Motorline MBM8 User manual

MBM8 / MBM11- Barriers
Installer and User’s manual
v2.0
REV. 01/2014

00. CONTENT
INDEX STANDARDS TO FOLLOW
01.SAFETY INSTRUCTIONS
00. CONTENT
▷ index | page 01.A
01. SAFETY INSTRUCTIONS
▷ standards to follow | page 01.B
02. PACKAGE
▷ inside package | page 02.A
03. THE AUTOMATISM
▷ technical specifications | page 02.B
▷ opening / closing | page 03.A
04. INSTALATION
▷ installation site preparation | page 03.B
▷barrier’s fixation | page 04.B
▷ boom assembly | page 05.A
▷boom support installation | page 05.A
▷top cover removal | page 05.B
▷spring adjustment | page 06.A
▷ boom leveling | page 07.A
▷ limit-switch | page 07.B
05. CONTROL BOARD MC15 CONFIGURATION
▷ checking limit-switches connections | page 08.A
▷ barrier’s course configuration | page 08.B
▷ transmitters configuration | page 09.A
▷ pause time configuration | page 09.A
▷ condominium function and potenciometers | page 09.B
06. TROUBLESHOOTING
▷ final consumers instructions | page 10.A
▷ specialized technicians intructions | page 10.A
07. COMPONENTS TEST
▷ connections scheme | page 11.A
08. MAINTENANCE
▷ maintenance | page 11.B
09. CONTROL BOARD CONNECTIONS
▷ MOTORLINE MC15 control board | page 12.A
ATTENTION:
▷ To ensure the people’s safety, it is important that you read all the following
instructions.Incorrect installation or incorrect use of the product can cause physical
injury and material damage.
▷ Keep these instructions in a safe place for future reference.
▷ This product was designed and produced strictly for the use indicated in this
manual. Any other use, not expressly indicated here, could compromise the good
condition/operation of the product and/or be a source of danger.
▷ ELECTROCELOS SA is not responsible for the improper use of the product,
or other use than that for which it was designed.
▷
ELECTROCELOS SA is not responsible if safety standards were not taken into
account when installing the equipment, or for any deformation that may occur to it.
▷ ELECTROCELOS SA is not responsible for the safety and proper operation
when using components not sold by them.
▷ Do not make any modifications to the operator components and / or their
accessories.
▷ Beore installation unplug the automatism from the source of power.
▷ The installer must inform the client how to handle the product in case of
emergency and provide this manual to user.
▷ Keep remote controls away from children, to prevent the automated
system from being activated involuntarily.
▷ The customer shall not, under any circumstances, attempt to repair or tune
the operator .Must call qualified technician only.
▷ Connect the automatism to a 230V plug with ground wire.
▷ Automatism for outdoor use.
01.A 01.B

02. PACKAGE
INSIDE PACKAGE TECHNICAL SPECIFICATIONS
03.AUTOMATISM
Inside the package you will find the following components:
▷ 01 electromechanical barrier
▷01 MC15 control board
▷ 02 4channel MX4SP transmitter
▷01 aluminium boom
▷ 01 boom support
▷01 MF3 external photocells set
▷ 02 fastening metal plates
02.A 02.B
Electromechanical barrier
Alluminium
boom
Boom
support
Boom
support
fastening
screws
Boom
fastening
screws
Boom
cover
Control
board
M16 bolts
with
bushings
Fastening
metal
plates
Boom fastening
metal plate
User’s
manual
MX4SP
Transmitter
MF3
photocells
▷01 boom fastening metal plate
▷04 M16 bolts with bushings
▷ 04 boom fastening screws
▷02 boom support fastening screws
▷01 boom cover
▷ 01 installer and user’s manual
The specifications of the MBM8 and MBM11 barriers are:
The main dimensions of the MBM8 and MBM11 barrier are:
▷ Barrier’s Power Supply
▷ Motor’s Voltage
▷Power
▷Working temperature
▷
▷Working frequency
▷ RPM
▷ Noise level
▷ Opening / Closing time
▷ Current
AC 230V 50/60Hz
AC 230V
180W
-45°C to 65°C
120°C
Intense
2800 RPM
<60 db
6 s
1A
AC 230V 50/60Hz
AC 230V
300W
-45°C to 65°C
140°C
Intense
▷ Protection level IP55 IP55
480 RPM
<70 db
11 s
2A
Thermal protection
MBM8 MBM11
mm
mm
mm
mm
mm
MBM8 MBM11
mm
mm
mm
mm
mm

INSTALLATION SITE PREPARATION
03. AUTOMATISM
OPENING / CLOSING
04. INSTALLATION
03.A 03.B
It’s important that this order of installation is respected!
Otherwise we can’t assure the correct installation of the barrier and it may
not work properly.
1▷ Create a foundation in
cement on the soil. The dimen-
sions on the side image are the
minimum to maintain, so they
can be superiors but never
inferiors.
You must leave one or more
tubes for the cables of the
dierent components to pass
through the foundation to the
barrier (photocells, wall starts,
key selectors, etc).
In case of power failure, the barrier is equipped with a manual unlocking and locking
system. Follow the instructions bellow to unlock or lock the barrier.
1▷ Open the door using the key supplied
with the barrier. Rotate the key to unlock
the door and pull it towards outside.
On the interior, you will have access to the
unlocking system.
2▷ The unlocking is made by rotating the
disc at the bottom of the motor, highlight-
ed/shaded on the image on the side.
To open or close you must try to rotate the
disk clockwise or counter-clockwise, that
depending on the orientation of the barrier
(right or left) will open or close the boom.
20mm
(height of
foundation
above soil)
500 mm
(total height
of
foundation)
350mm
450mm
20mm
(height of
foundation
above soil)
500 mm
(total height
of
foundation)
400mm
550mm
Foundation in cement for MBM8 barrier
Foundation in cement for MBM11 barrier

To note that each barrier has its own measures to create the holes for the bolts!
04. INSTALLATION
INSTALLATION SITE PREPARATION INSTALLATION SITE PREPARATION
04. INSTALLATION
04.A 04.B
1▷ With the bolts already fixed on the
cement foundation, respecting the
dimensions of point 2, place the barrier on
top of the foundation in a way that the
screws stay inside and centered with the
barrier.
2▷ Open the door using the key to unlock
it, and pull it to the outside.
3▷ Place the fastening metal plates and fix
the barrier to the ground tightening the
nuts supplied with the product.
ALTERNATIVE▷ During installation, you can replace
the bolts supplied by metal hooks, soldering them on
the cement foundation while it is still fresh.
You must pay attention to the above image’s dimen-
sions when placing the hooks.
2▷ Solder the bolts with bushings on
the foundation while the cement is
still fresh.
It is also necessary to respect the
dimensions on the side image when
soldering the bolts, so that the barrier
can be installed.
130 a 175mm
130 a 160mm
150 a 290mm
150 a 200mm
350mm
Foundation in cement for MBM8 barrier
Foundation in cement for MBM11 barrier

04. INSTALLATION
BOOM SUPORT INSTALLATION
BOOM ASSEMBLY
TOP COVER REMOVAL
04. INSTALLATION
05.A 05.B
To assemble the boom, you must place
the boom on the barrier fixing plate
and align the four holes on each piece.
Then, you just need to place the boom
fastening metal plate and use the
screws to fasten the three parts
together.
After assembling the boom, you must define the length of it so that you can fix the
boom support, as visible on the image above.
When the boom’s length is decided, fix it with the two small screws situated at the end
of the fix part of the boom.
When the position of the boom’s support
is defined, you can fix it to the ground.
Make two holes on the fixing ground, and
place the screws supplied.
Align the support holes with those same
screws and fasten the support using the
nuts.
1▷ Open the door using the key supplied
to unlock it and then pull it to the
outside.
2▷ Rotate the rod (image above) to
unlock the cover.

04. INSTALLATION
SPRING ADJUSTMENT
04. INSTALLATION
06.A 06.B
1▷ Remove the screw A.
2▷ Put the boom like on phase 1 as shown
on the above image. Let it go and it must
maintain on that position, or rising very
slowly. If the boom starts to descend or rise
adjust the springs untill you can make the
boom become stabilized.
3▷ Put the boom like on phase 2, phase 3,
phase 4 and phase 5 and repeat the same
process of point 2 for each phase. With the
adjustment of the springs, you must achieve
a stage where you can let go the boom in
each position you desire and it must stay
stabilized. The springs must be calibrated to
sustain the total wheight of the boom
without the help of the motor.
4▷ Refit the screw A.
Before starting the tuning of
the springs is necessary to
remove the screw identified in
the illustration.
ADJUSTMENT▷ To adjust the springs,
you must use a wrench to fasten or
release the springs nuts. If you rotate
them clockwise you are giving tension to
the springs causing the boom to rise up,
and rotating counterclockwise you are
removing tension from the springs
causing the boom to descend.
3▷ The hooks that secure the top cover
are also rotated and release the cover.
4▷ Pull the cover up to remove it.
fase 4
fase 5
fase 3
fase 2
fase 1
screw A 6500 mm
7000 mm
8000 mm
11000 mm
7500 mm
1 spring de Ø 5mm with adjustment to 2 cm
2 springs de Ø 6mm with adjustment to 2,5 cm
2 springs de Ø 5mm with adjustment to 4,5 cm
2 springs de Ø 6mm with adjustment to 5,5 cm
no need to adjust the springs
2 springs de Ø 5mm with adjustment to 3 cm
2 springs de Ø 6 mm with adjustment to 3 cm
1 spring de Ø 5mm with adjustment to 3 cm
3 springs de Ø 6 mm with adjustment to 3 cm
3
4
4
4
4
Boom Length Number
of springs
Spring’s Length and
Steel Diameter
For the correct operation of the barrier, please pay attention to the information in the
table:

LIMIT-SWITCHES
04. INSTALLATION
BOOM LEVELING
07.A 07.B
After installing the barrier, you must verify the position of the boom while closed. If it
isn’t aligned horizontally when closed, follow the instructions bellow to adjust it.
Barrier’s interior:
1▷ Loosen the nuts of the extensible arm
shown in the image of the barrier’s interior.
2▷ Insert a small rod on the hole located on
the extensible arm so you can rotate it
more easily.
3▷ To level the boom when closed, you just
need to rotate the extensible arm. If you
rotate to the direction shown by the arrow
of the image, you are reducing it’s size and
causing the boom to rise. If you rotate on
the other direction, you are increasing it’s
size causing the boom to descend.
4▷ When the boom is leveled, you must
fasten the nuts of the extensible arm to
lock it’s length. This will prevent the arm to
accidentally increase or decrease during the
normal usage of the barrier.
NOTE▷ The development of all mechanical
parts was made to assure an opening
degree of 90° in whatever leveling position
you adjust the boom. This means that if you
align it horizontally when closed, it will be
vertically aligned when openned.
(Horizontal level)
You should disconnect the barrier from the electric power. This way there
will be no risk of activating and an accident occurs.
04. INSTALLATION
The mechanical limit-switches of the barrier
are shown on the image on the left.
They consist of two rings fixed to the boom’s
rotation shaft, that when openning or
closing will activate the micro-switches also
installed. This will cause the control board to
stop the barrier when the micro-switches
are activated, one for each type of maneu-
vers.
Adjust limit-switches:
1▷ Slightly loosen the screw of the ring you
want to adjust, so it becomes easier to
move.
2▷ Rotate it to the desired position, so it can
activate the micro-switch and stop the
boom on the correct position.
3▷ Fasten the ring’s screw you’ve adjusted to
fix it on that position.
NOTE: When adjusting the limit-switches you must also need to adjust the mechanical
stoppers.
The mechanical stoppers shown in the image on the side, were developed to limit the
movement of the arms inside the barrier’s body.
After adjusting the limit-switches, you must need to adjust the stoppers so that the
arm shaded on the image touches them as soon as the micro-switches are activated.
This will cause the stoppers to hold the boom’s weight when it gets to end of course.
To make the adjustments, you just need to loosen the bolts that fix them, rotate them
and fasten the bolts to fix them on that position.

BARRIER’S COURSE CONFIGURATION CHECKING LIMIT-SWITCHES CONNECTIONS
All the programming process must be made with the control board
connected to a 230V power supply.
After you check the connections, you must check if the
limit-switches are working properly.
▶ Check limit-switches:
1▷ Unlock the barrier (see page 03.A) and move it manually
to middle course (45º).
2▷ Verify if the LEDs FCH e FAP are ON. If not, check the
connections. When both LEDs are ON, go to next step.
3▷ Manually close the barrier and LED FCH must switch
OFF.
4▷ Manually open the barrier and LED FAP must switch
OFF.
If the LEDs don’t switch OFF as explained it means that
their cables are badly connected. Switch the cables of
the terminals 7 and 9 of CN3 connector.
05. MC15 CONTROL BOARD CONFIG
08.A
The first step to program the control board is to verify all connections of the various
components. Please verify the scheme of the connections on the page 12.A
Openned:
- the LED FAP must
switch OFF and
the LED FCH
must keep
ON.
Closed:
- the LED FCH must switch OFF
and the LED FAP must keep ON.
Middle course:
- the LEDs FAP e FCH
must keep ON.
08.B
05. MC15 CONTROL BOARD CONFIG
WARNING: If the boom starts opening, release the SET key, switch the cables of
the terminals 5 and 7 of CN2 connector and restart this programming.
▶ Programming the barrier’s course:
1▷ Unlock the barrier (see page 03.A).
2▷ Place the boom manually at middle course and lock the barrier.
3▷Press the SEL key and the LED CODE will start to blink. Press again the SEL key as
many times as you need untill the LED PGM AUTO starts blinking.
4▷ Press and hold SET key and the boom must start to close!
5▷ Let the barrier close, open and close once again automatically, always keeping
the SET key pressed.
6▷ Once the barrier finishes closing for the second time, the LED PGM AUTO will stay
ON permanently and the LED T.MOTOR will start to blink. Release SET key and wait
10seconds until the LED T.MOTOR stops from blinking.
7▷ The programming is now complete and you can use the barrier normally.
PGM AUTO
SEL
SET
The LEDs BL e DS must be both ON so that the barrier can work properly.
If they are not, check the connections of the security devices. In case you
don’t use any security device, please close all circuits with shunts.
You must start the configuration with both potenciometers at middle
adjustment. The final adjustment will be made after programming the barri-
er’s course.

CODE
T.PAUSA
SEL
SET
Once you have the barrier’s course configured, you can now program the transmitters:
▶ Programming transmitters:
1▷ Press the SEL key once and the LED CODE will start blinking.
2▷ Press the transmitter key once if you want to operate the barrier.
3▷ When pressing the transmitter key, the LED CODE must turn and stay ON signaling
the success of the configuration.
If the LED CODE doesn’t stay ON, the transmitter was not programmed. Please
repeat the same steps to try once again.
NOTE: To program several transmitters, repeat the same steps above for each one of
the transmitters.
05. MC15 CONTROL BOARD CONFIG
TRANSMITTERS CONFIGURATION
PAUSE TIME CONFIGURATION
09.A 09.B
CMD AP
Sensibility
Force
05. MC15 CONTROL BOARD CONFIG
The pause time is the time that the barriers stays paused since it completes the
opening maneuver until it starts to close automatically.
▶ Programming the pause time in automatic mode:
1▷ Press the SEL key once and the LED CODE will start blinking. Press again the SET key
as many times as you need until the LED T.PAUSA starts blinking.
2▷ Press SET once and wait as much time as you want for pause time.
3▷ Press SET once and the pause time is defined.
CONDOMINIUM FUNCTION AND POTENTIOMETERS
The condominium function of this control board causes the barrier to only accept
opening orders. When the barrier is closed, if you press the transmitter’s key to open, it
will start openning, but during the openning maneuver or when it is already openned, if
you try to close it, the control board won’t accept it.
This causes the barrier to only close automatically.
▶ Activate and deactivate condominium function:
1▷ Press the SEL key and the LED CODE will start blinking. Press again the SET key as
many times as you need until the LED CMD AP starts blinking.
2▷ Press SET to confirm.
3▷If the LED CMD AP stays ON it means that the function is activated, and if it stays
OFF it means that the function is deactivated.
▶ Adjust sensibility and force potentiometers:
The force potentiometer controls the force of the motor when opening and closing.
The sensibility potentiometer controls the sensibility of the control board when
detecting obstacles. The more sensitive it is the quicker it will detect any obstacle
during it’s course and invert the orientation of working of the motor.
1▷ To adjust potentiometers, run them with a small screwdriver. Turning to the right
side, will increase and turning to the left will decrease.
NOTE: Everytime you make an adjustment to the force potentiometer, you must
perform a new barrier’s course configuration (see page 08.B).

INSTRUCTIONS FOR INSTALLERS
06. TROUBLESHOOTING
INSTRUCTIONS FOR FINAL USERS
10.A
▷ Barrier
doesn’t move
but makes
noise
▷ Unlock barrier and
move boom by hand
to check for
mechanical problems
on the movement.
▷ Unlock barrier and
move boom by hand
to check for
mechanical
problems on the
barrier.
▷ Barrier
opens but
doesn’t close
▷ Barrier
doesn’t make
complete
route
▷ Unlock motor and
move boom by hand
to closed position.
Lock motor again and
turn o power supply
for 5 seconds.
Reconnect it and
send order to open
barrier using
transmitter.
▷ Encountered
problems?
▷ Barrier
opened but
didn’t close
again
▷ Boom moves
easily?
▷ Consult a qualified
MOTORLINE technician.
▷ Consult a qualified
MOTORLINE technician.
1 ▷ Check all motion axis and associated motion systems related with the barrier to find out what is the problem.
1 ▷ Check all motion axis and associated motion systems related with the barrier to find out what is the problem.
1 ▷ Check if there is any
obstacle in front of the
photocells;
2 ▷ Check if any of the
control devices (key
selector, push button, video
intercom, etc.) of the
barrier are jammed and
sending permanent signal
to control unit;
3 ▷ Consult a qualified
MOTORLINE technician.
Anomaly Procedure Behavior Procedure II Discovering the origin of the problem
▷ Barrier
doesn't work
▷ Make sure you
have 230Vpower
supply connected to
operator and if it is
working properly.
▷ Still not
working
▷ Consult a qualified
MOTORLINE technician.
▷ Consult a qualified
MOTORLINE technician.
▷ Consult a qualified
MOTORLINE technician.
▷ Encountered
problems?
▷ Boom moves
easily?
1 ▷ Open control box and check if
it has 230V power supply;
2 ▷ Check input fuses;
3 ▷ Disconnect barrier from
control board and test them by
connecting directly to power
supply in order to find out if they
have problems
(see page 11.A).
4 ▷ If the barrier works, the
problem is on the control board.
Pull it out and send it to our
MOTORLINE technical services
for diagnosis;
5▷ If the barrier doesn’t work,
remove them from installation
site and send to our MOTORLINE
technical services for diagnosis.
1 ▷ Check capacitors, testing with
new capacitors;
2 ▷ If capacitors are not the
problem, disconnect motor from
control board and test it by
connecting directly to power
supply in order to find out if it is
broken;
3 ▷ If the motor doesn’t work,
remove it from installation site
and send to our MOTORLINE
technical services for diagnosis.
4 ▷ If motor work well and move
barrier at full force during the
entire course, the problem is
from the controller. Set force
using trimmer on the board.
Make a new working time
programming, giving suffient
time for opening and closing with
appropriate force (page 08.B of
this manual for MBM8/MBM11
230V).
5 ▷ If this doesn’t work, remove
control unit and send it to
MOTORLINE technical services.
NOTE: Setting force of the
controller should be sufficient to
make the barrier open and close
without stopping, but should
stop and invert with a little effort
from a person.
In case of safety systems failure,
the barrier shall never cause
physical damaged to obstacles
(vehicles, people, etc.).
All MOTORLINE control boards have LEDs
that easily allow to conclude which devices
are with anomalies.
All safety devices LEDs (DS) in normal
situations remain On.
All "START" circuits LEDs in normal situations
remain Off.
If LEDs devices are not all On, there is some
security systems malfunction (photocells,
safety edges), etc.
If "START" circuits LEDs are turn On, there is
a control device sending permanent signal.
A) SECURITY SYSTEMS:
1 ▷ Close with a shunt all safety systems on
the control board (check manual of the
control board in question).
If the automated system starts working
normally check for the problematic device.
2 ▷ Remove one shunt at a time until you
find the malfunction device .
3 ▷ Replace it for a functional device and
check if the motor works correctly with all
the other devices. If you find another one
defective, follow the same steps until you
find all the problems.
B) START SYSTEMS:
1 ▷ Disconnect all wires from START terminal
input (terminal 3 of CN3 connector).
2 ▷ If the LED turned Off, try reconnecting
one device at a time until you find the
defective device.
NOTE:
In case procedures described in sections A)
and B) don’t result, remove control board
and send to our technical services for
diagnosis.
1 ▷ Check capacitors, testing
operator with new capacitor;
2 ▷ If capacitors are not the
problem, disconnect motor from
control board and it them by
connecting directly to power
supply in order to find out if it has
problems (see page 11.A).
3 ▷ If the motor works, the
problem is from control board.
Pull it out and send it to our
MOTORLINE technical services
for diagnosis;
4 ▷ If the motor doesn’t work,
remove them from installation
site and send to our MOTORLINE
technical services for diagnosis.

IMPORTANT: All tests must be made by qualified technicians due to the serious
danger related to the incorrect use of electronic systems!!
These maintenance procedures must be realized every year to assure the well
functioning of the automatism.
07. COMPONENT TEST
MAINTENANCE
08. MAINTENANCE
11.A 11.B
CONNECTIONS SCHEME
Check tightness of the screws that fix the
boom to the barrier’s body.
Check if the fastening metal plates didn’t
suer any modification with the consistent
utilization to assure the proper functioning
of the barrier.
To detect which are the components with problems in barrier’s installation, sometimes
it will be needed to run some tests with direct connection to a 230Vpower supply. For
that, it’s necessary to interpolate a 16µF capacitor in between the connection for the
barrier to operate.
At the bellow scheme, it’s shown how the connection must be done interpolating the
dierent device’s cables.
NOTES:
▷ To run the test you don’t need to remove the barrier from the installation site where it
is installed. This way you can more easily find out if the barrier, connected directly to the
power supply, works properly.
▷ The order to connect the capacitor’s cables on the barrier’s cables is not important.
You just have to connect one on the Brown cable and the other on the Black cable.
▷ The common cable of the barrier must always be connected to the power supply.
▷ To invert the operating direction, you just need to change the Black cable with the
Brown cable of the barrier, on the connection to the power supply.
Common (Blue)
POWER
SUPPLY
230V
BARRIER
CAPACITOR
16µF
Black
Brown
ground wire

09. CONTROL BOARD CONNECTIONS
CENTRAL MC15 MOTORLINE
12.A
V+
R
G
B
RG
(or)
DV 12/24V
~ ~
LPE N DS
Power
Supply
Capacitor
16µF
At BL, you can connect a STOP
switch button. Everytime it is
switched OFF, it will stop the
barrier in the position it is at
that precise moment.
Flashing
Light
Barrier
Wall Button/
Key Selector Barrier’s
Flashing Light
Antenna
Photocells
230V LAMP
230V MOTORE 1
AP COM CH
1234567
+V ENC
123
VPUL FAP FCHBL DS
1 2 3 4 5 6 7 10 118 9
24V
OUT 4
OUT 3
OUT 2
OUT 1
1 2 3 4 5
1 2
PUL
LEDs
BL DS FAP FCH
F2=160mAL250V
F1=6,3TL250V
CODE
CODE P.
CMD AP.
RX - Receiver
L CORT.
PGM. AUT
T. MOT
T. MOT. P
T. PAUSA
SET
CN8
RR1
CN9
SEL
- SENS.+
- FORCE +
CN1 CN2 CN3 CN5
CN4
OPEN
CLOSE
Limit-Switches
DV NCCOM
12/24V
~ ~
This manual suits for next models
1
Table of contents
Popular Control System manuals by other brands

Dungs
Dungs MPA 41 PF Series manual

Mitsubishi Electric
Mitsubishi Electric C80 Series instruction manual

Whelen Engineering Company
Whelen Engineering Company Core-C CCP9 quick start guide

Stryker
Stryker SwitchPoint Infinity 3 Operation and maintenance manual

Trane
Trane CCUN 205-211 user guide

Stulz
Stulz CompTrol 1002 manual