Muller Elektronik DRILL-Control User manual

Installation and operating instructions
DRILL-Control
Version: V3.20151130_rev.2
30283620-02-EN
Read and follow these operating instructions.
Keep these operating instructions in a safe place for later
reference.

Company details
Installation and operating instructions
Product: DRILL-Control
Document number: 30283620-02-EN
As of software version: 0.0.17.0
Original language: German
Müller-Elektronik GmbH & Co.KG
Franz-Kleine-Straße 18
33154 Salzkotten
Germany
Phone: ++49 (0) 5258 / 9834 - 0
Fax: ++49 (0) 5258 / 9834 - 90
Email: info@mueller-elektronik.de
Homepage: http://www.mueller-elektronik.de
Document
Copyright ©

Contents
30283620-02-EN
V3.20151130_rev.2
3
Contents
1
For your safety
6
1.1
Basic safety instructions
6
1.2
Intended use
6
1.3
Layout and meaning of warnings
6
1.4
Disposal
7
2
About the on-board integrated display/controller
8
2.1
Functions of the on-board integrated display/controller
8
2.2
System overview
8
2.3
Overview of keys
9
2.4
Information on the nameplate
9
3
About these Operating Instructions
11
3.1
Who is the target user for these Operating Instructions?
11
3.2
Scope of the instructions
11
3.3
Directional information in these instructions
11
3.4
Layout of operating instructions
11
3.5
Layout of references
11
4
Mounting and installation
13
4.1
Installing the on-board integrated display/controller
13
4.2
Installing the sensors on the implement
13
4.2.1
Installing the revolution sensors
14
4.2.2
Installing the fill level sensor
15
4.2.3
Installing the working position sensors
16
4.2.4
Installing the speed sensor
17
5
Basic control principles
19
5.1
Switching on the on-board integrated display/controller
19
5.2
Layout of the work screen
19
6
Configuring the basic settings of the on-board integrated display/controller
21
6.1
Setting the date / time
21
6.2
Setting the brightness
21
6.3
Selecting the language
21
7
Operating the implement on the field
23
7.1
Setting target rate
23
7.2
Performing a calibration
23
7.3
Filling metering cells with seed
24
7.4
Start seeding
24
7.5
Stop seeding
25

Contents
4
V3.20151130_rev.2
30283620-02-EN
7.6
Adjusting the target rate during operation
25
7.7
Using tramline control
25
7.7.1
Configuring the tramline control
26
7.7.2
Determining the machine type
26
7.7.3
Selecting tramline rhythm
27
Creating an even tramline rhythm
28
Creating uneven tramline rhythms
32
Creating special tramline rhythms
33
7.7.4
Programming individual tramline rhythms
36
7.8
Operating the hydraulic system with the job computer
36
7.8.1
Operating bout markers
36
7.8.2
Using the waterhole mode
37
7.9
Viewing results
38
7.9.1
Results
38
7.9.2
Total results
38
8
Configuring the on-board integrated display/controller for work
40
8.1
Selecting and configuring the speed source
40
8.1.1
Calibrating the speed sensor with the 100m method
40
8.1.2
Entering the simulated speed
41
8.2
Associating products with a hopper
41
9
Configuring the implement equipment
42
9.1
General information on the configuration
42
9.1.1
Performing the configuration
42
9.1.2
Layout of the configuration screen
42
9.1.3
Sequence of the configuration
43
9.1.4
Configuration of individual implement parts
43
9.2
Configuration of the implement
44
9.2.1
"Number of rows" parameter
44
9.2.2
"Tramline system" parameter
44
9.2.3
"Bout marker" parameter
44
9.2.4
"Waterhole Mode" parameter
44
9.3
Configuration of the hopper
44
9.3.1
"Upper Level Sensor" parameter
44
9.3.2
"Lower Level Sensor" parameter
44
9.4
Configuration of the metering units
44
9.4.1
"Gear ratio" parameter
45
9.4.2
"Pre-start time" parameter
45
9.4.3
"Early Stop Time“ parameter
45
9.5
Configuration of the rows
45
9.5.1
"Associated tramline" parameter
45
9.6
Configuration of the sections
45
9.6.1
"Working width" parameter
46
10
Using the system functions of the on-board integrated display/controller
47
10.1
Creating screenshots
47
10.2
Exporting a configuration
47

Contents
30283620-02-EN
V3.20151130_rev.2
5
10.3
Importing a configuration
47
10.4
Updating the on-board integrated display/controller
48
11
Troubleshooting
49
11.1
Performing diagnostics
49
11.2
Checking the version numbers
51
11.3
Alarm messages
51
12
Technical specifications
54
12.1
Technical specifications of the on-board integrated display/controller
54
12.2
Connector pin assignment
55
12.2.1
8-pin flange socket
55
12.2.2
39-pin multipole connector
55
12.3
Hydraulic system of the implement
56
13
Explanation of the signals in the assignment plan
57
14
Notes
58

1
For your safety
Basic safety instructions
6
V3.20151130_rev.2
30283620-02-EN
For your safety
Basic safety instructions
Please read the following safety instructions carefully before using the product for the first time.
▪Read the operating instructions to the agricultural device which you want to control by using the
product.
▪Do not make any unauthorized modifications to the product. Unauthorized modifications or use
may impair safety and reduce the service life or operability of the unit. Modifications are
considered unauthorized if they are not described in the product documentation.
▪Never remove any safety mechanisms or stickers from the product.
▪The product does not include any user serviceable parts. Do not open the casing.
▪Before you leave the vehicle cabin, ensure all automatic mechanisms are deactivated or manual
mode is activated.
▪Before charging the tractor battery, always disconnect the tractor from the job computer.
▪Keep children away from the implement and from the job computer.
Intended use
The job computer is only intended for use in the agricultural sector. The manufacturer is not liable for
any other installation or use of the job computer.
The manufacturer cannot be held liable for any personal injury or property damage resulting from
such non-compliance. All risk arising from improper use lies with the user.
Intended use also includes compliance with the conditions for operation and repairs prescribed by the
manufacturer.
All applicable accident prevention regulations and all other generally recognized safety, industrial,
and medical standards as well as all road traffic laws must be observed. Any unauthorized
modifications made to the equipment will void the manufacturer's warranty.
Layout and meaning of warnings
All safety instructions found in these Operating Instructions are composed in accordance with the
following pattern:
WARNING
This signal word identifies medium-risk hazards, which could potentially cause death or serious
physical injury, if not avoided.
CAUTION
This signal word identifies low-risk hazards, which could potentially cause minor or moderate
physical injury or damage to property, if not avoided.
1
1.1
1.2
1.3

For your safety
Disposal
1
30283620-02-EN
V3.20151130_rev.2
7
NOTICE
This signal word identifies actions which could lead to operational malfunctions if performed
incorrectly.
These actions require that you operate in a precise and cautious manner in order to produce
optimum work results.
There are some actions that need to be performed in several steps. If there is a risk involved in
carrying out any of these steps, a safety warning will appear in the instructions themselves.
Safety instructions always directly precede the step involving risk and can be identified by their bold
font type and a signal word.
1. NOTICE! This is a notice. It warns that there is a risk involved in the next step.
2. Step involving risk.
Disposal
When it has reached the end of its service life, please dispose of this product as
electronic scrap in accordance with all applicable waste management laws.
Example
1.4

2
About the on-board integrated display/controller
Functions of the on-board integrated display/controller
8
V3.20151130_rev.2
30283620-02-EN
About the on-board integrated display/controller
Functions of the on-board integrated display/controller
DRILL-Control is an on-board integrated display/controller.
A job computer is built into the on-board integrated display/controller, which can control the work of
seeders. When a job computer is mentioned within these instructions, it always refers to the DRILL-
Control on-board integrated display/controller.
Among other things, the on-board integrated display/controller can perform the following tasks:
▪Monitoring of the metering shaft
▪Control of the bout marker
▪Control of the tramline valves
▪Starting the calibration using the calibration button
▪Control of the half width shutoff system
▪Control of the pre-emergence marker
▪Monitoring of the fan speed
System overview
The following diagram shows an example of how an implement can be structured:
DRILL-Control
Tramline valve
Cable harness
Revolution sensor
Calibration button
Radar sensor
Fill level sensor
Bout marker
Fill level sensor
Work position sensor
Electrical metering drive
Pre-emergence marker
2
2.1
2.2

About the on-board integrated display/controller
Overview of keys
2
30283620-02-EN
V3.20151130_rev.2
9
Overview of keys
DRILL-Control on-board integrated display/controller
Keys
Function
Switches the on-board integrated
display/controller on and off.
Confirms entries.
Creates screenshots.
Navigate within individual screens.
...
Performs the function shown on the screen.
Information on the nameplate
A rating plate can be found on the casing of the on-board integrated display/controller. The rating
plate clearly identifies the on-board integrated display/controller.
2.3
2.4

2
About the on-board integrated display/controller
Information on the nameplate
10
V3.20151130_rev.2
30283620-02-EN
Information on the nameplate
Client’s item number
If the product was manufactured for an
agricultural machinery manufacturer, the
agricultural machinery manufacturer's item
number will be shown here.
Operating voltage
The product may only be connected to
voltages within this range.
Hardware version
Software version at the time of delivery.
If you update the software, this version will no
longer be up-to-date.
Müller-Elektronik item number
Serial number

About these Operating Instructions
Who is the target user for these Operating Instructions?
3
30283620-02-EN
V3.20151130_rev.2
11
About these Operating Instructions
Who is the target user for these Operating Instructions?
These Operating Instructions are intended for operators of seeders equipped with the DRILL-Control
on-board integrated display/controller manufactured by Müller-Elektronik.
Scope of the instructions
These instructions describe all of the functions that can be actuated with the on-board integrated
display/controller. This means that some chapters may not be relevant for the operation of certain
implements.
Directional information in these instructions
All directional information in these instructions, such as "left", "right", "forward", "back", is relative to
the movement direction of the vehicle.
Layout of operating instructions
The operating instructions explain step by step how you can perform certain operations with the
product.
We use the following symbols throughout these Operating Instructions to identify different operating
instructions:
Type of depiction
Meaning
1.
2.
Actions that must be performed in succession.
⇨
Result of the action.
This will happen when you perform an action.
⇨
Result of an operating instruction.
This will happen when you have completed all
steps.
Requirements.
In the event that any requirements have been
specified, these must be met before an action
can be performed.
Layout of references
If any references are given in these Operating Instructions, they will appear as:
Example of a reference: [➙11]
3
3.1
3.2
3.3
3.4
3.5

3
About these Operating Instructions
Layout of references
12
V3.20151130_rev.2
30283620-02-EN
References can be identified by their square brackets and an arrow. The number following the arrow
shows you on what page the section starts where you can find further information.

Mounting and installation
Installing the on-board integrated display/controller
4
30283620-02-EN
V3.20151130_rev.2
13
Mounting and installation
Installing the on-board integrated display/controller
DRILL-Control - rear view
Attachment for the bracket.
8-pin flange socket.
ASD interface for the use of SECTION-
Control.
Power connection cable
For connection to the battery connection
cable.
USB port
To connect a USB memory device.
39-pin multipole connector
To connect the junction box.
1. Screw the bracket onto the on-board integrated display/controller.
2. Attach the bracket with the on-board integrated display/controller in the vehicle cab
3. Connect the on-board integrated display/controller with the junction box.
4. Connect the power connection cable with the battery connection cable.
Installing the sensors on the implement
The following sensors can be installed on the implement:
Purpose
Sensor type –according to the operating
mode
Revolution sensor
Hall element sensor
Fill level sensor
Capacitive sensor
Work position sensor
Reed contact sensor
Vehicle speed sensor
Radar sensor
4
4.1
Procedure
4.2

4
Mounting and installation
Installing the sensors on the implement
14
V3.20151130_rev.2
30283620-02-EN
Installing the revolution sensors
Hall element sensors are suitable as revolution sensors.
Functional principle
The Hall element establishes a connection between the green and the white cable cores. To do so,
the magnet must be held with the red side in front of the blue cap on the sensor.
Schematic overview
Min. 25 mm
Attachment angle
Distance 5-10 mm
Sensor (blue cap)
Ring with magnets
4.2.1

Mounting and installation
Installing the sensors on the implement
4
30283620-02-EN
V3.20151130_rev.2
15
Connector pin assignment
3-pin AMP connector
Pin
Cable color
Designation
1
white
0VE
2
brown
12VE
3
green
Signal
Spare part number
Item number
Designation
30303623
Hall element sensor with 3-pin AMP connector, switching distance: 5-10 mm
Installing the fill level sensor
Capacitive sensors are suitable as fill level sensors.
Functional principle
A signal is sent when the flat upper side of the sensor is covered, e.g. with seed.
Schematic overview
Flat upper side of the sensor
LED; shows whether the sensor reacts
Capacitive sensor
Wire ferrules
Adjustment screw to change the reacting
distance
4.2.2

4
Mounting and installation
Installing the sensors on the implement
16
V3.20151130_rev.2
30283620-02-EN
Connector pin assignment
3-pin AMP connector
Pin
Cable color
Designation
1
blue
0VE
2
brown
12VE
3
black
Signal
Spare part number
Item number
Designation
30303650
Capacitive sensor with 3-pin AMP connector
Installing the working position sensors
Reed contact sensors are suitable as working position sensors.
Functional principle
A signal is sent when the red side of a magnet is held in front of the red cap of the sensor. This
creates a connection between the signal wire and the ground wire of the sensor.
4.2.3

Mounting and installation
Installing the sensors on the implement
4
30283620-02-EN
V3.20151130_rev.2
17
Schematic overview
Min. 25 mm
Attachment angle
Distance 15-25mm
Sensor (red cap)
South pole of the magnet (red side)
Magnet (nonmagnetic attachment, e.g. V2A,
copper, brass)
Connector pin assignment
3-pin AMP connector
Pin
Cable colour
Designation
1
white
0VE
2
brown
3
green
Signal
Spare part number
Item number
Designation
30303615
Reed contact sensor with AMP plug
Installing the speed sensor
Radar sensors are suitable as speed sensors.
Consult the operating instructions for the radar sensor to find out how it has to be installed.
4.2.4

4
Mounting and installation
Installing the sensors on the implement
18
V3.20151130_rev.2
30283620-02-EN
Spare part number
Item number
Designation
30258321
Vansco type 740 radar sensor with 1 m cable and with 3-pin AMP connector

Basic control principles
Switching on the on-board integrated display/controller
5
30283620-02-EN
V3.20151130_rev.2
19
Basic control principles
Switching on the on-board integrated display/controller
You have installed the on-board integrated display/controller. [➙13]
1. - Switch on the on-board integrated display/controller.
⇨The work screen appears.
Layout of the work screen
The work screen is the part of the screen where you can see the current status of the implement
based on the icons shown. Depending on the implement equipment, not all of the icons are always
shown.
Information on the metering drives
In this area, you can see:
▪- The seed rate for each connected metering drive. The number
indicates which metering drive is meant. The current value is always shown here.
▪- The changed target rate you have entered.
Information on the rows
In this area, you can see:
▪What is being spread in each row:
–- Seed
▪Whether a tramline is being created on the right side or the left side of the implement:
–- The implement is creating a tramline on the side that is marked with this icon.
Information on the additional functions
In this area, you can see if specific functions are activated.
▪- The waterhole mode is activated.
▪- The metering cells are being filled with seed.
▪- Both bout markers are being used.
▪- The left bout marker is being used.
▪- The right bout marker is being used.
▪- No bout marker is being used.
5
5.1
Procedure
5.2

5
Basic control principles
Layout of the work screen
20
V3.20151130_rev.2
30283620-02-EN
▪- The left bout marker is being used and the change mode of the bout marker is
activated.
▪- The right bout marker is being used and the change mode of the bout marker is
activated.
▪- The obstacle mode is activated.
▪- A hopper has issued an alarm.
▪- The implement is in working position.
▪- The early stop function is activated.
Status information
In this area, you can see:
▪- The current speed of the implement.
▪- The current speed of the fan. The number indicates which fan is meant.
▪- Whether a tramline is being created.
▪- Whether tramline control is deactivated.
▪- Which track you are currently driving on.
Table of contents
Other Muller Elektronik Controllers manuals

Muller Elektronik
Muller Elektronik SPRAYER-Controller Orchard/Vineyard MIDI 3.0 User manual

Muller Elektronik
Muller Elektronik SPRAYER-Controller Orchard/Vineyard MIDI 3.0 User manual

Muller Elektronik
Muller Elektronik ISOBUS TRAIL-Control User manual

Muller Elektronik
Muller Elektronik SLURRY-Controller 3.0 User manual
Popular Controllers manuals by other brands

Smart power
Smart power AVR10-120TBF user guide

Keyautomation
Keyautomation 900CT-101 instruction manual

superbrightleds
superbrightleds DMX-1CH-10A Instructional Sheet

KICK ASS
KICK ASS KA1224MPPT20A user manual

System air
System air WC 120G Installation and owner's manual

DGFLOW
DGFLOW STEADYPRES 2.0 M/M 8.5 manual