partir
de la fecha de envío. En cualquier caso, LACAVA no cubre los costes de instalación. Si el producto no es satisfactorio,
por cualquier motivo diferente de los defectos, que pueden ser devueltos a LACAVA LLC hasta 30 (treinta) días a
partir de la fecha de envío después de obtener una Autorización de Devolución de Bienes (RGA), válida por 60 días.
Si el producto no se devuelve a LACAVA dentro de ese plazo, la RGA se anularán y no se RGA se emitirán nuevos
para el producto. La mercancía debe estar en su embalaje original y embalado de forma segura. Una tasa de
reposición de 25 por ciento y los gastos de envío aplicables a los clientes y la espalda se deducirá de la cantidad
del crédito. De crédito (excluyendo gastos de envío) se dará sólo para las devoluciones de productos intactos hasta
30 días a partir de la fecha de envío. Después de 30 días a partir de la fecha de envío, no se aceptarán devoluciones.
Toda la mercancía devuelta es a riesgo del comprador y el costo. Especial orden y artículos personalizados no son
retornables. Los productos deben ser inspeccionados antes de la instalación y la instalación del producto, su
aceptación. Producto, una vez instalado, no pueden ser devueltos. Los daños se producen en la instalación no se
consideran defectos y no están sujetos a devolución o reembolso.
LACAVA LLC 9