
CONTENTS
ii
Page
3.4 Changing the operating range .......................................................................................................................................... 3-62
(1) Operating range changeable angle ..................................................................................................................... 3-62
(2) The change method of the operating range ................................................................................................... 3-63
3.5 Hand internal wiring and piping set ................................................................................................................................ 3-64
(1) Installation procedure .............................................................................................................................................. 3-64
(2) RH-6FH series ............................................................................................................................................................ 3-66
(3) RH-12FH/20FH series ............................................................................................................................................ 3-67
3.6 External Wiring and Piping Box ........................................................................................................................................ 3-68
3.7 Connector protection when the option devices are installed ............................................................................. 3-70
4 Basic operations ............................................................................................................................................................................ 4-72
5 Maintenance and Inspection ..................................................................................................................................................... 5-73
5.1 Maintenance and inspection interval ............................................................................................................................. 5-73
5.2 Inspection items ..................................................................................................................................................................... 5-74
5.2.1 Daily inspection items .................................................................................................................................................. 5-74
5.2.2 Periodic inspection ........................................................................................................................................................ 5-75
5.3 Maintenance and inspection procedures ..................................................................................................................... 5-76
5.3.1 Robot arm structure ..................................................................................................................................................... 5-76
5.3.2 Installing/removing the cover ................................................................................................................................... 5-77
5.3.3 Packing Replacement Procedure ............................................................................................................................ 5-79
(1) Packing Replacement Instructions ..................................................................................................................... 5-79
5.3.4 Inspection, maintenance and replacement of timing belt .............................................................................. 5-83
(1) Timing belt replacement period ......................................................................................................................... 5-83
(2) RH-6FH/12FH/20FH series: Inspecting/Adjusting the J3 axis timing belt ..................................... 5-84
(3) RH-6FH/12FH/20FH series: Replacing the J3 axis timing belt ............................................................ 5-85
(4) RH-6FH/12FH/20FH series: Inspecting/Adjusting the J4 axis timing belt ..................................... 5-87
(5) Timing belt tension ................................................................................................................................................... 5-90
5.3.5 Replacing the bellows ................................................................................................................................................... 5-91
5.3.6 Lubrication ........................................................................................................................................................................ 5-93
(1) Lubrication position and specifications ............................................................................................................ 5-93
(2) Lubrication method to the J1, J2 axis ............................................................................................................. 5-94
(3) Lubrication method to the shaft ......................................................................................................................... 5-95
5.3.7 Replacing the backup battery ................................................................................................................................... 5-97
(1) Replacing the battery (robot arm) ...................................................................................................................... 5-98
5.4 About Overhaul ...................................................................................................................................................................... 5-99
5.5 Maintenance parts .............................................................................................................................................................. 5-100
5.6 Resetting the origin ........................................................................................................................................................... 5-102
5.6.1 Mechanical stopper method ................................................................................................................................... 5-103
(1) J1 axis origin setting (mechanical stopper) ................................................................................................ 5-103
(2) J2 axis origin setting (mechanical stopper) ................................................................................................ 5-105
(3) J3 and J4 axis origin setting (mechanical stopper) ................................................................................. 5-107
(4) All axis origin setting ............................................................................................................................................. 5-110
5.6.2 Jig method ..................................................................................................................................................................... 5-111
(1) J1 axis origin setting ............................................................................................................................................. 5-112
(2) J2 axis origin setting ............................................................................................................................................. 5-114
(3) J3 and J4 axis origin setting ............................................................................................................................. 5-115
5.6.3 ABS origin method ..................................................................................................................................................... 5-116
(1) Select the T/B ........................................................................................................................................................ 5-118
5.6.4 User origin method ..................................................................................................................................................... 5-120
5.6.5 Recording the origin data ........................................................................................................................................ 5-122
(1) Confirming the origin data label ........................................................................................................................ 5-122
(2) Confirming the origin data .................................................................................................................................. 5-122
(3) Recording the origin data .................................................................................................................................... 5-122
(4) Installing the battery cover ................................................................................................................................ 5-122
6Appendix ............................................................................................................................................................................ Appendix-123
Appendix 1 : Configuration flag .......................................................................................................................... Appendix-123