Modulift CMOD 110 User manual

Other Modulift Spreader manuals

Modulift CMOD 34 User manual

Modulift

Modulift CMOD 34 User manual

Modulift CMOD 50 User manual

Modulift

Modulift CMOD 50 User manual

Modulift MOD 70 User manual

Modulift

Modulift MOD 70 User manual

Modulift CMOD 70 User manual

Modulift

Modulift CMOD 70 User manual

Popular Spreader manuals by other brands

Sami ST-1000 PTO user manual

Sami

Sami ST-1000 PTO user manual

PEQUEA GT-100 Operator's manual

PEQUEA

PEQUEA GT-100 Operator's manual

Epoke SKE8 instruction manual

Epoke

Epoke SKE8 instruction manual

GEA EL44 Instruction manual and installation instructions

GEA

GEA EL44 Instruction manual and installation instructions

Boss Snowplow TGS 800 owner's manual

Boss Snowplow

Boss Snowplow TGS 800 owner's manual

Fisher EMERSON 168 Series installation guide

Fisher

Fisher EMERSON 168 Series installation guide

Fisher POLY-CASTER 78601 owner's manual

Fisher

Fisher POLY-CASTER 78601 owner's manual

Fayat Group DYNAPAC S100 operation & maintenance

Fayat Group

Fayat Group DYNAPAC S100 operation & maintenance

Art's-Way Manufacturing X700 Operator's manual & parts list

Art's-Way Manufacturing

Art's-Way Manufacturing X700 Operator's manual & parts list

Ferris Pathfinder Series Operator's manual

Ferris

Ferris Pathfinder Series Operator's manual

Herculano H2RS9 instruction manual

Herculano

Herculano H2RS9 instruction manual

TurfEx RS7200 Owner's/operator's manual

TurfEx

TurfEx RS7200 Owner's/operator's manual

Nogueira RoyalFlow-600 instruction manual

Nogueira

Nogueira RoyalFlow-600 instruction manual

APV ES 100 M1 Classic Original operating instructions

APV

APV ES 100 M1 Classic Original operating instructions

BEFCO TURBO-HOP 301-300 Operator's manual

BEFCO

BEFCO TURBO-HOP 301-300 Operator's manual

H&S 5220 Operation manual

H&S

H&S 5220 Operation manual

Turfware TR460 Operation manual

Turfware

Turfware TR460 Operation manual

Anderson Manufacturing SS-2 Assembly & user manual

Anderson Manufacturing

Anderson Manufacturing SS-2 Assembly & user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

User Instructions
Modulift UK Ltd tel: +44(0)1202 621511 email: [email protected] www.modulift.com
The CMOD Spreader Frame is modular in span and every frame consists of 4 Corner Units,
with intermediate Struts that can be bolted into the assembly to achieve dierent spans.
 Personnel using this system should be suitably trained, competent and have a clear
understanding of Safe Slinging procedures.
 The use of Modulift equipment must be in accordance with the procedures laid down in
‘Lifting Operations and Lifting Equipment Regulations 1998’ (LOLER).
 Never exceed stated WLL – Adhere to WLL in Table 2 for particular sling angle used.
 The top sling length is critical to the safe use of the spreader – Ensure you refer to the correct table.
WARNING!
β = Sling to vertical angle (STV)
CMOD 110 Spreader Frame
CMOD 110 has an assembled span ranging from 2m by 2m to 16m by 16m and all spans inbetween.
CMOD 110 Frame Specication
 Rated at a maximum of 140 tonnes WLL.
Please see Table 2 for WLL at specic spans.
 ‘Sling to Vertical’ angle, β, 45 degrees or less.
 Corner Units are rated at 35 tonnes each
(140 tonnes combined capacity).
 Bolt tightening torque: 150Nm. Spanner size required: 30mm.
 Recommended additional equipment: Torque Wrench, Podger Spanner and Ring Spanner.
P7P2–P5
Span
β
P6
P1 P8
Table 1 – Component List
Part Ref. Description Weight/item
P1 Corner Unit(length 1m each) 495kg
P2 4.0m Strut 367kg
P3 2.0m Strut 212kg
P4 1.0m Strut 134kg
P5 0.5m Strut 96kg
P6 85t Shackle 62kg
P7 55t Shackle 40kg
P8 M20 x 65, Grade 8.8, HT Bolts, Nuts & Washers
Strut Corner Unit
Assembled
Frame
Fig. 1 – Typical CMOD Spreader Frame Assembly
Modulift UK Ltd tel: +44(0)1202 621511 email: [email protected] www.modulift.com
User Instructions
Should you nd your equipment is no longer of use,
please dispose of in a responsible manner. Please
contact Modulift if you need further guidance
Table 2 – Load v Span
First pick the span required for your frame (e.g.
2m x 5m) and the Sling Angle (we recommend 30°
STV where possible), then check the WLL via the
appropriate table. Read the table by locating the
lower span on the y axis of the chart and the larger
on the x. The cell which you are referred to, will
indicate the WLL for your chosen span. If your exact
span is not noted in the table, then please round up
or down to the values that will give you the lowest
WLL (to ensure no overloads are applied). Please
contact Modulift for conrmation on your WLL if
required. WLL given in tonnes.
© Copyright 2019 Modulift.
All rights reserved.
Assembly Procedure
 Check the ID plates on each Modulift component to
ensure the correct size is used.
 Lay out the Struts and Corner Units in the correct
conguration.
 Check that all anges are clear from debris, sand etc.
before connection.
 Bolt the components together* using bolts, nuts & washers
provided. Tighten the bolts to torque as shown overleaf.
 Loop the top Shackles through the bows of the Corner
Units so they contact ‘bow-to-bow’. The eye of the top
slings can then be passed through the jaws of the Shackles
and the pins replaced.
 Loop the bottom Shackles through the eyes of the drop
slings and connect to the bottom of the Corner Unit with
the Shackle pin.
 Attach the lower slings to the load to be lifted.
 The assembled Spreader Frame and lifting rig must be
thoroughly checked by a competent person prior to lifting.
*The use of a Podger Spanner will aid in assembly by helping
to align the bolt holes by forcing it through.
Do’s & Don’ts
 Do ensure that the frame is only loaded at the Corner Units
and they are all equally loaded.
 Do ensure enough clearance between frame and the load
to prevent the load hitting the frame. Any collision could
cause failure of the frame.
 Do not undertake a lift without the correct use of
appropriate top slings.
 Do not hang any loads from the Strut tube or anges.
 Do not exceed the stated WLL for your span.
 Do not rig the lower slings more than 6° from vertical.
WARNING!
 Do not under any circumstances hang load(s) from the
tube or anges – the Spreader Frame is designed for
compression – not bending.
 Ensure that the top Shackle contacts the bow of the corner
plate ‘bow-to-bow’.
 The CMOD system is designed in accordance with BS
EN13155: Cranes, Safety, Non- xed Load Lifting Attachments.
 Max number of Struts allowed in assembly: 5 per side
 Assemble longer Struts in the centre of the conguration
 Sling angle is crucial to safe use of frame.
 The top sling must be positioned centrally in the Shackle
pin to ensure even loading. Contact your Modulift
supplier for supply of loose spacers where required.
CMOD 110 Spreader Frame
CMOD 110 UK JAN 2019
Assembly Procedure
 Check the ID plates on each Modulift component to
ensure the correct size is used.
 Lay out the Struts and Corner Units in the correct
conguration.
 Check that all anges are clear from debris, sand etc.
before connection.
 Bolt the components together* using bolts, nuts & washers
provided. Tighten the bolts to torque as shown overleaf.
 Loop the top Shackles through the bows of the Corner
Units so they contact ‘bow-to-bow’. The eye of the top
slings can then be passed through the jaws of the Shackles
and the pins replaced.
 Loop the bottom Shackles through the eyes of the drop
slings and connect to the bottom of the Corner Unit with
the Shackle pin.
 Attach the lower slings to the load to be lifted.
 The assembled Spreader Frame and lifting rig must be
thoroughly checked by a competent person prior to lifting.
*The use of a Podger Spanner will aid in assembly by helping
to align the bolt holes by forcing it through.
Do’s & Don’ts
 Do ensure that the frame is only loaded at the Corner Units
and they are all equally loaded.
 Do ensure enough clearance between frame and the load
to prevent the load hitting the frame. Any collision could
cause failure of the frame.
 Do not undertake a lift without the correct use of
appropriate top slings.
 Do not hang any loads from the Strut tube or anges.
 Do not exceed the stated WLL for your span.
 Do not rig the lower slings more than 6° from vertical.
WARNING!
16 100
15 100 100
14 100 100 95
13 110 100 95 90
12 120 105 95 90 80
11 140 120 100 95 80 80
10 140 140 120 100 90 80 75
9140 140 140 120 95 85 75 75
8140 140 140 140 120 90 85 75 75
7140 140 140 140 140 120 90 80 75 75
6140 140 140 140 140 140 110 80 75 75 75
5140 140 140 140 140 140 120 90 80 75 75 75
4140 140 140 140 140 140 140 120 85 80 75 75 75
3140 140 140 140 140 140 140 120 110 85 80 75 75 70
2140 140 140 140 140 140 140 130 110 95 85 80 75 70 70
Span
(m) 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CMOD 110: WLL / tonnes @ 30° STV
16 60
15 60 58
14 70 58 55
13 75 70 55 55
12 85 75 65 55 50
11 85 85 70 60 50 50
10 85 85 85 70 60 50 45
995 85 85 80 65 55 50 45
895 95 85 85 70 60 55 45 45
795 95 95 85 80 70 60 50 45 45
695 95 95 90 80 80 70 55 50 45 43
595 95 95 95 85 80 75 65 55 47 43 43
495 95 95 95 95 85 80 75 60 50 45 43 43
395 95 95 95 95 95 80 75 65 55 48 45 43 40
295 95 95 95 95 95 95 80 75 60 50 48 45 40 40
Span
(m) 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CMOD 110: WLL / tonnes @ 45° STV