INSTALLATION
Installation Overview
STEP 11. Connect a LSP wire labeled
“Line # A” to the circuit breaker
STEP 12. Connect a LSP wire labeled
“Line # B” to the load & turn circuit
on
STEP 13. Record circuit breaker
name and phase (A or B) with
corresponding LSP wire number
STEP 14. Repeat steps 10-13 until all
LSP Line # wires are connected
STEP 15. Connect & attach the 200A
CTs to the main service lines
STEP 16 (Optional). Connect &
attach the second pair of CTs to PV/
Solar generation output
STEP 17. Record the line name of the
corresponding attached CTs
STEP 18. Connect the LSP’s grid
voltage wires to an ATS or main
distribution panel
STEP 19. Replace the electrical panel
cover
STEP 1. Turn offmain feed & remove
the electrical panel cover
STEP 2 (Flush-mount Only). Cutout
& remove drywall for LSP access
STEP 3. Knock out a 2” hole in the
electrical panel
STEP 4. Measure & mark hole
locations for mounting the LSP
STEP 5 (Surface-mount Only).
Secure mounting brackets to the wall
STEP 6. Attach the LSP”s antenna and
guide the LSP’s wire whip through the
electrical panel
STEP 7. Secure the LSP to the wall/
bracket & electrical panel
STEP 8. Connect the LSP ground wire
to the ground bar
STEP 9. Connect the LSP power cable
harness
STEP 10. Select a circuit breaker, turn
it off& disconnect the load
5