
CONTENTS
i
Page
1 Before starting use .......................................................................................................................... 1-1
1.1 Using the instruction manuals ................................................................................................... 1-1
1.1.1 The details of each instruction manuals ............................................................................... 1-1
1.1.2 Symbols used in instruction manual .................................................................................... 1-2
1.2 Safety Precautions .................................................................................................................... 1-3
1.2.1 Precautions given in the separate Safety Manual ................................................................ 1-4
2 Unpacking to Installation .............................................................................................................................................................. 2-6
2.1 Confirming the product ......................................................................................................................................................... 2-6
2.2 Installation .................................................................................................................................................................................. 2-7
2.2.1 Unpacking ............................................................................................................................................................................ 2-7
2.2.2 Transportation procedures .......................................................................................................................................... 2-8
(1) Transporting with a crane ........................................................................................................................................ 2-8
(2) Transporting with a manual pallet jack ............................................................................................................... 2-9
2.2.3 Installation procedures ................................................................................................................................................ 2-10
2.2.4 Grounding procedures .................................................................................................................................................. 2-12
(1) Grounding methods ................................................................................................................................................... 2-12
(2) Grounding procedures ............................................................................................................................................. 2-12
2.2.5 Connecting with the controller ................................................................................................................................ 2-13
(1) CR750 controller ....................................................................................................................................................... 2-13
(2) CR751 controller ....................................................................................................................................................... 2-15
2.2.6 Ethernet Cables .............................................................................................................................................................. 2-17
(1) No.2 arm ........................................................................................................................................................................ 2-17
(2) Base area ...................................................................................................................................................................... 2-18
2.2.7 Passing air hoses and cables through the shaft ............................................................................................... 2-20
(1) Specifications of internal air hoses and cables ............................................................................................ 2-20
(2) Customer prepared products ............................................................................................................................... 2-20
(3) Installation procedure .............................................................................................................................................. 2-21
2.3 Setting the origin ................................................................................................................................................................... 2-23
2.3.1 Installing the teaching pendant (T/B) ................................................................................................................... 2-23
(1) CR750 controller ....................................................................................................................................................... 2-23
(2) CR751 controller ....................................................................................................................................................... 2-24
2.3.2 Setting the origin with the origin data input method ...................................................................................... 2-25
(1) Confirming the origin data ..................................................................................................................................... 2-25
(2) Turning ON the control power ............................................................................................................................. 2-25
(3) Preparing the T/B ..................................................................................................................................................... 2-26
(4) Selecting the origin setting method ................................................................................................................... 2-27
(5) Inputting the origin data ......................................................................................................................................... 2-28
(6) Installing the battery cover. .................................................................................................................................. 2-29
2.4 Confirming the operation .................................................................................................................................................... 2-30
(1) JOINT jog operation ................................................................................................................................................. 2-34
(2) XYZ jog operation ...................................................................................................................................................... 2-36
(3) TOOL jog operation .................................................................................................................................................. 2-38
(4) 3-axis XYZ jog operation ....................................................................................................................................... 2-40
(5) CYLNDER jog operation ......................................................................................................................................... 2-42
(6) Work jog operation ......................................................................................................... 2-44
3 Installing the option devices ..................................................................................................................................................... 3-51
3.1 Installing the solenoid valve set ...................................................................................................................................... 3-51
(1) Hand number and solenoid valve ports (common to RH-FH series) ................................................... 3-52
3.2 Installing the hand input cable ......................................................................................................................................... 3-53
3.3 Installing the hand output cable ...................................................................................................................................... 3-54
3.4 Changing the operating range .......................................................................................................................................... 3-55
(1) Operating range changeable angle ..................................................................................................................... 3-55
(2) The change method of the operating range ................................................................................................... 3-56
3.5 Hand internal wiring and piping set ................................................................................................................................ 3-57